Laserfiche WebLink
<br />April 2022 Page 3 of 35 Jacobs Engineering Group <br /> <br />• The Consultant will prepare technical specifications for the project in 2004 CSI format, with the <br />exception of the Procurement and Contracting specifications (Division 00), which will be <br />prepared by the City with input from Consultant, as requested. <br />• Design budget is based on the drawing and specification lists included as Attachments A and B./ <br />• Pavement and street layout designs will utilize City’s standard approach. <br />• Design will utilize City approved standard pipe materials. <br />• The City will be responsible for leading the project permitting effort, preparing permit <br />applications and acquiring project permits. The City will prepare SEPA checklist and other <br />environmental activities and permit applications/approvals. Consultant will furnish the 30% level <br />drawings and quantities for excavation and backfill for the SEPA checklist. <br />• The City will be responsible for leading public involvement and public outreach activities and will <br />utilize work products scoped in this scope of services; additional assistance and preparation of <br />work products is not included in this scope. <br />• Traffic control during construction will be the responsibility of the contractor. Traffic control <br />requirements will be provided in the specifications and through general notes on the drawings. <br />No specific traffic control drawings are anticipated. <br />• It is assumed that no environmental remediation is required on this project. <br />• For each submittal the City will provide the Consultant with the following: <br />o Written review comments consolidated on one set of submitted documents. <br />o Comments within three weeks of the date of submittal by the Consultant. <br /> <br />3. CITY FURNISHED DOCUMENTS <br /> <br />For Detailed Design, the City will provide the documentation described herein. Additional <br />documentation and services to be provided are listed in individual task assumptions. <br /> <br />Documentation provided by the City will include: <br />• GIS data for the project area. <br />• Existing information and record drawings of the Pacific Regulator and Pacific Ave. sewer system. <br />• Sewer O (Phase 2) project information and drawings. <br />• Everett Transit project information. <br />• Existing geotechnical data in the vicinity of the projects, if available. <br />• Online links to survey monument data. <br />• Requirements for survey book. <br />• Any supplement to online City Design Standards that might be available. <br />• Standard and Master drawings and specifications. <br />• City Special Provisions. <br />• Sample plans and specifications as a guide to content and format. <br />• Recent unit price-based bid tabs for similar sewer and CSO storage projects, if available. <br /> <br /> <br />