Laserfiche WebLink
I. GENERAL PROVISIONS <br />A. GENERAL CONDITIONS, CODES & STANDARDS <br />1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL <br />DRAWINGS, GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF <br />ARCHITECTS (AIA) (NSPE)(NEC) AND ANY OF THE TENANT'S GENERAL REQUIREMENTS <br />SHALL APPLY UNLESS NOTED OTHERWISE. <br />2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND <br />THE GENERAL AND SPECIAL CONDITIONS OF THE AIA FOR ADDITIONAL REQUIREMENTS <br />REGARDING; SAFETY, COORDINATION & COOPERATION, WORKMANSHIP, PROTECTION, <br />CUTTING AND PATCHING, DAMAGE TO OTHER WORK, PRELIMINARY OPERATIONS, <br />STORAGE, ADJUSTMENTS, CLEANING, ETC. <br />3. ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, <br />FEDERAL, STATE AND LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE <br />TENANT REQUIREMENTS IN ADDITION TO THOSE SPECIFIED. <br />4. GENERAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY <br />LICENSES, PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS <br />SHALL INCLUDE ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES <br />AND THEIR ASSOCIATED FEES OR COSTS. <br />B. SCOPE OF WORK <br />1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, <br />AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE MECHANICAL SYSTEMS AS <br />SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY <br />MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN <br />THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK <br />AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE <br />FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE <br />TENANT. GENERAL CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED <br />TO PROVIDE THE TENANT A COMPLETE, CODE APPROVED AND OPERATIONAL <br />MECHANICAL SYSTEMS. <br />2. CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME <br />FAMILIAR WITH ALL TRADES' WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE <br />PROPER LOCATIONS AND AVOID INTERFERENCES. ANY CONFLICT SHALL BE BROUGHT TO <br />THE ATTENTION OF THE TENANT BEFORE WORK IS COMMENCED. <br />3. ALL CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE <br />SO AS TO COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS, NOTE THE <br />EXISTING CONDITIONS AND OTHER WORK THAT WILL BE REQUIRED, AND THE NATURE OF <br />THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. NO ALLOWANCE <br />SHALL BE MADE TO ALL CONTRACTORS BY REASON OF THIS FAILURE TO HAVE MADE SUCH <br />EXAMINATION OR OF ANY ERROR ON HIS PART. <br />4. ALL EXISTING UTILITY AND MECHANICAL SERVICES SHALL BE FIELD VERIFIED. <br />CORRECTIONS TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDITIONAL <br />COST TO THE TENANT. <br />5. THIS GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS <br />WITH THE GENERAL TRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL <br />DUCT AND LOUVER OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR. <br />& THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR, MATERIALS AND <br />MISCELLANEOUS EXPENSES REQUIRED FOR ALL REQUIRED MECHANICAL DEMOLITION OF <br />THE EXISTING AREAS BEING RENOVATED. <br />a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL (PROPERLY <br />DISPOSED OFF SITE UNLESS OTHERWISE NOTED) OF ALL HVAC EQUIPMENT, PIPING, <br />DUCTWORK, MATERIALS, ETC. NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION <br />OF THE HVAC SYSTEMS FOR THE NEW RENOVATED AREAS. <br />b. ALL UNDERGROUND SERVICES NOT BEING REUSED SHALL BE CAPPED BELOW <br />THE FLOOR. <br />c. ALL ABOVE GROUND SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE <br />MAIN AND CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN <br />IT'S ENTIRETY. <br />d. COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND <br />THE ARCHITECT AND THE TENANT'S GENERAL REQUIREMENTS. <br />7. ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND <br />LABOR SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND <br />TENANT. WHERE AN EQUIPMENT MANUFACTURER HAS A WARRANTY THAT EXCEEDS ONE <br />YEAR, THAT WARRANTY PERIOD SHALL APPLY TO THIS PROJECT. <br />C. DOCUMENTS <br />1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS <br />INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR <br />COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES SHALL BE MADE <br />WITH NO ADDITIONAL COST TO THE TENANT. <br />2. ANY INCIDENTAL ITEMS OR LABOR, ETC. NOT INCLUDED IN THE SPECIFICATIONS <br />OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE <br />COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE INCLUDING IN BID. <br />3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH <br />OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE <br />FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH. <br />4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR <br />DISCREPANCIES OCCUR BETWEEN THE SAME, OR BETWEEN THE FIGURES ON <br />THE DRAWINGS, AND THE SCALE OF SAME OR BETWEEN THE LARGER AND <br />SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS <br />SHALL BE REFERRED TO THE TENANT FOR REVIEW AND FINAL DECISION PRIOR <br />TO THE BID DUE DATE. <br />5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND <br />MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE <br />MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. SUBSTITUTE MANUFACTURERS <br />MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT AND MATERIAL. <br />a. SUBSTITUTIONS <br />(1) THE MANUFACTURERS AND MODEL NUMBERS INDICATED IN THE <br />CONTRACT DOCUMENTS ARE FOR THE PURPOSE OF DESCRIPTION AND TO <br />ESTABLISH A BASE LEVEL OF QUALITY. THE GENERAL CONTRACTOR'S BID WILL <br />CONTEMPLATE THE USE OF THE EQUIPMENT AND MATERIALS EXACTLY AS INDICATED. <br />(2) THE GENERAL CONTRACTOR SHALL SUBMIT FOR APPROVAL, WITH <br />HIS BID QUOTATION, A LIST OF ANY PROPOSED SUBSTITUTIONS OF MATERIALS AND <br />EQUIPMENT FOR THOSE ON WHICH THE ORIGINAL DESIGN WAS BASED. A FULL <br />DESCRIPTION OF ALL PROPOSED SUBSTITUTED ITEMS, THE CHANGE TO THEIR BID <br />PRICE OR OTHER REASONS FOR SUCH SUBSTITUTIONS SHALL ACCOMPANY THE BID. ALL <br />ACCESSORIES, FEATURES, ETC., SUPPLIED WITH THE SUBSTITUTED MANUFACTURER'S <br />PRODUCT SHALL ALSO BE INCLUDED IN THE BID. <br />(3) IF THE GENERAL CONTRACTOR DOES NOT SUBMIT PROPOSED <br />SUBSTITUTIONS WITH THEIR BID THE TENANT SHALL CONSIDER THE BIDDER TO BE <br />PROPOSING THE MANUFACTURERS AND MODEL NUMBERS SPECIFIED HEREIN AND SHOWN <br />ON THE CONTRACT DRAWINGS. <br />(4) SUBSTITUTIONS AFTER CONTRACT AWARD SHALL NOT BE <br />PERMITTED. <br />6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY <br />RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET <br />IN THESE SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. <br />D. COORDINATION <br />1. GENERAL CONTRACTOR SHALL INCLUDE A VISIT TO THE JOB SITE AND TAKE <br />INTO CONSIDERATION MECHANICAL, ELECTRICAL AND GENERAL TRADE WORK <br />CURRENTLY EXISTING AND WORK WHICH MAY BE INSTALLED PRIOR TO <br />CONTRACT AWARD. RELOCATION OF DUCTWORK, PIPING AND EQUIPMENT, AS <br />REQUIRED, TO AVOID THIS WORK SHALL BE PROVIDED AT NO ADDITIONAL <br />COST TO THE TENANT. <br />2. GENERAL CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT THE BUILDING <br />SITE BEFORE STARTING ANY FABRICATION OR DOING ANY WORK IN THE FIELD <br />AND SHALL BE RESPONSIBLE FOR THE CORRECT AND PROPER MEASUREMENTS <br />OF HIS WORK ALONG WITH RESOLUTIONS FOR ANY CONFLICT OF SPACE WITH <br />OTHER TRADES. <br />3. WHERE THE WORK OF TWO OR MORE TRADES INTERFERE WITH EACH OTHER <br />AND A DEVIATION FROM DESIGN IS NECESSARY, NEITHER WORK SHALL <br />PROCEED UNTIL THE TENANT HAS BEEN NOTIFIED OF THE CONFLICT AND THEY <br />HAVE RENDERED A DECISION AS TO WHAT CHANGES SHOULD BE MADE. <br />4. GENERAL CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING <br />SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL <br />EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID <br />DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH <br />SERVICES SHALL BE PAID BY THE GENERAL CONTRACTOR CAUSING THE <br />DAMAGE. <br />5. IT IS ESSENTIAL THAT ALL WORK AT THE PROJECT BE DONE AS SUCH TIME AND <br />IN SUCH MANNER AS NOT TO INTERFERE WITH THE NORMAL OPERATIONS OF <br />THE FACILITY, A WORK SCHEDULE SHALL BE ARRANGED WITH THE TENANT TO <br />FACILITATE WORK WITH A MINIMUM OF INTERFERENCE WITH THE TENANT'S <br />OPERATIONS. <br />6. AREAS TO BE USED FOR STORAGE SHALL BE ONLY AS DIRECTED BY THE <br />TENANT. ALL STORED MATERIAL SHALL BE RELOCATED OR REMOVED FROM THE <br />SITE AS DIRECTED BY THE TENANT. <br />7. DAILY, AND AT THE COMPLETION OF THE WORK, EACH GENERAL CONTRACTOR <br />SHALL REMOVE ALL EXCESS MATERIALS AND DEBRIS CAUSED BY HIS WORK. <br />UPON COMPLETION OF EACH GENERAL CONTRACTOR'S WORK, CONDITIONS <br />OF THE SPACE(S) SHALL BE THE SAME AS FOUND PRIOR TO COMMENCEMENT <br />OF THE WORK. FAILURE TO DO SO MAY RESULT IN THE TENANT'S <br />EMPLOYMENT OF A SEPARATE SERVICE TO OBTAIN THIS CONDITION AND <br />REDUCING THE FACTOR'S CONTRACT AMOUNT BY THE COST OF SUCH A <br />SERVICE. <br />8. EACH GENERAL CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE <br />TO OTHER WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR <br />HIS SUB -TRADE'S PERSONNEL. ALL PATCHING, REPAIRING, REPLACEMENT AND <br />PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE TENANT BY THE <br />CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE <br />PAID BY THE CONTRACTOR CAUSING THE DAMAGE. <br />E. METHODS <br />1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAW <br />CUT. PIPING SHALL BE LAID ON AN APPROPRIATELY GRADED 6" BED OF CLEAN <br />AND DRY SAND. ENGINEERED FILL SHALL BE USED TO BACKFILL TO 6" ABOVE <br />THE PIPING. BACKFILL THE REMAINDER OF THE TRENCH UTILIZING THE <br />EXCAVATED MATERIAL IF APPROVED BY THE ARCHITECT OR THE TENANT. IF THE <br />EXCAVATED MATERIALS ARE NOT ACCEPTABLE, ENGINEERED FILL ACCEPTABLE <br />TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL THE REMAINDER OF THE <br />TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN 9" LIFTS WITH ALL LIFTS <br />COMPACTED TO 95% PROCTOR. PATCH FLOOR TO MATCH EXISTING. <br />2. EQUIPMENT, PIPING, DUCTWORK, ETC. SHALL NOT BE SUPPORTED FROM ANY <br />CEILINGS, OTHER PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST <br />BRIDGING. ITEMS SHALL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL <br />BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL <br />ENGINEER. <br />3. ALL ROOF PENETRATIONS, FLASHING AND COUNTER FLASHING SHALL BE <br />PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE REQUESTING <br />GENERAL CONTRACTORS COST. <br />II. INSULATION <br />A. GENERAL <br />1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S <br />RECOMMENDATIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY <br />PRACTICES. <br />2. CLEAN AND DRY SURFACES PRIOR TO INSULATING. <br />3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, <br />HANGERS AND SIMILAR PENETRATIONS. <br />4. INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED. <br />5. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED. <br />SEAL ALL PENETRATIONS OF THE VAPOR BARRIER BY STAPLES, HANGERS OR <br />WHERE OTHERWISE DAMAGED. <br />6. MAINTAIN ACCESS TO BALANCING DAMPERS AND VALVES. <br />7. INSULATION SHALL BE BY OWENS-CORNING, KNAUF, OR MANVILLE. <br />8. ALL DUCTWORK AND PIPING SHALL BE INSULATED PER REQUIREMENTS OF <br />ASHRAE 90.1, CHICAGO ENERGY CONSERVATION CODE, NFPA, AND LOCAL <br />CODES. THE FIRST 10 FEET OF RETURN DUCTS SHALL BE INTERNALLY LINED FOR <br />ACOUSTICAL ATTENUATION. OUTSIDE AIR DUCTWORK AND DUCTWORK IN <br />UNCONDITIONED SPACES SHALL ALWAYS BE INSULATED WITH EXTERNAL <br />INSULATION. PIPING SYSTEMS ALWAYS REQUIRING INSULATION INCLUDES, BUT <br />IS NOT LIMITED TO, CONDENSATE, REFRIGERANT, CHILLED WATER, HEATING <br />HOT WATER, CONDENSER WATER, AND STEAM. INTERNALLY INSULATED DUCTS <br />SHALL HAVE 1 INCH THICK, 1-1/2 LB DENSITY ACOUSTICAL INSULATION (AIR SIDE <br />BLACK COATED TO MEET NFPA). INSULATION SHALL BE INSTALLED PER THE <br />REQUIREMENTS OF THE SMACNA GUIDE AND THE MANUFACTURER'S <br />RECOMMENDATIONS. DUCT SIZES NOTED ON DRAWING ARE INSIDE CLEAR <br />DIMENSIONS. INSULATION WRAP SHALL BE FIBERGLASS, FOIL BACKED <br />WRAPPING. WHERE DUCTS OR PIPING IS EXPOSED, AND REQUIRES INSULATION, <br />PROVIDE FIBERBOARD RIGID INSULATION AND PAINT. PAINT COLOR SHALL BE <br />COORDINATED WITH THE ARCHITECTURAL DRAWINGS, LANDLORD, AND <br />TENANT. WHERE DUCTS OR PIPES ARE OUTSIDE THE BUILDING, AN ALUMINUM <br />JACKET SHALL BE PROVIDED AND INSTALLED OVER THE INSULATION, AND <br />SEALED WEATHERTIGHT. <br />B. HVAC <br />1. INTERNALLY INSULATE WITH 1 INCH THICK, 1-1/2# DENSITY ACOUSTICAL <br />INSULATION (AIR SIDE BLACK COATED TO MEET NFPA) ALL DUCTWORK NOTED <br />AS REQUIRING SUCH. INTERNAL INSULATION SHALL BE INSTALLED PER THE <br />REQUIREMENTS OF THE SMACNA GUIDE AND THE MANUFACTURER'S <br />RECOMMENDATIONS. DUCT SIZES NOTED ON DRAWING ARE SHEET METAL <br />DIMENSIONS. <br />2. ALL SUPPLY AND OUTSIDE AIR DUCTWORK SHALL BE WRAPPED WITH 2 INCH OF <br />0.75 LB/CU.FT. FIBERGLASS, FOIL BACKED DUCT WRAPPING. <br />C. PIPING <br />1. ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS <br />PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP (ASJ/SSL). <br />2. FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED <br />FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING <br />COVER. <br />IIL SPRINKLER <br />A. GENERAL <br />1. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF NFPA 13, <br />THE BUILDING TENANT'S INSURANCE COMPANY, THE LOCALLY ENFORCED BUILDING <br />CODE, LOCAL BUILDING AND FIRE OFFICIALS AND ALL OTHER LOCAL AUTHORITIES <br />HAVING JURISDICTION. <br />2. ALL WORK SHALL BE PERFORMED BY A LANDLORD APPROVED, STATE LICENSED <br />SPRINKLER CONTRACTOR. <br />3. THIS WORK SHALL INCLUDE ALL PIPING, FITTINGS, HANGERS, EQUIPMENT, ETC., <br />REQUIRED TO COMPLETE THE WORK. <br />4. SPRINKLER HEADS ARE TO BE CENTERED IN LAY -IN CEILING TILES. HEADS ARE TO <br />BE SPACED SYMMETRICALLY WITH LIGHTING AND OTHER CEILING FIXTURES WHEN <br />INSTALLED IN DRYWALL CEILINGS. <br />5. DETERMINE VOLUME AND PRESSURE OF INCOMING WATER SUPPLY FROM WATER <br />FLOW TEST DATA. REVISE DESIGN WHEN TEST DATA BECOMES AVAILABLE PRIOR TO <br />SUBMITTALS. <br />6. SUBMITTALS <br />a. SHOP DRAWINGS: <br />(1) PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH <br />THE MECHANICAL GENERAL PROVISIONS. <br />(2) SHOW PLANS, CROSS SECTION, ELEVATIONS, DETAILS AND JOB <br />CONDITIONS, RELATIONSHIP TO OTHER WORK. PIPE SIZES, ELEVATIONS ABOVE <br />FLOOR, HEAD LOCATIONS, INSPECTORS TEST CONNECTION, SPRINKLER ENTRANCE, <br />VALVES, ALARMS, BACKFLOW PREVENTER, FLOW SWITCH AND SUPERVISORY DEVICES. <br />(3) SUBMIT DATA ON THE FOLLOWING ITEMS: <br />(a) PIPING AND COUPLINGS. <br />(b) WET ALARM VALVE. <br />(c) BACKFLOW PREVENTER. <br />(d) VALVES AND SUPERVISORY DEVICES. <br />(e) SPRINKLER HEADS AND ESCUTCHEON PLATES. <br />(f SUPPORTS, HANGERS AND ACCESSORIES. <br />(q) SEISMIC CALCULATIONS <br />(4) SUBMIT AND RECEIVE APPROVAL FROM THE AUTHORITY HAVING <br />JURISDICTION PRIOR TO SUBMITTAL. <br />(5) ONCE THE AUTHORITY HAVING JURISDICTION HAS APPROVED SHOP <br />DRAWINGS, THE SUBCONTRACTOR SHALL SEND EIGHT SETS OF APPROVED <br />STAMPED PLANS AND EQUIPMENT CUTS TO THE ARCHITECT FOR APPROVAL. <br />(6) PLANS SUBMITTED WITHOUT ALL HYDRAULIC CALCULATIONS WILL <br />BE RETURNED "REJECTED". PROVIDE INDEPENDENT HYDRAULIC <br />CALCULATION SHEETS. <br />(7) ALL SPRINKLER PLANS SHALL BEAR THE STAMP OF A REGISTERED <br />PROFESSIONAL FIRE PROTECTION ENGINEER LICENSED WITH THE <br />STATE WHERE THE STORE IS LOCATED. <br />(8) AT THE COMPLETION OF THE PROJECT, PROVIDE TENANT WITH <br />OPERATION AND MAINTENANCE MANUALS INCLUDING "AS -BUILT" <br />RECORD DRAWINGS, SPECIFICATIONS AND APPROVED PLANS. <br />B. CRITERIA <br />1, GENERAL CONTRACTOR SHALL VERIFY WITH THE LANDLORD'S PROJECT <br />MANAGER FOR ANY ADDITIONAL CRITERIA (PIPE SIZING; PIPE SCHEDULE OR <br />HYDRAULIC). <br />2, DESIGN AND INSTALL THE SPRINKLER SYSTEM AND PIPING TO CONFORM WITH <br />NFPA 13, ORDINARY HAZARD DESIGN WITH A MAXIMUM SPACING OF 130 <br />SQUARE FEET PER SPRINKLER HEAD IN SALES AREAS AND 100 SQUARE FEET PER <br />HEAD IN STOCK AREAS. <br />3. THE PROJECT AREA CURRENTLY HAS AN EXISTING SPRINKLER SYSTEM INSTALLED <br />WITH FLUSH SPRINKLER HEADS INSTALLED ON A STANDARD GRID PATTERN. <br />GENERAL CONTRACTOR SHALL DESIGN AND MODIFY THE EXISTING SPRINKLER <br />SYSTEM PIPING AND HEADS. THIS WORK SHALL INCLUDE THE RAISING OF ANY <br />EXISTING SPRINKLER PIPING WHICH INTERFERES WITH DESIGNED CEILING <br />ELEVATIONS. SEE ARCH. DRAWINGS FOR CEILING ELEVATIONS. PROVIDE ANY <br />AUXILIARY DRAIN PIPING REQUIRED FOR ANY TRAPPED SPRINKLER PIPING. <br />4. SEE ARCH. DRAWINGS FOR CEILING ELEVATIONS. <br />C. COMPONENTS <br />1. PROVIDE A WATTS REGULATOR NO. (007-LF 3/4 TO 2.5" 009 2" TO 10") DOUBLE <br />CHECK VALVE ASSEMBLY BACKFLOW PREVENTER IN THE PIPING TO THE <br />SPRINKLER HEADS IMMEDIATELY FOLLOWING THE CONNECTION TO THE <br />DOMESTIC WATER SYSTEM. <br />2, FIRE DEPARTMENT CONNECTION: POTTER-ROEMER OR EQUAL SERIES 5020, 4 x <br />2112 x 2`/z, WITH ALL STANDARD FEATURES, "AUTO. SPKR." LETTERING, AND <br />THREAD TO MATCH LOCAL FIRE DEPARTMENT REQUIREMENTS. - FLUSH <br />MOUNTED FIRE DEPARTMENT INLET CONNECTION WITH WALL PLATE WITH <br />"AUTOMATIC SPRINKLER" IDENTIFICATION, ALL BRASS CONSTRUCTION AND <br />POLISHED BRASS FINISH. CONTACT THE FIRE DEPARTMENT TO VERIFY FIRE <br />DEPARTMENT CONNECTION TYPE AND TREAD PATTERN TO MATCH THAT OF <br />THE FIRE DEPARTMENT EQUIPMENT, PROVIDE 4" UL LISTED CHECK VALVE WITH <br />BALL DRIP PIPED TO DRAIN. <br />D. SUPERVISION: <br />1. THE RISER CONTROL VALVE AND ALL ZONE VALVES SHALL HAVE ELECTRIC <br />SUPER VISION TO SIGNAL THE BUILDING FIRE ALARM SYSTEM. TAMPER <br />SWITCHES PROVIDED BY SPRINKLER SUBCONTRACTOR AND WIRED BY THE <br />ELECTRICAL SUBCONTRACTOR. <br />2. MECHANICAL: ALL OTHER VALVES SHALL BE PADLOCKED IN STANDARD <br />OPERATING POSITION, WITH 2 KEYS PER PADLOCK AND ALL PADLOCKS SHALL <br />BE KEYED THE SAME, CHAIN AND PADLOCK ALL VALVES OVER 2" SIZE. <br />E. PIPING <br />1. PIPING SHALL BE BLACK STEEL PIPE PER NFPA 13. <br />2. PIPE HANGERS FOR THE SPRINKLER SYSTEM SHALL BE ADJUSTABLE CLEVIS <br />HANGERS WITH APPROPRIATE CLAMP (DEPENDING ON STRUCTURE). ALL PIPING <br />SHALL BE SUPPORTED ON A MAXIMUM OF 10' CENTERS. <br />F. SPRINKLER HEADS <br />1. SPRINKLER HEADS IN AREAS WITH CEILINGS SHALL BE CENTRAL SPRINKLER <br />CORP, DIVISION OF TYCO, SERIES TY-L, 112" ORIFICE, RECESSED, POLISHED <br />CHROME PENDANT AUTOMATIC SPRINKLER HEAD WITH TWO PIECE FACTORY <br />WHITE METAL ESCUTCHEON. <br />2. SPRINKLER HEADS IN AREAS WITH DRYWALL CEILINGS SHALL BE CENTRAL <br />SPRINKLER CORP, DIVISION OF TYCO. ROYAL FLUSH 11 SERIES RFII, 165 F, WITH A <br />WHITE CEILING PLATE. <br />3. SPRINKLER HEADS IN AREAS WITH EXPOSED STRUCTURE SHALL BE BRASS <br />UPRIGHT CENTRAL SPRINKLER CORP. DIVISION OF TYCO SERIES TY-L,'/2' ORIFICE, <br />165 F. <br />4. SPRINKLER SYSTEM TO BE DESIGN BUILD PER BUILDING CRITERIA, LOCAL CODES <br />AND LUXO T TICA STANDARDS. <br />IV. PIPING <br />A. GENERAL <br />1. THE ENTIRE PIPING INSTALLATION, MATERIALS, EQUIPMENT, ETC. SHALL <br />CONFORM TO THE REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING <br />CODE, THE MECHANICAL CODE. <br />2. TEST ALL PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. <br />3. FURNISH ACCESS DOORS FOR VALVES. <br />4, THIS GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SERVICES <br />FOR ALL EQUIPMENT WHETHER PROVIDED BY THIS GENERAL CONTRACTOR <br />OR OTHERS. GENERAL CONTRACTOR SHALL COORDINATE HIS INSTALLATION WITH THE <br />APPROPRIATE EQUIPMENT SUPPLIER AND SHALL REVISE THE DESIGN AS REQUIRED TO <br />MATCH THE EQUIPMENT BEING SUPPLIED. THIS GENERAL CONTRACTOR SHALL PROVIDE <br />ALL LABOR AND MATERIALS REQUIRED TO CONNECT ALL EQUIPMENT TO THE PIPING <br />SYSTEMS INCLUDING BUT NOT LIMITED TO; CONDENSATE, REFRIGERANT, CHILLED WATER, <br />HEATING HOT WATER, CONDENSER WATER, STEAM, ETC. <br />S. FIRE STOPPING - REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL <br />CONSTRUCTION DESIGN NUMBER. FOR RATED MASONRY WALL AND FLOOR <br />ASSEMBLIES, PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP <br />SYSTEM NUMBER C-AJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES, PROVIDE <br />A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER <br />W-L-1003, <br />B. CONDENSATE DRAINS, CONDENSER WATER UP TO 2" ABOVE GRADE AND <br />UNDER 125 PSIG <br />1. ASTM B88, TYPE L, HARD DRAWN COPPER PIPE; AND ASME B16,18, CAST BRASS, <br />OR ASME B16.22, SOLDER WROUGHT COPPER FITTINGS. <br />V. HVAC EQUIPMENT <br />A. INSTALLATION OF ALL EQUIPMENT SHALL COMPLY WITH THE MANUFACTURER'S <br />INSTALLATION INFORMATION AND INSTRUCTIONS, REQUIREMENTS AND ANY ADDITIONAL <br />GUIDELINES. GENERAL CONTRACTOR SHALL PROVIDE ALL ADDITIONAL REQUIRED <br />ACCESSORIES REQUIRED TO COMPLETE THE INSTALLATIONS. <br />B. HVAC EQUIPMENT SHALL BE "STARTED UP" BY A FACTORY TRAINED AND <br />AUTHORIZED SERVICE TECHNICIAN. ALL FACTORY STARTUP FORMS SHALL BE COMPLETED <br />AND TURNED OVER TO THE TENANT WITH ALL COMPLETED WARRANTY CARDS PRIOR TO <br />FINAL APPROVAL. <br />C. ROOFTOP UNITS <br />1. GAS FIRED ROOFTOP UNIT - CONSTANT VOLUME (RTU-1,2) <br />a.WALL MOUNTED SEVEN DAY PROGRAMMABLE THERMOSTAT SHALL <br />SEQUENCE HEATING, COOLING AND DEHUMIDIFICATION. PROVIDE WITH <br />SUB -BASE TO MANUALLY SELECT HEATING, COOLING, FAN ON -OFF, AUTO <br />OPERATION. <br />b. UNIT SHALL OPERATE IN OCCUPIED OR UNOCCUPIED MODES BASED UPON <br />TIME CLOCK SEQUENCE AS DETERMINED BY OWNER. <br />c.UN000UPIED MODE - THE SUPPLY FAN WILL BE OFF, THE OUTDOOR AIR <br />DAMPER WILL GO TO 100% CLOSED POSITION AND UNIT WILL CYCLE ON WITH <br />A CALL FOR HEATING, COOLING OR DEHUMIDIFICATION. DURING THE <br />UNOCCUPIED MODE, RTU SHALL REMAIN OFF DURING THE COOLING SEASON; <br />DURING THE HEATING SEASON, RTU SHALL CYCLE ON WITH OUTSIDE AIR <br />DAMPERS REMAINING CLOSED TO MAINTAIN A SPACE SET -BACK TEMPERATURE <br />OF 60 DEG F (ADJUSTABLE) AS SENSED BY A NIGHT SETBACK SPACE <br />TEMPERATURE SENSOR. <br />d. OCCUPIED MODE- THE SUPPLY FAN SHALL RUN CONTINUOUSLY, THE <br />OUTDOOR AIR DAMPER WILL MODULATE TO THE REQUIRED POSITION BASED <br />ON VENTILATION SEQUENCING AND THE UNIT WILL GO INTO THE HEATING, <br />COOLING OR DEHUMIDIFICATION MODE BASED UPON ROOM THERMOSTAT <br />AND HUMIDISTA T SET POINTS. <br />1) UPON A CALL FOR HEATING, THE GAS BURNER SHALL FIRE. STAGE 1 <br />HEATING SHALL BE ENABLED WHEN THE ZONE TEMPERATURE DROPS <br />1.5 DEGREE (ADJUSTABLE) BELOW SETPOINT. STAGE 2 HEATING SHALL BE <br />ENABLED WHEN THE ZONE TEMPERATURE DROPS 3 DEGREES <br />(ADJUSTABLE) BELOW SETPOINT. <br />2) UPON A CALL FOR COOLING, THE STAGE 1 COMPRESSOR SHALL <br />ENERGIZE. STAGE 1 COOLING SHALL BE ENABLED WHEN THE ZONE <br />TEMPERATURE RISES 1.5 DEGREE (ADJUSTABLE) ABOVE SETPOINT. STAGE <br />2 COOLING SHALL BE ENABLED WHEN THE ZONE TEMPERATURE RISES 3 <br />DEGREES (ADJUSTABLE) ABOVE SETPOINT. <br />3) WHEN THERE IS A CALL FOR DEHUMIDIFICATION WITHOUT A CALL FOR <br />COOLING, HOT GAS REHEAT MODE SHALL BE ENABLED. WHEN THE <br />RELATIVE HUMIDITY IN THE CONTROLLED SPACE (AS MEASURED BY THE <br />SENSOR ASSIGNED TO SPACE HUMIDITY SENSING) RISES ABOVE THE <br />SPACE HUMIDITY SETPOINT (50% RH ADJUSTABLE), COMPRESSORS AND <br />THE SUPPLY FAN WILL ENERGIZE TO REDUCE THE HUMIDITY IN THE <br />SPACE. THE COMPRESSORS AND HOT GAS REHEAT COIL SHALL <br />MODULATE TO PROVIDE NEUTRAL DEHUMIDIFIED AIR INTO THE SPACE. <br />DURING ACTIVE DEHUMIDIFICATION THE UNIT DISCHARGE AIR WILL BE <br />CONTROLLED TO THE SUPPLY AIR REHEAT SETPOINT BY MODULATING <br />THE AMOUNT OF REHEAT PRODUCED BY THE REHEAT COIL. THE SUPPLY <br />AIR REHEAT SETPOINT, OCCUPIED AND UNOCCUPIED <br />DEHUMIDIFICATION SETPOINTS ARE ADJUSTABLE VIA THE HUMAN <br />INTERFACE OR BAS/NETWORK CONTROL. ACTIVE DEHUMIDIFICATION <br />WILL BE TERMINATED WHEN THE HUMIDITY IN THE SPACE IS REDUCED <br />BY 5% LOWER THAN THE SPACE HUMIDITY SETPOINT OR WHEN AN <br />OVERRIDING CONDITION SUCH AS HEATING OR COOLING DEMAND OR <br />A FAILURE OCCURS IN A COMPONENT REQUIRED FOR <br />DEHUMIDIFICATION. <br />e.ENTHALPY ECONOMIZER <br />1) THE ECONOMIZER SHALL BE ENABLED WHENEVER: <br />THE OUTSIDE AIR DRY-BULB TEMPERATURE IS LESS THAN THE RETURN <br />AIR DRY-BULB TEMPERATURE AND THE FAN STATUS IS ON, <br />2) WHEN THE OUTSIDE AIR DEW POINT IS LESS THAN THE RETURN AIR <br />DEW POINT BY AN ADJUSTABLE DEAD BAND (3 DEG F), THE OUTDOOR <br />AIR DAMPER(S) SHALL BE SET FOR 100% OUTDOOR AIR <br />3) WHEN THE OUTDOOR AIR TEMPERATURE IS LESS THAN THE SUPPLY AIR <br />TEMPERATURE SET POINT THE OUTDOOR AIR DAMPER, EXHAUST AIR <br />DAMPER, AND RETURN AIR DAMPER WILL MODULATE, AS APPROPRIATE, <br />BETWEEN THE ADJUSTABLE MINIMUM POSITION AND FULL OPEN <br />POSITION TO MAINTAIN A MIXED AIR TEMPERATURE SETPOINT (55 DEG <br />F ADJUSTABLE) UNTIL ROOM COOLING SETPOINT IS REACHED. <br />4) WHEN THE RETURN AIR DEW POINT IS GREATER THAN THE OUTDOOR <br />AIR DEW POINT OR THE OUTDOOR AIR TEMPERATURE IS GREATER THAN <br />THE RETURN AIR TEMPERATURE THE EXHAUST AIR DAMPER, RETURN AIR <br />DAMPER AND OUTSIDE AIR DAMPER SHALL BE POSITIONED TO THE <br />MINIMUM CONTROL AIR POSITION AND THE UNIT SHALL OPERATE IN <br />MECHANICAL COOLING. <br />5) THE ECONOMIZER SHALL CLOSE TO 0% (OUTSIDE AIR AND EXHAUST <br />DAMPERS SHALL BE CLOSED AND RETURN AIR DAMPER SHALL BE OPEN) <br />WHENEVER: <br />SUPPLY FAN OR RETURN FAN IS OFF <br />OR MIXED AIR TEMPERATURE IS LESS THAN 40°F <br />OR ON LOSS OF FAN STATUS <br />OR THE DISCHARGE AIR TEMPERATURE SENSOR HAS FAILED <br />OR THE RTU IS IN THE MORNING WARM-UP OR COOL -DOWN <br />MODE <br />OR THE UNIT IS IN UNOCCUPIED MODE <br />6) THE OUTDOOR AIR DAMPER SHALL BE SET TO ITS MINIMUM POSITION IF <br />THE ECONOMIZER FUNCTION IS DISABLED. MAINTAIN MINIMUM <br />OUTSIDE AIR BY SETTING THE OUTDOOR AIR DAMPER TO THE MINIMUM <br />POSITION AS ADJUSTED BY THE T&B CONTRACTOR TO MEET THE <br />SCHEDULED MINIMUM OSA QUANTITY. <br />f. A DUCT MOUNTED, PHOTOELECTRIC SMOKE DETECTOR (FURNISHED BY <br />ELECTRICAL CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR) <br />SHALL SHUT DOWN THE UNIT, CLOSE THE OUTSIDE AIR DAMPER AND SEND A <br />SIGNAL TO THE FIRE ALARM PANEL WHEN ACTIVATED. BOTH SAFETIES WILL <br />REQUIRE MANUAL RESET, AND WILL ACTIVATE AN ALARM AT THE LOCAL <br />CONTROL PANEL. <br />a. ALL POINTS AND SETTINGS SHALL BE ADJUSTABLE. <br />AIR DISTRIBUTION <br />A. AIR DISTRIBUTION <br />1. DUCTWORK (ROUND OR RECTANGULAR OR SPIRAL) SHALL BE OF GALVANIZED <br />STEEL CONSTRUCTION AND SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />LATEST EDITION OF THE SMACNA MANUAL AND THE FOLLOWING PRESSURE / <br />SEAL SCHEDULE: <br />a. DUCTWORK BETWEEN AHU (ROOFTOP UNIT) AND VAV BOXES - 3" W.G. <br />POSITIVE PRESSURE, FAIL CLASS A. <br />b. OTHER SUPPLY AIR DUCTWORK- 2" W.G. POSITIVE PRESSURE, SEAL <br />CLASS B. <br />c. RETURN & EXHAUST DUCTWORK - 2" W.G. NEGATIVE PRESSURE, SEAL <br />CLASS B. <br />2. ROUND DUCT ELBOWS SHALL BE I-ONG SWEEP, 1-1/2 TIMES THE CENTERLINE <br />RADIUS UNLESS CLEARANCE IS NOT AVAILABLE AT WHICH TIME MITERED <br />ELBOWS WITH TURNING VANES SHALL BE UTILIZED. <br />3. RECTANGULAR ELBOWS SHALL BE FURNISHED WITH DOUBLE THICKNESS <br />TURNING VANES. TURNING VANES SHALL BE FASTENED WITH A DOUBLE ROW <br />OF SCREWS. <br />4. FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF THE RTU. INSTALL <br />FLEXIBLE CONNECTIONS WITH 3" WIDE DOUBLE NEOPRENE COATED FLAME <br />RETARDANT, NFPA 90A APPROVED, FIBERGLASS FLEXIBLE CONNECTION. <br />FLEXIBLE CONNECTION TO HAVE A MINIMUM OF 24 GAGE, 3" WIDE SHEET <br />METAL COLLARS PERMANENTLY ATTACHED TO EACH SIDE. <br />5. MITERED OFFSETS GREATER THAN 30 DEGREES IN EITHER DIRECTION SHALL <br />NOT BE PERMITTED. <br />6. CHANGES IN DUCT SIZES SHALL BE MADE BY UNIFORM TAPER SECTION WITH A <br />MAXIMUM INCLUDE ANGLE OF DIVERGENCE OF 15DEGREES. <br />7. RECTANGULAR BALANCING DAMPERS - RUSKIN MD25 SHALL BE SINGLE BLADE <br />UP TO 6" IN HEIGHT AND 36" IN WIDTH, AND RUSKIN MD35 MULTI -BLADE FOR <br />LARGER SIZES, ALL ROUND BALANCING DAMPERS SHALL BE COMMERCIAL <br />GRADE SINGLE BLADE UP TO 16" IN DIAMETER SHALL INCORPORATE LOCKING <br />TYPE INDICATING ADJUSTMENT. BALANCING DAMPERS SHALL BE INSTALLED IN <br />ALL BRANCH DUCTS OFF MAIN AND ON ALL TAPS OFF DUCTS TO DIFFUSERS <br />UNLESS OTHERWISE NOTED ON DRAWINGS. <br />8. FINAL CONNECTIONS TO DIFFUSERS MAY BE MADE WITH FLEXIBLE DUCTWORK <br />BUT IT'S USE IS LIMITED TO STRAIGHT HORIZONTAL OR VERTICAL RUNS. ALL <br />CHANGES OF DIRECTION IN AN DUCT SYSTEM (GALVANIZED OR FLEXIBLE) <br />SHALL BE MADE WITH AN APPROPRIATE GALVANIZED ELBOW. MAXIMUM <br />LENGTH OF ANY FLEXIBLE DUCT IS 5'-0". <br />9. FLEXIBLE DUCTS TO DIFFUSERS SHALL BE ATCO RUBBER PRODUCTS, INC. MODEL <br />UPC #070, INSULATED (R=4.2), U.L. 181 RATED AND CLASS 1 AIR CONNECTOR. <br />MAXIMUM LENGTH OF FLEXIBLE DUCT TO DIFFUSER TO BE 5'-0". <br />10. FIRE DAMPERS SHALL BE RUSKIN AND SHALL BE INSTALLED PER <br />MANUFACTURER'S INSTRUCTIONS AND SMACNA REQUIREMENTS FOR A U.L. <br />APPROVED INSTALLATION. FIRE DAMPERS SHALL BE TYPE "B" (BLADES AND <br />FRAME COMPLETELY OUT OF THE AIRSTREAM) FOR ALL WALL ASSEMBLIES AND <br />SHALL BE INSTALLED WITH THE APPROPRIATE WALL SLEEVE AND ANGLES PER <br />UL 555. FIRE DAMPERS SHALL BE INSTALLED IN ALL FIRE RATED WALLS. VERIFY <br />FIRE RATED WALL LOCATIONS AND RATINGS ON THE ARCHITECTURAL <br />DOCUMENTS. FOR ALL FLOOR PENETRATIONS PROVIDE RUSKIN TYPE "LR" FIRE <br />DAMPERS. SEE DETAILS ON DRAWINGS FOR ADDITIONAL INSTALLATION <br />REQUIREMENTS. <br />11. DOUBLE THICKNESS INSULATED ACCESS DOORS SHALL BE PROVIDED AT ALL <br />FIRE DAMPERS FOR ACCESS TO FUSIBLE LINK. DOOR SHALL BE SIZED TO ALLOW <br />FOR EASY SERVICE AND ACCESSIBILITY, ACCESS DOORS SHALL BE A MINIMUM <br />OF 24" IN THE LONGEST DIMENSION. <br />12. PROVIDE 3"x3"x1/4" ANGLE FRAMING AROUND THE ROOF OPENINGS FOR THE <br />SUPPLY AND RETURN AIR DUCTWORK. <br />13. SUPPORT ALL SHEET METAL AND EQUIPMENT FROM ANGLE IRON CONNECTED <br />TO STRUCTURAL STEEL. DO NOT SUSPEND DUCT OR EQUIPMENT FROM METAL <br />DECK OR JOIST BRIDGING. <br />VII. CONTROLS <br />A. CONTROL WIRING SHALL BE PLENUM RATED CABLE WITH COLOR CODED <br />18 AWG WIRES (MINIMUM). <br />B. CONTROLS CONTRACTOR SHALL PROVIDE ALL WIRING BETWEEN THERMOSTAT <br />AND EQUIPMENT (AIR HANDLER, ROOFTOP UNIT, CONDENSING UNIT, ETC.). <br />C. CONTROLS CONTRACTOR SHALL FURNISH AND INSTALL A 120 (24) VOLT SUPPLY <br />AIR DUCT MOUNTED IONIZATION SMOKE DETECTOR. DETECTOR SHALL BE WIRED, BY THE <br />ELECTRICAL (CONTROLS) CONTRACTOR, TO SHUT DOWN UNIT UPON ACTIVATION. <br />D. THERMOSTATS <br />1. FURNISH AND INSTALL A HONEYWELL 7 DAY PROGRAMMABLE <br />HEATING/COOLING THERMOSTAT AND CLEAR LOCKABLE COVER WITH <br />APPROPRIATE CONTROL WIRING BETWEEN THERMOSTAT, (FURNACE AND <br />CONDENSING UNIT) ( ROOFTOP) AS REQUIRED TO PROVIDE A COMPLETE <br />OPERATING SYSTEM. WIRING SHALL BE MINIMUM 18 AWG. <br />2. THERMOSTATS SHALL BE MOUNTED WHERE INDICATED ON THE DOCUMENTS. <br />3. MECHANICAL CONTRACTOR SHALL PROGRAM THERMOSTAT PER THE TENANT'S <br />REQUIREMENTS AND TRAIN TENANT'S PERSONNEL IN THE OPERATION AND <br />PROGRAMMING OF THE _THERMOSTAT AND SYSTEM. <br />VIII. TESTING AND BALANCING <br />A. TESTING AND BALANCING SHALL NOT BEGIN UNTIL THE SYSTEM HAS BEEN <br />COMPLETED, IS IN FULL WORKING ORDER AND ALL EQUIPMENT START-UP HAS BEEN <br />COMPLETED. ALL HVAC SYSTEMS AND EQUIPMENT SHALL BE PUT INTO FULL OPERATION <br />AND THE OPERATION OF SAME CONTINUED DURING EACH WORKING DAY OF THE TESTING <br />AND BALANCING. <br />B. AN INDEPENDENT "AABC" OR "NEBB" CERTIFIED AIR AND WATER BALANCE <br />CONTRACTOR SHALL TEST AND BALANCE THE SYSTEM AND REPORT RESULTS TO THE <br />ENGINEER TENANT AND THE LANDLORD. <br />1. ALL WORK SHALL BE DONE UNDER DIRECT SUPERVISION OF THE CERTIFIED <br />BALANCING ENGINEER AND BY QUALIFIED BALANCING TECHNICIANS. <br />2. METHODS AND FORMS SHALL BE IN ACCORDANCE WITH THE <br />CERTIFICATION AGENCIES RECOMMENDATIONS AND REQUIREMENTS, <br />3. COMPLY WITH ASHRAE RECOMMENDATIONS PERTAINING TO MEASUREMENTS, <br />INSTRUMENTS, TESTING, ADJUSTING AND BALANCING. <br />4. ALL QUANTITIES SHALL BE WITHIN 10% OF THE DESIGN VALUES. <br />5. MECHANICAL CONTRACTOR SHALL PROVIDE ANY SHEAVE CHANGES <br />REQUIRED ON THE HVAC UNIT. <br />C. PERFORMANCE TEST <br />1. AFTER ALL HVAC EQUIPMENT IS INSTALLED, TESTED AND BALANCED AS <br />SPECIFIED HEREIN THEY SHALL BE OPERATED AND PLACED UNDER <br />SURVEILLANCE FOR A PERIOD OF AT LEAST ONE (1) DAY, THIS MAY INCLUDE THE <br />DAY OF STARTUP, TO VERIFY THAT ALL EQUIPMENT IS PRODUCING THE <br />REQUIRED CAPACITY. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR <br />THE OPERATION OF THE EQUIPMENT DURING THE ENTIRE PERIOD. <br />2. TEST SHALL BE PERFORMED <br />WITH ALL CONTROLS IN THE AUTOMATIC POSITION <br />AND BUILDING LIGHTS, DAMPERS, ETC, POSITIONED TO SIMULATE NORMAL <br />OPERATION OF THE HVAC SYSTEM. <br />3. DURING THE TEST, CONTROL SETTINGS MAY REQUIRE ADDITIONAL <br />ADJUSTMENTS TO PRODUCE THE BEST BALANCED SYSTEM OPERATION. THEIR <br />FINAL SETTING OF EACH OPERATING AND SAFETY CONTROL SHALL BE <br />RECORDED, THEY SHALL INCLUDE, BUT NOT LIMITED TO, THERMOSTATS, LIMIT <br />CONTROLS, AND OTHER SIMILAR ITEMS. <br />4. SHOULD COMPLETION OF THE INSTALLATION OCCUR AT SUCH TIME THAT THE <br />REQUIRED PERFORMANCE TEST MUST BE CONDUCTED DURING A SEASON <br />WHEN THE FULL OPERATION OF EITHER THE HEATING OR COOLING SYSTEM <br />CAN NOT BE CHECKED, THE MECHANICAL CONTRACTOR SHALL PERFORM THE <br />TEST AND RECORD ALL SUCH DATA AS IS AVAILABLE WITH SYSTEM OPERATING <br />AUTOMATICALLY UNDER THE PREVAILING WEATHER CONDITIONS. THAT PART <br />OF THE SYSTEM WHICH CAN NOT BE TESTED SHALL BE DELAYED UNTIL THE <br />WEATHER IS APPROPRIATE, AT WHICH TIME THE REMAINING PART OF THE <br />REQUIRED TESTS SHALL BE CONDUCTED AND DATA RECORDED ACCORDINGLY. <br />D. ACCEPTANCE AND CHECK-OUT - GENERAL CONTRACTOR SHALL PROVIDE <br />QUALIFIED PERSONNEL, AT NO ADDITIONAL COST TO THE TENANT, AS MAY BE REQUIRED <br />BY THE ENGINEER FOR THE PURPOSE OF VERIFYING PROPER OPERATION AND <br />INSTALLATION OF THEIR WORK AT THE TIME OF REQUEST FOR ACCEPTANCE. <br />STORE 06261 <br />EVERETT MALL 0 <br />910 CENTER <br />910 SE EVERETT MALL WAY <br />E E ETT, WA 98208 <br />Construction for: <br />DQ <br />Qo <br />Revisions; <br />Mark Date <br />0 <br />Architect Job No.: <br />33N2022 <br />Nextore Store Design Revision No.: <br />Nextore Project <br />Number 86841 <br />Brand Desi n Type: <br />SKI <br />ISSUED FOR: <br />0 CONSTRUCTION <br />Title <br />MECHANICAL <br />SPECIFICATIONS <br />Date Sheet _ <br />04/19/2022 <br />Drawn By <br />TBA ,� <br />Checked By <br />