I. GENERAL PROVISIONS
<br />A. GENERAL CONDITIONS, CODES & STANDARDS
<br />1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL
<br />DRAWINGS, GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF
<br />ARCHITECTS (AIA) (NSPE)(NEC) AND ANY OF THE TENANT'S GENERAL REQUIREMENTS
<br />SHALL APPLY UNLESS NOTED OTHERWISE.
<br />2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND
<br />THE GENERAL AND SPECIAL CONDITIONS OF THE AIA FOR ADDITIONAL REQUIREMENTS
<br />REGARDING; SAFETY, COORDINATION & COOPERATION, WORKMANSHIP, PROTECTION,
<br />CUTTING AND PATCHING, DAMAGE TO OTHER WORK, PRELIMINARY OPERATIONS,
<br />STORAGE, ADJUSTMENTS, CLEANING, ETC.
<br />3. ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED,
<br />FEDERAL, STATE AND LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE
<br />TENANT REQUIREMENTS IN ADDITION TO THOSE SPECIFIED.
<br />4. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY
<br />LICENSES, PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS
<br />SHALL INCLUDE ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES
<br />AND THEIR ASSOCIATED FEES OR COSTS.
<br />B. SCOPE OF WORK
<br />1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING,
<br />AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE MECHANICAL SYSTEMS AS
<br />SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY
<br />MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN
<br />THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK
<br />AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE
<br />FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE
<br />TENANT. GENERAL CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED
<br />TO PROVIDE THE TENANT A COMPLETE, CODE APPROVED AND OPERATIONAL
<br />MECHANICAL SYSTEMS.
<br />2. CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME
<br />FAMILIAR WITH ALL TRADES' WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE
<br />PROPER LOCATIONS AND AVOID INTERFERENCES. ANY CONFLICT SHALL BE BROUGHT TO
<br />THE ATTENTION OF THE TENANT BEFORE WORK IS COMMENCED.
<br />3. ALL CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE
<br />SO AS TO COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS, NOTE THE
<br />EXISTING CONDITIONS AND OTHER WORK THAT WILL BE REQUIRED, AND THE NATURE OF
<br />THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. NO ALLOWANCE
<br />SHALL BE MADE TO ALL CONTRACTORS BY REASON OF THIS FAILURE TO HAVE MADE SUCH
<br />EXAMINATION OR OF ANY ERROR ON HIS PART.
<br />4. ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED.
<br />CORRECTIONS TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDITIONAL
<br />COST TO THE TENANT.
<br />5. THIS GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS
<br />WITH THE GENERAL TRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL
<br />DUCT AND LOUVER OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR.
<br />& THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR, MATERIALS AND
<br />MISCELLANEOUS EXPENSES REQUIRED FOR ALL REQUIRED MECHANICAL DEMOLITION OF
<br />THE EXISTING AREAS BEING RENOVATED.
<br />a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL (PROPERLY
<br />DISPOSED OFF SITE UNLESS OTHERWISE NOTED) OF ALL HVAC EQUIPMENT, PIPING,
<br />DUCTWORK, MATERIALS, ETC. NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION
<br />OF THE HVAC SYSTEMS FOR THE NEW RENOVATED AREAS.
<br />b. ALL UNDERGROUND SERVICES NOT BEING REUSED SHALL BE CAPPED BELOW
<br />THE FLOOR.
<br />c. ALL ABOVE GROUND SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE
<br />MAIN AND CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN
<br />IT'S ENTIRETY.
<br />d. COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND
<br />THE ARCHITECT AND THE TENANT'S GENERAL REQUIREMENTS.
<br />7. ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND
<br />LABOR SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND
<br />TENANT. WHERE AN EQUIPMENT MANUFACTURER HAS A WARRANTY THAT EXCEEDS ONE
<br />YEAR, THAT WARRANTY PERIOD SHALL APPLY TO THIS PROJECT.
<br />C. DOCUMENTS
<br />1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS
<br />INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR
<br />COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES SHALL BE MADE
<br />WITH NO ADDITIONAL COST TO THE TENANT.
<br />2. ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS
<br />OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE
<br />COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE INCLUDING IN BID.
<br />3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH
<br />OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE
<br />FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH.
<br />4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR
<br />DISCREPANCIES OCCUR BETWEEN THE SAME, OR BETWEEN THE FIGURES ON
<br />THE DRAWINGS, AND THE SCALE OF SAME OR BETWEEN THE LARGER AND
<br />SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS
<br />SHALL BE REFERRED TO THE TENANT FOR REVIEW AND FINAL DECISION PRIOR
<br />TO THE BID DUE DATE.
<br />5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND
<br />MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE
<br />MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. SUBSTITUTE MANUFACTURERS
<br />MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT AND MATERIAL.
<br />a. SUBSTITUTIONS
<br />(1) THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE
<br />CONTRACT DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO
<br />ESTABLISH A BASE LEVEL OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL
<br />CONTEMPLATE THE USE OF THE EQUIPMENT AND MATERIALS EXACTLY AS INDICATED.
<br />(2) THE GENERAL CONTRACTOR SHALL SUBMIT FOR APPROVAL, WITH
<br />HIS BID QUOTATION, A LIST OF ANY PROPOSED SUBSTITUTIONS OF MATERIALS AND
<br />EQUIPMENT FOR THOSE ON WHICH THE ORIGINAL DESIGN WAS BASED. A FULL
<br />DESCRIPTION OF ALL PROPOSED SUBSTITUTED ITEMS, THE CHANGE TO THEIR BID
<br />PRICE OR OTHER REASONS FOR SUCH SUBSTITUTIONS SHALL ACCOMPANY THE BID. ALL
<br />ACCESSORIES, FEATURES, ETC., SUPPLIED WITH THE SUBSTITUTED MANUFACTURER'S
<br />PRODUCT SHALL ALSO BE INCLUDED IN THE BID.
<br />(3) IF THE GENERAL CONTRACTOR DOES NOT SUBMIT PROPOSED
<br />SUBSTITUTIONS WITH THEIR BID THE TENANT SHALL CONSIDER THE BIDDER TO BE
<br />PROPOSING THE MANUFACTURERS AND MODEL NUMBERS SPECIFIED HEREIN AND SHOWN
<br />ON THE CONTRACT DRAWINGS.
<br />(4) SUBSTITUTIONS AFTER CONTRACT AWARD SHALL NOT BE
<br />PERMITTED.
<br />6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY
<br />RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET
<br />IN THESE SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS.
<br />D. COORDINATION
<br />1. GENERAL CONTRACTOR SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE
<br />INTO CONSIDERATION MECHANICAL, ELECTRICAL AND GENERAL TRADE WORK
<br />CURRENTLY EXISTING AND WORK WHICH MAY BE INSTALLED PRIOR TO
<br />CONTRACT AWARD. RELOCATION OF DUCTWORK, PIPING AND EQUIPMENT, AS
<br />REQUIRED, TO AVOID THIS WORK SHALL BE PROVIDED AT NO ADDITIONAL
<br />COST TO THE TENANT.
<br />2. GENERAL CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING
<br />SITE BEFORE STARTING ANY FABRICATION OR DOING ANY WORK IN THE FIELD
<br />AND SHALL BE RESPONSIBLE FOR THE CORRECT AND PROPER MEASUREMENTS
<br />OF HIS WORK ALONG WITH RESOLUTIONS FOR ANY CONFLICT OF SPACE WITH
<br />OTHER TRADES.
<br />3. WHERE THE WORK OF TWO OR MORE TRADES INTERFERE WITH EACH OTHER
<br />AND A DEVIATION FROM DESIGN IS NECESSARY, NEITHER WORK SHALL
<br />PROCEED UNTIL THE TENANT HAS BEEN NOTIFIED OF THE CONFLICT AND THEY
<br />HAVE RENDERED A DECISION AS TO WHAT CHANGES SHOULD BE MADE.
<br />4. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING
<br />SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL
<br />EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID
<br />DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH
<br />SERVICES SHALL BE PAID BY THE GENERAL CONTRACTOR CAUSING THE
<br />DAMAGE.
<br />5. IT IS ESSENTIAL THAT ALL WORK AT THE PROJECT BE DONE AS SUCH TIME AND
<br />IN SUCH MANNER AS NOT TO INTERFERE WITH THE NORMAL OPERATIONS OF
<br />THE FACILITY, A WORK SCHEDULE SHALL BE ARRANGED WITH THE TENANT TO
<br />FACILITATE WORK WITH A MINIMUM OF INTERFERENCE WITH THE TENANT'S
<br />OPERATIONS.
<br />6. AREAS TO BE USED FOR STORAGE SHALL BE ONLY AS DIRECTED BY THE
<br />TENANT. ALL STORED MATERIAL SHALL BE RELOCATED OR REMOVED FROM THE
<br />SITE AS DIRECTED BY THE TENANT.
<br />7. DAILY, AND AT THE COMPLETION OF THE WORK, EACH GENERAL CONTRACTOR
<br />SHALL REMOVE ALL EXCESS MATERIALS AND DEBRIS CAUSED BY HIS WORK.
<br />UPON COMPLETION OF EACH GENERAL CONTRACTOR'S WORK, CONDITIONS
<br />OF THE SPACE(S) SHALL BE THE SAME AS FOUND PRIOR TO COMMENCEMENT
<br />OF THE WORK. FAILURE TO DO SO MAY RESULT IN THE TENANT'S
<br />EMPLOYMENT OF A SEPARATE SERVICE TO OBTAIN THIS CONDITION AND
<br />REDUCING THE FACTOR'S CONTRACT AMOUNT BY THE COST OF SUCH A
<br />SERVICE.
<br />8. EACH GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE
<br />TO OTHER WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR
<br />HIS SUB -TRADE'S PERSONNEL. ALL PATCHING, REPAIRING, REPLACEMENT AND
<br />PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE TENANT BY THE
<br />CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE
<br />PAID BY THE CONTRACTOR CAUSING THE DAMAGE.
<br />E. METHODS
<br />1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAW
<br />CUT. PIPING SHALL BE LAID ON AN APPROPRIATELY GRADED 6" BED OF CLEAN
<br />AND DRY SAND. ENGINEERED FILL SHALL BE USED TO BACKFILL TO 6" ABOVE
<br />THE PIPING. BACKFILL THE REMAINDER OF THE TRENCH UTILIZING THE
<br />EXCAVATED MATERIAL IF APPROVED BY THE ARCHITECT OR THE TENANT. IF THE
<br />EXCAVATED MATERIALS ARE NOT ACCEPTABLE, ENGINEERED FILL ACCEPTABLE
<br />TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL THE REMAINDER OF THE
<br />TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN 9" LIFTS WITH ALL LIFTS
<br />COMPACTED TO 95% PROCTOR. PATCH FLOOR TO MATCH EXISTING.
<br />2. EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL NOT BE SUPPORTED FROM ANY
<br />CEILINGS, OTHER PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST
<br />BRIDGING. ITEMS SHALL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL
<br />BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL
<br />ENGINEER.
<br />3. ALL ROOF PENETRATIONS, FLASHING AND COUNTER FLASHING SHALL BE
<br />PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE REQUESTING
<br />GENERAL CONTRACTORS COST.
<br />II. INSULATION
<br />A. GENERAL
<br />1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S
<br />RECOMMENDATIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY
<br />PRACTICES.
<br />2. CLEAN AND DRY SURFACES PRIOR TO INSULATING.
<br />3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS,
<br />HANGERS AND SIMILAR PENETRATIONS.
<br />4. INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED.
<br />5. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED.
<br />SEAL ALL PENETRATIONS OF THE VAPOR BARRIER BY STAPLES, HANGERS OR
<br />WHERE OTHERWISE DAMAGED.
<br />6. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES.
<br />7. INSULATION SHALL BE BY OWENS-CORNING, KNAUF, OR MANVILLE.
<br />8. ALL DUCTWORK AND PIPING SHALL BE INSULATED PER REQUIREMENTS OF
<br />ASHRAE 90.1, CHICAGO ENERGY CONSERVATION CODE, NFPA, AND LOCAL
<br />CODES. THE FIRST 10 FEET OF RETURN DUCTS SHALL BE INTERNALLY LINED FOR
<br />ACOUSTICAL ATTENUATION. OUTSIDE AIR DUCTWORK AND DUCTWORK IN
<br />UNCONDITIONED SPACES SHALL ALWAYS BE INSULATED WITH EXTERNAL
<br />INSULATION. PIPING SYSTEMS ALWAYS REQUIRING INSULATION INCLUDES, BUT
<br />IS NOT LIMITED TO, CONDENSATE, REFRIGERANT, CHILLED WATER, HEATING
<br />HOT WATER, CONDENSER WATER, AND STEAM. INTERNALLY INSULATED DUCTS
<br />SHALL HAVE 1 INCH THICK, 1-1/2 LB DENSITY ACOUSTICAL INSULATION (AIR SIDE
<br />BLACK COATED TO MEET NFPA). INSULATION SHALL BE INSTALLED PER THE
<br />REQUIREMENTS OF THE SMACNA GUIDE AND THE MANUFACTURER'S
<br />RECOMMENDATIONS. DUCT SIZES NOTED ON DRAWING ARE INSIDE CLEAR
<br />DIMENSIONS. INSULATION WRAP SHALL BE FIBERGLASS, FOIL BACKED
<br />WRAPPING. WHERE DUCTS OR PIPING IS EXPOSED, AND REQUIRES INSULATION,
<br />PROVIDE FIBERBOARD RIGID INSULATION AND PAINT. PAINT COLOR SHALL BE
<br />COORDINATED WITH THE ARCHITECTURAL DRAWINGS, LANDLORD, AND
<br />TENANT. WHERE DUCTS OR PIPES ARE OUTSIDE THE BUILDING, AN ALUMINUM
<br />JACKET SHALL BE PROVIDED AND INSTALLED OVER THE INSULATION, AND
<br />SEALED WEATHERTIGHT.
<br />B. HVAC
<br />1. INTERNALLY INSULATE WITH 1 INCH THICK, 1-1/2# DENSITY ACOUSTICAL
<br />INSULATION (AIR SIDE BLACK COATED TO MEET NFPA) ALL DUCTWORK NOTED
<br />AS REQUIRING SUCH. INTERNAL INSULATION SHALL BE INSTALLED PER THE
<br />REQUIREMENTS OF THE SMACNA GUIDE AND THE MANUFACTURER'S
<br />RECOMMENDATIONS. DUCT SIZES NOTED ON DRAWING ARE SHEET METAL
<br />DIMENSIONS.
<br />2. ALL SUPPLY AND OUTSIDE AIR DUCTWORK SHALL BE WRAPPED WITH 2 INCH OF
<br />0.75 LB/CU.FT. FIBERGLASS, FOIL BACKED DUCT WRAPPING.
<br />C. PIPING
<br />1. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS
<br />PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP (ASJ/SSL).
<br />2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED
<br />FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING
<br />COVER.
<br />IIL SPRINKLER
<br />A. GENERAL
<br />1. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF NFPA 13,
<br />THE BUILDING TENANT'S INSURANCE COMPANY, THE LOCALLY ENFORCED BUILDING
<br />CODE, LOCAL BUILDING AND FIRE OFFICIALS AND ALL OTHER LOCAL AUTHORITIES
<br />HAVING JURISDICTION.
<br />2. ALL WORK SHALL BE PERFORMED BY A LANDLORD APPROVED, STATE LICENSED
<br />SPRINKLER CONTRACTOR.
<br />3. THIS WORK SHALL INCLUDE ALL PIPING, FITTINGS, HANGERS, EQUIPMENT, ETC.,
<br />REQUIRED TO COMPLETE THE WORK.
<br />4. SPRINKLER HEADS ARE TO BE CENTERED IN LAY -IN CEILING TILES. HEADS ARE TO
<br />BE SPACED SYMMETRICALLY WITH LIGHTING AND OTHER CEILING FIXTURES WHEN
<br />INSTALLED IN DRYWALL CEILINGS.
<br />5. DETERMINE VOLUME AND PRESSURE OF INCOMING WATER SUPPLY FROM WATER
<br />FLOW TEST DATA. REVISE DESIGN WHEN TEST DATA BECOMES AVAILABLE PRIOR TO
<br />SUBMITTALS.
<br />6. SUBMITTALS
<br />a. SHOP DRAWINGS:
<br />(1) PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH
<br />THE MECHANICAL GENERAL PROVISIONS.
<br />(2) SHOW PLANS, CROSS SECTION, ELEVATIONS, DETAILS AND JOB
<br />CONDITIONS, RELATIONSHIP TO OTHER WORK. PIPE SIZES, ELEVATIONS ABOVE
<br />FLOOR, HEAD LOCATIONS, INSPECTORS TEST CONNECTION, SPRINKLER ENTRANCE,
<br />VALVES, ALARMS, BACKFLOW PREVENTER, FLOW SWITCH AND SUPERVISORY DEVICES.
<br />(3) SUBMIT DATA ON THE FOLLOWING ITEMS:
<br />(a) PIPING AND COUPLINGS.
<br />(b) WET ALARM VALVE.
<br />(c) BACKFLOW PREVENTER.
<br />(d) VALVES AND SUPERVISORY DEVICES.
<br />(e) SPRINKLER HEADS AND ESCUTCHEON PLATES.
<br />(f SUPPORTS, HANGERS AND ACCESSORIES.
<br />(q) SEISMIC CALCULATIONS
<br />(4) SUBMIT AND RECEIVE APPROVAL FROM THE AUTHORITY HAVING
<br />JURISDICTION PRIOR TO SUBMITTAL.
<br />(5) ONCE THE AUTHORITY HAVING JURISDICTION HAS APPROVED SHOP
<br />DRAWINGS, THE SUBCONTRACTOR SHALL SEND EIGHT SETS OF APPROVED
<br />STAMPED PLANS AND EQUIPMENT CUTS TO THE ARCHITECT FOR APPROVAL.
<br />(6) PLANS SUBMITTED WITHOUT ALL HYDRAULIC CALCULATIONS WILL
<br />BE RETURNED "REJECTED". PROVIDE INDEPENDENT HYDRAULIC
<br />CALCULATION SHEETS.
<br />(7) ALL SPRINKLER PLANS SHALL BEAR THE STAMP OF A REGISTERED
<br />PROFESSIONAL FIRE PROTECTION ENGINEER LICENSED WITH THE
<br />STATE WHERE THE STORE IS LOCATED.
<br />(8) AT THE COMPLETION OF THE PROJECT, PROVIDE TENANT WITH
<br />OPERATION AND MAINTENANCE MANUALS INCLUDING "AS -BUILT"
<br />RECORD DRAWINGS, SPECIFICATIONS AND APPROVED PLANS.
<br />B. CRITERIA
<br />1, GENERAL CONTRACTOR SHALL VERIFY WITH THE LANDLORD'S PROJECT
<br />MANAGER FOR ANY ADDITIONAL CRITERIA (PIPE SIZING; PIPE SCHEDULE OR
<br />HYDRAULIC).
<br />2, DESIGN AND INSTALL THE SPRINKLER SYSTEM AND PIPING TO CONFORM WITH
<br />NFPA 13, ORDINARY HAZARD DESIGN WITH A MAXIMUM SPACING OF 130
<br />SQUARE FEET PER SPRINKLER HEAD IN SALES AREAS AND 100 SQUARE FEET PER
<br />HEAD IN STOCK AREAS.
<br />3. THE PROJECT AREA CURRENTLY HAS AN EXISTING SPRINKLER SYSTEM INSTALLED
<br />WITH FLUSH SPRINKLER HEADS INSTALLED ON A STANDARD GRID PATTERN.
<br />GENERAL CONTRACTOR SHALL DESIGN AND MODIFY THE EXISTING SPRINKLER
<br />SYSTEM PIPING AND HEADS. THIS WORK SHALL INCLUDE THE RAISING OF ANY
<br />EXISTING SPRINKLER PIPING WHICH INTERFERES WITH DESIGNED CEILING
<br />ELEVATIONS. SEE ARCH. DRAWINGS FOR CEILING ELEVATIONS. PROVIDE ANY
<br />AUXILIARY DRAIN PIPING REQUIRED FOR ANY TRAPPED SPRINKLER PIPING.
<br />4. SEE ARCH. DRAWINGS FOR CEILING ELEVATIONS.
<br />C. COMPONENTS
<br />1. PROVIDE A WATTS REGULATOR NO. (007-LF 3/4 TO 2.5" 009 2" TO 10") DOUBLE
<br />CHECK VALVE ASSEMBLY BACKFLOW PREVENTER IN THE PIPING TO THE
<br />SPRINKLER HEADS IMMEDIATELY FOLLOWING THE CONNECTION TO THE
<br />DOMESTIC WATER SYSTEM.
<br />2, FIRE DEPARTMENT CONNECTION: POTTER-ROEMER OR EQUAL SERIES 5020, 4 x
<br />2112 x 2`/z, WITH ALL STANDARD FEATURES, "AUTO. SPKR." LETTERING, AND
<br />THREAD TO MATCH LOCAL FIRE DEPARTMENT REQUIREMENTS. - FLUSH
<br />MOUNTED FIRE DEPARTMENT INLET CONNECTION WITH WALL PLATE WITH
<br />"AUTOMATIC SPRINKLER" IDENTIFICATION, ALL BRASS CONSTRUCTION AND
<br />POLISHED BRASS FINISH. CONTACT THE FIRE DEPARTMENT TO VERIFY FIRE
<br />DEPARTMENT CONNECTION TYPE AND TREAD PATTERN TO MATCH THAT OF
<br />THE FIRE DEPARTMENT EQUIPMENT, PROVIDE 4" UL LISTED CHECK VALVE WITH
<br />BALL DRIP PIPED TO DRAIN.
<br />D. SUPERVISION:
<br />1. THE RISER CONTROL VALVE AND ALL ZONE VALVES SHALL HAVE ELECTRIC
<br />SUPER VISION TO SIGNAL THE BUILDING FIRE ALARM SYSTEM. TAMPER
<br />SWITCHES PROVIDED BY SPRINKLER SUBCONTRACTOR AND WIRED BY THE
<br />ELECTRICAL SUBCONTRACTOR.
<br />2. MECHANICAL: ALL OTHER VALVES SHALL BE PADLOCKED IN STANDARD
<br />OPERATING POSITION, WITH 2 KEYS PER PADLOCK AND ALL PADLOCKS SHALL
<br />BE KEYED THE SAME, CHAIN AND PADLOCK ALL VALVES OVER 2" SIZE.
<br />E. PIPING
<br />1. PIPING SHALL BE BLACK STEEL PIPE PER NFPA 13.
<br />2. PIPE HANGERS FOR THE SPRINKLER SYSTEM SHALL BE ADJUSTABLE CLEVIS
<br />HANGERS WITH APPROPRIATE CLAMP (DEPENDING ON STRUCTURE). ALL PIPING
<br />SHALL BE SUPPORTED ON A MAXIMUM OF 10' CENTERS.
<br />F. SPRINKLER HEADS
<br />1. SPRINKLER HEADS IN AREAS WITH CEILINGS SHALL BE CENTRAL SPRINKLER
<br />CORP, DIVISION OF TYCO, SERIES TY-L, 112" ORIFICE, RECESSED, POLISHED
<br />CHROME PENDANT AUTOMATIC SPRINKLER HEAD WITH TWO PIECE FACTORY
<br />WHITE METAL ESCUTCHEON.
<br />2. SPRINKLER HEADS IN AREAS WITH DRYWALL CEILINGS SHALL BE CENTRAL
<br />SPRINKLER CORP, DIVISION OF TYCO. ROYAL FLUSH 11 SERIES RFII, 165 F, WITH A
<br />WHITE CEILING PLATE.
<br />3. SPRINKLER HEADS IN AREAS WITH EXPOSED STRUCTURE SHALL BE BRASS
<br />UPRIGHT CENTRAL SPRINKLER CORP. DIVISION OF TYCO SERIES TY-L,'/2' ORIFICE,
<br />165 F.
<br />4. SPRINKLER SYSTEM TO BE DESIGN BUILD PER BUILDING CRITERIA, LOCAL CODES
<br />AND LUXO T TICA STANDARDS.
<br />IV. PIPING
<br />A. GENERAL
<br />1. THE ENTIRE PIPING INSTALLATION, MATERIALS, EQUIPMENT, ETC. SHALL
<br />CONFORM TO THE REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING
<br />CODE, THE MECHANICAL CODE.
<br />2. TEST ALL PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES.
<br />3. FURNISH ACCESS DOORS FOR VALVES.
<br />4, THIS GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SERVICES
<br />FOR ALL EQUIPMENT WHETHER PROVIDED BY THIS GENERAL CONTRACTOR
<br />OR OTHERS. GENERAL CONTRACTOR SHALL COORDINATE HIS INSTALLATION WITH THE
<br />APPROPRIATE EQUIPMENT SUPPLIER AND SHALL REVISE THE DESIGN AS REQUIRED TO
<br />MATCH THE EQUIPMENT BEING SUPPLIED. THIS GENERAL CONTRACTOR SHALL PROVIDE
<br />ALL LABOR AND MATERIALS REQUIRED TO CONNECT ALL EQUIPMENT TO THE PIPING
<br />SYSTEMS INCLUDING BUT NOT LIMITED TO; CONDENSATE, REFRIGERANT, CHILLED WATER,
<br />HEATING HOT WATER, CONDENSER WATER, STEAM, ETC.
<br />S. FIRE STOPPING - REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL
<br />CONSTRUCTION DESIGN NUMBER. FOR RATED MASONRY WALL AND FLOOR
<br />ASSEMBLIES, PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP
<br />SYSTEM NUMBER C-AJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES, PROVIDE
<br />A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER
<br />W-L-1003,
<br />B. CONDENSATE DRAINS, CONDENSER WATER UP TO 2" ABOVE GRADE AND
<br />UNDER 125 PSIG
<br />1. ASTM B88, TYPE L, HARD DRAWN COPPER PIPE; AND ASME B16,18, CAST BRASS,
<br />OR ASME B16.22, SOLDER WROUGHT COPPER FITTINGS.
<br />V. HVAC EQUIPMENT
<br />A. INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S
<br />INSTALLATION INFORMATION AND INSTRUCTIONS, REQUIREMENTS AND ANY ADDITIONAL
<br />GUIDELINES. GENERAL CONTRACTOR SHALL PROVIDE ALL ADDITIONAL REQUIRED
<br />ACCESSORIES REQUIRED TO COMPLETE THE INSTALLATIONS.
<br />B. HVAC EQUIPMENT SHALL BE "STARTED UP" BY A FACTORY TRAINED AND
<br />AUTHORIZED SERVICE TECHNICIAN. ALL FACTORY STARTUP FORMS SHALL BE COMPLETED
<br />AND TURNED OVER TO THE TENANT WITH ALL COMPLETED WARRANTY CARDS PRIOR TO
<br />FINAL APPROVAL.
<br />C. ROOFTOP UNITS
<br />1. GAS FIRED ROOFTOP UNIT - CONSTANT VOLUME (RTU-1,2)
<br />a.WALL MOUNTED SEVEN DAY PROGRAMMABLE THERMOSTAT SHALL
<br />SEQUENCE HEATING, COOLING AND DEHUMIDIFICATION. PROVIDE WITH
<br />SUB -BASE TO MANUALLY SELECT HEATING, COOLING, FAN ON -OFF, AUTO
<br />OPERATION.
<br />b. UNIT SHALL OPERATE IN OCCUPIED OR UNOCCUPIED MODES BASED UPON
<br />TIME CLOCK SEQUENCE AS DETERMINED BY OWNER.
<br />c.UN000UPIED MODE - THE SUPPLY FAN WILL BE OFF, THE OUTDOOR AIR
<br />DAMPER WILL GO TO 100% CLOSED POSITION AND UNIT WILL CYCLE ON WITH
<br />A CALL FOR HEATING, COOLING OR DEHUMIDIFICATION. DURING THE
<br />UNOCCUPIED MODE, RTU SHALL REMAIN OFF DURING THE COOLING SEASON;
<br />DURING THE HEATING SEASON, RTU SHALL CYCLE ON WITH OUTSIDE AIR
<br />DAMPERS REMAINING CLOSED TO MAINTAIN A SPACE SET -BACK TEMPERATURE
<br />OF 60 DEG F (ADJUSTABLE) AS SENSED BY A NIGHT SETBACK SPACE
<br />TEMPERATURE SENSOR.
<br />d. OCCUPIED MODE- THE SUPPLY FAN SHALL RUN CONTINUOUSLY, THE
<br />OUTDOOR AIR DAMPER WILL MODULATE TO THE REQUIRED POSITION BASED
<br />ON VENTILATION SEQUENCING AND THE UNIT WILL GO INTO THE HEATING,
<br />COOLING OR DEHUMIDIFICATION MODE BASED UPON ROOM THERMOSTAT
<br />AND HUMIDISTA T SET POINTS.
<br />1) UPON A CALL FOR HEATING, THE GAS BURNER SHALL FIRE. STAGE 1
<br />HEATING SHALL BE ENABLED WHEN THE ZONE TEMPERATURE DROPS
<br />1.5 DEGREE (ADJUSTABLE) BELOW SETPOINT. STAGE 2 HEATING SHALL BE
<br />ENABLED WHEN THE ZONE TEMPERATURE DROPS 3 DEGREES
<br />(ADJUSTABLE) BELOW SETPOINT.
<br />2) UPON A CALL FOR COOLING, THE STAGE 1 COMPRESSOR SHALL
<br />ENERGIZE. STAGE 1 COOLING SHALL BE ENABLED WHEN THE ZONE
<br />TEMPERATURE RISES 1.5 DEGREE (ADJUSTABLE) ABOVE SETPOINT. STAGE
<br />2 COOLING SHALL BE ENABLED WHEN THE ZONE TEMPERATURE RISES 3
<br />DEGREES (ADJUSTABLE) ABOVE SETPOINT.
<br />3) WHEN THERE IS A CALL FOR DEHUMIDIFICATION WITHOUT A CALL FOR
<br />COOLING, HOT GAS REHEAT MODE SHALL BE ENABLED. WHEN THE
<br />RELATIVE HUMIDITY IN THE CONTROLLED SPACE (AS MEASURED BY THE
<br />SENSOR ASSIGNED TO SPACE HUMIDITY SENSING) RISES ABOVE THE
<br />SPACE HUMIDITY SETPOINT (50% RH ADJUSTABLE), COMPRESSORS AND
<br />THE SUPPLY FAN WILL ENERGIZE TO REDUCE THE HUMIDITY IN THE
<br />SPACE. THE COMPRESSORS AND HOT GAS REHEAT COIL SHALL
<br />MODULATE TO PROVIDE NEUTRAL DEHUMIDIFIED AIR INTO THE SPACE.
<br />DURING ACTIVE DEHUMIDIFICATION THE UNIT DISCHARGE AIR WILL BE
<br />CONTROLLED TO THE SUPPLY AIR REHEAT SETPOINT BY MODULATING
<br />THE AMOUNT OF REHEAT PRODUCED BY THE REHEAT COIL. THE SUPPLY
<br />AIR REHEAT SETPOINT, OCCUPIED AND UNOCCUPIED
<br />DEHUMIDIFICATION SETPOINTS ARE ADJUSTABLE VIA THE HUMAN
<br />INTERFACE OR BAS/NETWORK CONTROL. ACTIVE DEHUMIDIFICATION
<br />WILL BE TERMINATED WHEN THE HUMIDITY IN THE SPACE IS REDUCED
<br />BY 5% LOWER THAN THE SPACE HUMIDITY SETPOINT OR WHEN AN
<br />OVERRIDING CONDITION SUCH AS HEATING OR COOLING DEMAND OR
<br />A FAILURE OCCURS IN A COMPONENT REQUIRED FOR
<br />DEHUMIDIFICATION.
<br />e.ENTHALPY ECONOMIZER
<br />1) THE ECONOMIZER SHALL BE ENABLED WHENEVER:
<br />THE OUTSIDE AIR DRY-BULB TEMPERATURE IS LESS THAN THE RETURN
<br />AIR DRY-BULB TEMPERATURE AND THE FAN STATUS IS ON,
<br />2) WHEN THE OUTSIDE AIR DEW POINT IS LESS THAN THE RETURN AIR
<br />DEW POINT BY AN ADJUSTABLE DEAD BAND (3 DEG F), THE OUTDOOR
<br />AIR DAMPER(S) SHALL BE SET FOR 100% OUTDOOR AIR
<br />3) WHEN THE OUTDOOR AIR TEMPERATURE IS LESS THAN THE SUPPLY AIR
<br />TEMPERATURE SET POINT THE OUTDOOR AIR DAMPER, EXHAUST AIR
<br />DAMPER, AND RETURN AIR DAMPER WILL MODULATE, AS APPROPRIATE,
<br />BETWEEN THE ADJUSTABLE MINIMUM POSITION AND FULL OPEN
<br />POSITION TO MAINTAIN A MIXED AIR TEMPERATURE SETPOINT (55 DEG
<br />F ADJUSTABLE) UNTIL ROOM COOLING SETPOINT IS REACHED.
<br />4) WHEN THE RETURN AIR DEW POINT IS GREATER THAN THE OUTDOOR
<br />AIR DEW POINT OR THE OUTDOOR AIR TEMPERATURE IS GREATER THAN
<br />THE RETURN AIR TEMPERATURE THE EXHAUST AIR DAMPER, RETURN AIR
<br />DAMPER AND OUTSIDE AIR DAMPER SHALL BE POSITIONED TO THE
<br />MINIMUM CONTROL AIR POSITION AND THE UNIT SHALL OPERATE IN
<br />MECHANICAL COOLING.
<br />5) THE ECONOMIZER SHALL CLOSE TO 0% (OUTSIDE AIR AND EXHAUST
<br />DAMPERS SHALL BE CLOSED AND RETURN AIR DAMPER SHALL BE OPEN)
<br />WHENEVER:
<br />SUPPLY FAN OR RETURN FAN IS OFF
<br />OR MIXED AIR TEMPERATURE IS LESS THAN 40°F
<br />OR ON LOSS OF FAN STATUS
<br />OR THE DISCHARGE AIR TEMPERATURE SENSOR HAS FAILED
<br />OR THE RTU IS IN THE MORNING WARM-UP OR COOL -DOWN
<br />MODE
<br />OR THE UNIT IS IN UNOCCUPIED MODE
<br />6) THE OUTDOOR AIR DAMPER SHALL BE SET TO ITS MINIMUM POSITION IF
<br />THE ECONOMIZER FUNCTION IS DISABLED. MAINTAIN MINIMUM
<br />OUTSIDE AIR BY SETTING THE OUTDOOR AIR DAMPER TO THE MINIMUM
<br />POSITION AS ADJUSTED BY THE T&B CONTRACTOR TO MEET THE
<br />SCHEDULED MINIMUM OSA QUANTITY.
<br />f. A DUCT MOUNTED, PHOTOELECTRIC SMOKE DETECTOR (FURNISHED BY
<br />ELECTRICAL CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR)
<br />SHALL SHUT DOWN THE UNIT, CLOSE THE OUTSIDE AIR DAMPER AND SEND A
<br />SIGNAL TO THE FIRE ALARM PANEL WHEN ACTIVATED. BOTH SAFETIES WILL
<br />REQUIRE MANUAL RESET, AND WILL ACTIVATE AN ALARM AT THE LOCAL
<br />CONTROL PANEL.
<br />a. ALL POINTS AND SETTINGS SHALL BE ADJUSTABLE.
<br />AIR DISTRIBUTION
<br />A. AIR DISTRIBUTION
<br />1. DUCTWORK (ROUND OR RECTANGULAR OR SPIRAL) SHALL BE OF GALVANIZED
<br />STEEL CONSTRUCTION AND SHALL BE INSTALLED IN ACCORDANCE WITH THE
<br />LATEST EDITION OF THE SMACNA MANUAL AND THE FOLLOWING PRESSURE /
<br />SEAL SCHEDULE:
<br />a. DUCTWORK BETWEEN AHU (ROOFTOP UNIT) AND VAV BOXES - 3" W.G.
<br />POSITIVE PRESSURE, FAIL CLASS A.
<br />b. OTHER SUPPLY AIR DUCTWORK- 2" W.G. POSITIVE PRESSURE, SEAL
<br />CLASS B.
<br />c. RETURN & EXHAUST DUCTWORK - 2" W.G. NEGATIVE PRESSURE, SEAL
<br />CLASS B.
<br />2. ROUND DUCT ELBOWS SHALL BE I-ONG SWEEP, 1-1/2 TIMES THE CENTERLINE
<br />RADIUS UNLESS CLEARANCE IS NOT AVAILABLE AT WHICH TIME MITERED
<br />ELBOWS WITH TURNING VANES SHALL BE UTILIZED.
<br />3. RECTANGULAR ELBOWS SHALL BE FURNISHED WITH DOUBLE THICKNESS
<br />TURNING VANES. TURNING VANES SHALL BE FASTENED WITH A DOUBLE ROW
<br />OF SCREWS.
<br />4. FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF THE RTU. INSTALL
<br />FLEXIBLE CONNECTIONS WITH 3" WIDE DOUBLE NEOPRENE COATED FLAME
<br />RETARDANT, NFPA 90A APPROVED, FIBERGLASS FLEXIBLE CONNECTION.
<br />FLEXIBLE CONNECTION TO HAVE A MINIMUM OF 24 GAGE, 3" WIDE SHEET
<br />METAL COLLARS PERMANENTLY ATTACHED TO EACH SIDE.
<br />5. MITERED OFFSETS GREATER THAN 30 DEGREES IN EITHER DIRECTION SHALL
<br />NOT BE PERMITTED.
<br />6. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A
<br />MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF 15DEGREES.
<br />7. RECTANGULAR BALANCING DAMPERS - RUSKIN MD25 SHALL BE SINGLE BLADE
<br />UP TO 6" IN HEIGHT AND 36" IN WIDTH, AND RUSKIN MD35 MULTI -BLADE FOR
<br />LARGER SIZES, ALL ROUND BALANCING DAMPERS SHALL BE COMMERCIAL
<br />GRADE SINGLE BLADE UP TO 16" IN DIAMETER SHALL INCORPORATE LOCKING
<br />TYPE INDICATING ADJUSTMENT. BALANCING DAMPERS SHALL BE INSTALLED IN
<br />ALL BRANCH DUCTS OFF MAIN AND ON ALL TAPS OFF DUCTS TO DIFFUSERS
<br />UNLESS OTHERWISE NOTED ON DRAWINGS.
<br />8. FINAL CONNECTIONS TO DIFFUSERS MAY BE MADE WITH FLEXIBLE DUCTWORK
<br />BUT IT'S USE IS LIMITED TO STRAIGHT HORIZONTAL OR VERTICAL RUNS. ALL
<br />CHANGES OF DIRECTION IN AN DUCT SYSTEM (GALVANIZED OR FLEXIBLE)
<br />SHALL BE MADE WITH AN APPROPRIATE GALVANIZED ELBOW. MAXIMUM
<br />LENGTH OF ANY FLEXIBLE DUCT IS 5'-0".
<br />9. FLEXIBLE DUCTS TO DIFFUSERS SHALL BE ATCO RUBBER PRODUCTS, INC. MODEL
<br />UPC #070, INSULATED (R=4.2), U.L. 181 RATED AND CLASS 1 AIR CONNECTOR.
<br />MAXIMUM LENGTH OF FLEXIBLE DUCT TO DIFFUSER TO BE 5'-0".
<br />10. FIRE DAMPERS SHALL BE RUSKIN AND SHALL BE INSTALLED PER
<br />MANUFACTURER'S INSTRUCTIONS AND SMACNA REQUIREMENTS FOR A U.L.
<br />APPROVED INSTALLATION. FIRE DAMPERS SHALL BE TYPE "B" (BLADES AND
<br />FRAME COMPLETELY OUT OF THE AIRSTREAM) FOR ALL WALL ASSEMBLIES AND
<br />SHALL BE INSTALLED WITH THE APPROPRIATE WALL SLEEVE AND ANGLES PER
<br />UL 555. FIRE DAMPERS SHALL BE INSTALLED IN ALL FIRE RATED WALLS. VERIFY
<br />FIRE RATED WALL LOCATIONS AND RATINGS ON THE ARCHITECTURAL
<br />DOCUMENTS. FOR ALL FLOOR PENETRATIONS PROVIDE RUSKIN TYPE "LR" FIRE
<br />DAMPERS. SEE DETAILS ON DRAWINGS FOR ADDITIONAL INSTALLATION
<br />REQUIREMENTS.
<br />11. DOUBLE THICKNESS INSULATED ACCESS DOORS SHALL BE PROVIDED AT ALL
<br />FIRE DAMPERS FOR ACCESS TO FUSIBLE LINK. DOOR SHALL BE SIZED TO ALLOW
<br />FOR EASY SERVICE AND ACCESSIBILITY, ACCESS DOORS SHALL BE A MINIMUM
<br />OF 24" IN THE LONGEST DIMENSION.
<br />12. PROVIDE 3"x3"x1/4" ANGLE FRAMING AROUND THE ROOF OPENINGS FOR THE
<br />SUPPLY AND RETURN AIR DUCTWORK.
<br />13. SUPPORT ALL SHEET METAL AND EQUIPMENT FROM ANGLE IRON CONNECTED
<br />TO STRUCTURAL STEEL. DO NOT SUSPEND DUCT OR EQUIPMENT FROM METAL
<br />DECK OR JOIST BRIDGING.
<br />VII. CONTROLS
<br />A. CONTROL WIRING SHALL BE PLENUM RATED CABLE WITH COLOR CODED
<br />18 AWG WIRES (MINIMUM).
<br />B. CONTROLS CONTRACTOR SHALL PROVIDE ALL WIRING BETWEEN THERMOSTAT
<br />AND EQUIPMENT (AIR HANDLER, ROOFTOP UNIT, CONDENSING UNIT, ETC.).
<br />C. CONTROLS CONTRACTOR SHALL FURNISH AND INSTALL A 120 (24) VOLT SUPPLY
<br />AIR DUCT MOUNTED IONIZATION SMOKE DETECTOR. DETECTOR SHALL BE WIRED, BY THE
<br />ELECTRICAL (CONTROLS) CONTRACTOR, TO SHUT DOWN UNIT UPON ACTIVATION.
<br />D. THERMOSTATS
<br />1. FURNISH AND INSTALL A HONEYWELL 7 DAY PROGRAMMABLE
<br />HEATING/COOLING THERMOSTAT AND CLEAR LOCKABLE COVER WITH
<br />APPROPRIATE CONTROL WIRING BETWEEN THERMOSTAT, (FURNACE AND
<br />CONDENSING UNIT) ( ROOFTOP) AS REQUIRED TO PROVIDE A COMPLETE
<br />OPERATING SYSTEM. WIRING SHALL BE MINIMUM 18 AWG.
<br />2. THERMOSTATS SHALL BE MOUNTED WHERE INDICATED ON THE DOCUMENTS.
<br />3. MECHANICAL CONTRACTOR SHALL PROGRAM THERMOSTAT PER THE TENANT'S
<br />REQUIREMENTS AND TRAIN TENANT'S PERSONNEL IN THE OPERATION AND
<br />PROGRAMMING OF THE _THERMOSTAT AND SYSTEM.
<br />VIII. TESTING AND BALANCING
<br />A. TESTING AND BALANCING SHALL NOT BEGIN UNTIL THE SYSTEM HAS BEEN
<br />COMPLETED, IS IN FULL WORKING ORDER AND ALL EQUIPMENT START-UP HAS BEEN
<br />COMPLETED. ALL HVAC SYSTEMS AND EQUIPMENT SHALL BE PUT INTO FULL OPERATION
<br />AND THE OPERATION OF SAME CONTINUED DURING EACH WORKING DAY OF THE TESTING
<br />AND BALANCING.
<br />B. AN INDEPENDENT "AABC" OR "NEBB" CERTIFIED AIR AND WATER BALANCE
<br />CONTRACTOR SHALL TEST AND BALANCE THE SYSTEM AND REPORT RESULTS TO THE
<br />ENGINEER TENANT AND THE LANDLORD.
<br />1. ALL WORK SHALL BE DONE UNDER DIRECT SUPERVISION OF THE CERTIFIED
<br />BALANCING ENGINEER AND BY QUALIFIED BALANCING TECHNICIANS.
<br />2. METHODS AND FORMS SHALL BE IN ACCORDANCE WITH THE
<br />CERTIFICATION AGENCIES RECOMMENDATIONS AND REQUIREMENTS,
<br />3. COMPLY WITH ASHRAE RECOMMENDATIONS PERTAINING TO MEASUREMENTS,
<br />INSTRUMENTS, TESTING, ADJUSTING AND BALANCING.
<br />4. ALL QUANTITIES SHALL BE WITHIN 10% OF THE DESIGN VALUES.
<br />5. MECHANICAL CONTRACTOR SHALL PROVIDE ANY SHEAVE CHANGES
<br />REQUIRED ON THE HVAC UNIT.
<br />C. PERFORMANCE TEST
<br />1. AFTER ALL HVAC EQUIPMENT IS INSTALLED, TESTED AND BALANCED AS
<br />SPECIFIED HEREIN THEY SHALL BE OPERATED AND PLACED UNDER
<br />SURVEILLANCE FOR A PERIOD OF AT LEAST ONE (1) DAY, THIS MAY INCLUDE THE
<br />DAY OF STARTUP, TO VERIFY THAT ALL EQUIPMENT IS PRODUCING THE
<br />REQUIRED CAPACITY. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />THE OPERATION OF THE EQUIPMENT DURING THE ENTIRE PERIOD.
<br />2. TEST SHALL BE PERFORMED
<br />WITH ALL CONTROLS IN THE AUTOMATIC POSITION
<br />AND BUILDING LIGHTS, DAMPERS, ETC, POSITIONED TO SIMULATE NORMAL
<br />OPERATION OF THE HVAC SYSTEM.
<br />3. DURING THE TEST, CONTROL SETTINGS MAY REQUIRE ADDITIONAL
<br />ADJUSTMENTS TO PRODUCE THE BEST BALANCED SYSTEM OPERATION. THEIR
<br />FINAL SETTING OF EACH OPERATING AND SAFETY CONTROL SHALL BE
<br />RECORDED, THEY SHALL INCLUDE, BUT NOT LIMITED TO, THERMOSTATS, LIMIT
<br />CONTROLS, AND OTHER SIMILAR ITEMS.
<br />4. SHOULD COMPLETION OF THE INSTALLATION OCCUR AT SUCH TIME THAT THE
<br />REQUIRED PERFORMANCE TEST MUST BE CONDUCTED DURING A SEASON
<br />WHEN THE FULL OPERATION OF EITHER THE HEATING OR COOLING SYSTEM
<br />CAN NOT BE CHECKED, THE MECHANICAL CONTRACTOR SHALL PERFORM THE
<br />TEST AND RECORD ALL SUCH DATA AS IS AVAILABLE WITH SYSTEM OPERATING
<br />AUTOMATICALLY UNDER THE PREVAILING WEATHER CONDITIONS. THAT PART
<br />OF THE SYSTEM WHICH CAN NOT BE TESTED SHALL BE DELAYED UNTIL THE
<br />WEATHER IS APPROPRIATE, AT WHICH TIME THE REMAINING PART OF THE
<br />REQUIRED TESTS SHALL BE CONDUCTED AND DATA RECORDED ACCORDINGLY.
<br />D. ACCEPTANCE AND CHECK-OUT - GENERAL CONTRACTOR SHALL PROVIDE
<br />QUALIFIED PERSONNEL, AT NO ADDITIONAL COST TO THE TENANT, AS MAY BE REQUIRED
<br />BY THE ENGINEER FOR THE PURPOSE OF VERIFYING PROPER OPERATION AND
<br />INSTALLATION OF THEIR WORK AT THE TIME OF REQUEST FOR ACCEPTANCE.
<br />STORE 06261
<br />EVERETT MALL 0
<br />910 CENTER
<br />910 SE EVERETT MALL WAY
<br />E E ETT, WA 98208
<br />Construction for:
<br />DQ
<br />Qo
<br />Revisions;
<br />Mark Date
<br />0
<br />Architect Job No.:
<br />33N2022
<br />Nextore Store Design Revision No.:
<br />Nextore Project
<br />Number 86841
<br />Brand Desi n Type:
<br />SKI
<br />ISSUED FOR:
<br />0 CONSTRUCTION
<br />Title
<br />MECHANICAL
<br />SPECIFICATIONS
<br />Date Sheet _
<br />04/19/2022
<br />Drawn By
<br />TBA ,�
<br />Checked By
<br />
|