Laserfiche WebLink
CONDUIT FOR FUTURE COMMUNICATIONS. SEAL AND <br />CAP, LABEL CONDUIT "VOLTA COMMUNICATION CONDUIT" <br />inn TlI t-)F-F)NA AN C\iT I ADCI IN(` AA AT�r?I AI /TVD <br />EXISTING <br />50 <br />INSTALL 125A, 3 POLE <br />CIRCUIT BREAKER. MAT, <br />EXISTING KAIG RATING <br />2. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE -CONSTRUCTION <br />MEETING TO ENSURE ACCURACY OF INSTALLATIONS. <br />3. ANY PAVEMENT DAMAGED DURING CONSTRUCTION SHALL DE REPAIRED OR REPLACED BY THE CONTRACTOR TO PRE -CONSTRUCTION CONDITIONS OR BETTER. <br />CONTRACTORi. CONTRACTOR SHALL USE EMT INSIDE AND ABOVE GRADE, NOT SUBJECT TO DAMAGE INSIDE. CONTRACTOR SHALL USE RGS OUTSIDE AND ABOVE GRADE. <br />SHALLD <br />6. SEE SHEETS C1-00 & C2-00 FOR EXISTING CONDUIT STUB UP LOCATIONS. <br />NATURE7. ALL CONNECTED LOAD INFORMATION IS UNKNOWN. CONTRACTOR SHALL CALCULATE THE UNKNOWN LOAD VALUES BASED ON THE MAXIMUM DEMAND <br />CONTINUOUSLY RECORDED OVER A MINIMUM 30 DAY PERIOD. MAXIMUM DEMAND SHALL BE RECORDED USING AN AMMETER OR POWER METER CONNECTED T <br />EACH PHASE OF THE FEEDER OR SERVICE. THE RECORDING SHALL REFLECT THE MAXIMUM DEMAND OF THE FEEDER OR SERVICE BEING TAKEN WHEN BUILDIN <br />OR SPACE IS OCCUPIED. RECORDING SHALL INCLUDE MEASUREMENT OR CALCULATION OF THE LARGEST EQUIPMENT LOAD(S) THAT MAY BE PERIODIC IN <br />SIMILAR <br />Panel Schedule <br />Switchboard SOP-1 Location: Electrical Room Volts: 208Y1120 Phase 3 Vlore: 4 Heitz: 60 <br />MLO Main AIC: EXIST Branch AIC: (SEE NOTE 3) ENCL. (NEMA): 1 MTG: Surface <br />800 Amp, Ground Bar, Locking Cover, Panel Card. <br />Description of Load Seared <br />Breaker <br />Wire <br />A/Phase <br />CKT No. <br />CKT No. <br />A/Phase <br />WireAmp <br />Breaker <br />Description of Load Served <br />Amp <br />Pole <br />A <br />B <br />C <br />A <br />B <br />C <br />Pole <br />RDP <br />100 <br />3 <br />EXIST <br />EXIST <br />1 <br />2 <br />EXIST <br />EXIST <br />200 <br />3 <br />PROTOCOL A <br />EXIST <br />3 <br />4 <br />EXIST <br />EXIST <br />5 <br />6 <br />EXIST <br />RDP <br />100 <br />3 <br />EXIST <br />EXIST <br />71 <br />8 <br />EXIST <br />EXIST <br />200 <br />3 <br />PROTOCOLA <br />EXIST <br />91 <br />10 <br />EXIST <br />EXIST <br />11 <br />12 <br />EXIST <br />RDP <br />100 <br />3 <br />EXIST <br />EXIST <br />13 <br />14 <br />EXIST <br />EXIST <br />200 <br />3 <br />PROTOCOL A <br />EXIST <br />15 <br />16 <br />EXIST <br />EXIST <br />'17 <br />18 <br />EXIST <br />PANEL P7 <br />225 <br />3 <br />EXIST <br />EXIST <br />19 <br />20 <br />EXIST <br />EXIST <br />200 <br />3 <br />PANEL A <br />EXIST <br />21 <br />22 <br />EXIST <br />EXIST <br />23 <br />24 <br />EXIST <br />PANEL P8 <br />225 <br />3 <br />EXIST <br />EXIST <br />25 <br />26 <br />EXIST <br />EXIST <br />200 <br />3 <br />PANEL A <br />EXIST <br />27 <br />28 <br />EXIST <br />EXIST <br />29 <br />30 <br />EXIST <br />PANES_ P9 <br />225 <br />3 <br />EXIST <br />EXIST <br />31 <br />32 <br />EXIST <br />EXIST <br />200 <br />3 <br />PANEL A <br />EXIST <br />33 <br />34 <br />EXIST <br />EXIST <br />35 <br />36 <br />EXIST <br />PROTOCOL B <br />200 <br />3 <br />EXIST <br />EXIST <br />37 <br />38 <br />45.0 <br />1/0 <br />125 <br />3 <br />PANEL V1 <br />EXIST <br />39 <br />40 <br />80.0 <br />EXIST <br />41 <br />42 <br />45.0 <br />PROTOCOL B <br />200 <br />3 <br />EXIST <br />EXIST <br />43 <br />44 <br />EXIST <br />EXIST <br />1 <br />SPARE <br />EXIST <br />45 <br />46 <br />EXIST <br />EAST <br />1 <br />SPARE <br />EXIST <br />47 <br />48 <br />EXIST <br />EXIST <br />1 <br />SPARE <br />EXIST 49 50 SPARE <br />PROTOCOL B 200 3 EXIST EXIST 5'152 EXIST EXIST 3 SPARE <br />EXIST 53 54 SPARE <br />Total 1 0.0 0.0 0.0 45.0 80.0 45.0 1 Total AlPhase <br />Notes: 1. Proposed Connected KVA_ 20.4 <br />2. Proposed Demand KVA 25.5 <br />1. Where Load Is Labeled "EXIST', The Load Is Unknown <br />2. Contractor Shall Match Existing AIC Rating <br />Z ELECTRICAL ONE LINE DIAGRAM <br />1 N /A GY i -- i IY _ ♦ h/eJ1 v eee , e <br />JUNCTION BOX TRAFFIC RATED <br />Panel Schedule <br />P nelbo rd: V1 Location: Electrical Room Volts: 208YI120V Phase 3 Wire: 4 HerL7: 00 <br />- <br />MLO. 125A Main AIC. 35K Branch AIC. 35K ENCL. (NE ). 1 NITG.- Surface <br />125 Amp, Ground Bar, Locking Cover, Panel Card. <br />Description of Load Served Breaker Wiry A/Phase CKT No. CKT No. A/Phase Wire Breaker Description of Load Served <br />p Pole A B C A B C ,p Pole <br />CHARGING STATION! EV01 <br />CHARGING STATION EV01 <br />20 <br />50 <br />2 <br />2 <br />3 <br />1 <br />�,0 <br />40.0 <br />1 <br />3 <br />2 <br />4 <br />40.0 <br />40.0 <br />1/0 <br />50 <br />2 <br />CHARGING STATION EV02 <br />40.0 <br />5 <br />6 <br />5.O <br />6 <br />20 <br />1 <br />CHARGING STATIONS EV02 <br />SPACE <br />7 <br />3 <br />-- <br />SPACE <br />SPACE <br />9 <br />10 <br />- <br />- <br />SPACE <br />SPACE <br />SPACE <br />- <br />- <br />- <br />- <br />11 <br />13 <br />12 <br />14 <br />- - <br />- <br />SPACE <br />SPACE <br />SPACE <br />15 <br />16 <br />SPACE <br />SPACE <br />17 <br />10 <br />SPACE <br />SPACE <br />19 <br />20 <br />SPACE <br />SPACE <br />21 <br />22 <br />SPACE <br />SPACE <br />23 <br />24 <br />SPACE <br />SPACE <br />25 <br />26 <br />SPACE <br />SPACE <br />SPACE <br />27 <br />29 <br />23 <br />30 <br />SPACE <br />SPACE <br />Total A/Phase - 6,0 40.0 ( 40.0 40.0 1 40.0 .0 } Taal A/Phase <br />Motes: 1. Connected KVA: 20.4 <br />2. Demand A: 26.5 <br />Voltage Drop Calculations <br />Start Paint <br />End Point <br />Arrlpera e (A) <br />Voltage <br />Distance <br />Conductor (AWG) <br />Conductor Resistance (ohm/kft) <br />V.D. <br />V.D. <br />PANELVI <br />PANELVI <br />EV01 <br />EV01 <br />40 <br />5 <br />208 <br />120 <br />405 <br />405 <br />1 <br />8 <br />0.16 <br />0.809 <br />5.18 <br />3.28 <br />2,49 <br />2.73 <br />PANELVI <br />EV02 <br />40 <br />20 <br />510 <br />1/0 <br />0.127 <br />5.15 <br />2.49 <br />PANEL V1 <br />EV02 <br />5 <br />120 <br />510 <br />6 <br />0.51 <br />2.60 <br />2.17 <br />Conduit Schedule _ <br />Conduit Section <br />Conduit # <br />Conduit Size <br />Conductors <br />Installation Method <br />1 <br />219 <br />(2) #1/0 AWG + (2) #1 AWG + (2) #6 AWG + (2) #8 AWG + (1) #2AWGGND <br />Ceiling/ <br />A <br />2 <br />1 <br />1/2 MIN. <br />211 <br />Future Communications <br />(2) #1/0 AWG + (2) #6AWG+(1)#2AWGGND <br />Directional Bore <br />Directional fore <br />l3 <br />2 <br />1/2 MIN. <br />Future Communications <br />!rt <br />4637 CHABOT DRIVESUITE 300 <br />PLEASANTON, CA 94588 <br />R <br />2019 Kimley-Horn and Associates, Inc. <br />4 <br />05/20/2020 <br />CD100s-CITY COMMENTS <br />SAL <br />3 <br />02/06/2020 <br />CD100s <br />GCC <br />2 <br />10/10/2019 <br />CD100s <br />GCC <br />1 <br />08/19/2019 <br />CD90s <br />SDD <br />REV <br />DATE <br />DESCRIPTION <br />BY <br />IT IS A VIOLATION OF LAW FOR ANY PERSON, <br />UNLESS THEY ARE ACTING UNDER THE DIRECTION <br />OF A LICENSED PROFESSIONAL <br />ENGINEER, TO ALTER THIS DOCUMENT. <br />SHEET NUMBER <br />�r . gyp• x�- <br />4 <br />