Laserfiche WebLink
DEMOLITION NOTES, <br />CONTRACTORA. PRIOR <br />BE ! t WITH THE LIMITS OF DEMOLITION ' <br />TRADES.ALL <br />OF •• TO INITIATING WORK. <br />COMPLETEB. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING <br />REMOVAL <br />SCOPEWASTE INCLUDING ANY UNFORESEEN ITEMS WITHIN THE <br />OF THE PROJECT. <br />C. CONTRACTOR SHALL COORDINATE DEMOLITION <br />OCCUPATIONWITH CONTINUING OWNER <br />DEMOLITIONSPACES. ALL ORTO BE R i WITH <br />OWNER i CONDUCTED UNDER CONTROLLED CONDITIONS. <br />i REQUIRED FOR DEMOLITION <br />CONSTRUCTION O` <br />REQUIRED OPENING WITH RESPECTIVEO, ANY WORK <br />THAT ' OUTSIDE OF ! AREA, <br />CONTRACTOR SHALL RETURN SPACE TO ORIGINAL CONDITION. <br />E. PROPERLY CAP, PLUG AND CONCEAL ANY PIPING LEFT IN PLACE. <br />CAP ABANDONED SEWER PIPING A MINIMUM OF 8" BELOW <br />FINISH FLOOR PATCH AND REPAIR SLAB. <br />F. CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE ALL NOT <br />USED WATER PIPING, WASTE AND VENT, DUCTWORK <br />EQUIPMENT IN THE REMODEL AREA. <br />G. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH <br />OWNER REPRESENTATIVE FOR WHETHER TO DISPOSE HVAC <br />OUTLETS REMOVED OR RE -USE. <br />APPLICABLE). ALL SYSTEM SHUT -DOWNS AND DISRUPTION OF <br />SCHEDULED AFTER NORMAL BUILDING HOURS OR AS <br />OTHERWISE APPROVED BY OWNER. <br />PRIOR TO DEMOLITION FIELD VERIFY AND IDENTIFY ANY <br />EXISTING EQUIPMENT TO REMAIN IN SERVICE THAT IS SERVED <br />BY SYSTEMS TO BE DEMOLISHED. NOTIFY ENGINEER OF ANY <br />SUCH CONDITIONS AND REMOVE AND/OR RELOCATE THE <br />SERVICES AS DIRECTED. <br />LANDLORDJ. MEET WITH OWNER REPRESENTATIVE AND PRIOR <br />MATERIALSTO DEMOLITION TO IDENTIFY WHETHER EXISTING <br />CONSIDEREDSYSTEMS, EQUIPMENT, ETC. ARE A <br />DEBRIS. FROMSITE ANDDISPOSE AND <br />APPROVEDAPPROVED MANNER AS DIRECTED BY OWNER. <br />K. <br />TERMINATE DEMOLISHED SYSTEM SERVICES IN A CONCEALED N <br />LOCATION IN AN MANNER. <br />CONSTRUCTION.AND EXISTING <br />L. FIELD VERIFY EXISTING PIPING LOCATIONS PRIOR TO WORK. <br />M. VERIFY EXTENT OF DEMOLITION OF SANITARY SEWER, <br />DOMESTIC WATER PIPING PRIOR TO WORK. ALL DEMOLITION <br />WORK SHALL BE IN COMPLIANCE WITH APPLICABLE CODES, <br />STANDARDS AND THE AUTHORITY HAVING JURISDICTION. <br />NOTES(D KEY LIT <br />1. REMOVE EXISTING AIR DEVICE AND ASSOCIATED RUN OUT DUCTWORK, TYPICAL. <br />2. REMOVE EXISTING DUCTWORK SHOWN DASHED, TYPICAL. <br />3. EXISTING CEILING EXHAUST FAN AND CONTROLS TO BE REMOVED. <br />4. REMOVE EXISTING ROOFTOP UNIT AND ASSOCIATED CONTROLS. <br />5. EXISTING CURB AND ROOF OPENING TO REMAIN FOR NEW RTU CURB ADAPTER. <br />6. CAP AND SEAL EXISTING ROOF OPENING. <br />HVAC - DEMOLITION <br />SCALE: 1/4' = 1'-0" <br />EVERETT MALL <br />010 SE EVERETT MALL WAY <br />EVERETT, WA 98208 <br />Construction for: <br />Revisions: <br />Mark Date <br />A <br />W <br />I` <br />�o <br />Qoo <br />OM M A r <br />Architect Job No.: <br />33N2022 <br />Nextore Store Design Revision No.: <br />11,11 <br />Nextore Project <br />Number 86841 <br />Brand Design Type: <br />SKI <br />ISSUED FOR: <br />® CONSTRUCTION <br />Title <br />HVAC DEMOLITION <br />04/19/2022 <br />Drawn By <br />TBA� <br />Checked By <br />TPA <br />