Laserfiche WebLink
Electrical <br /> o Continued utility coordination with Snohomish PUD. <br /> o Finalize one-line diagram. <br /> o Finalize equipment elevations. <br /> o Finalize equipment layout schematic. <br /> o Finalize conduit routings. <br /> o Finalize control diagrams. <br /> o Coordination with other disciplines, Structural,Architectural, Process/Mechanical, I&C. <br /> o Finalize illumination design. <br /> o Produce electrical schedules, including conduit/cable, hand hole, and luminaire. <br /> o Finalize Sections and Details. <br /> I&C <br /> o Finalize P&IDs. <br /> o Finalize Instrument and I/O list. <br /> o Finalize Network Schematic. <br /> o Finalize Control Strategy. <br /> o Coordinate with Process/Mechanical and Electrical disciplines. <br /> o Finalize Instrument, Control Equipment, Panel Schedules. <br /> o Finalize I/O and Tag list. <br /> o Finalize Sections and Details. <br /> Deliverables: <br /> 1. 90% Design Drawings—1 electronic file (PDF). <br /> 2. 90% Design Specifications—1 electronic file (PDF). <br /> 3. Review Comment Responses—1 electronic file (PDF). <br /> 4. Final Hydraulics technical memorandum—1 electronic file (PDF). <br /> 5. Hydraulic model—(InfoSWMM format) . <br /> Subtask 2430P—Pacific Avenue (90%) <br /> Assumptions: <br /> • Same as task 2410P <br /> Activities: <br /> • Finalize design development for demolition and site prep. <br /> • Finalize design development for pavement restoration. <br /> • Finalize work limits as needed. <br /> • Finalize development of alignments and profiles for sewer piping and Pacific Regulator <br /> modifications. <br /> • Finalize utility relocation concepts. <br /> • Geotechnical: <br /> April 2022 Page 26 of 35 Jacobs Engineering Group <br />