My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11031 19TH AVE SE 2020 Plans 2023-01-05
>
Address Records
>
19TH AVE SE
>
11031
>
Plans
>
11031 19TH AVE SE 2020 Plans 2023-01-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 7:51:54 AM
Creation date
12/15/2022 4:32:46 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11031
Permit
B2004-031
Year
2020
Notes
INSTALL (2) ELECTRICAL VEHICLE CHARGING STATIONS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDUIT FOR FUTURE COMMUNICATIONS. SEAL AND <br />CAP, LABEL CONDUIT "VOLTA COMMUNICATION CONDUIT" <br />inn TlI t-)F-F)NA AN C\iT I ADCI IN(` AA AT�r?I AI /TVD <br />EXISTING <br />50 <br />INSTALL 125A, 3 POLE <br />CIRCUIT BREAKER. MAT, <br />EXISTING KAIG RATING <br />2. UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY ENGINEER AT TIME OF PRE -CONSTRUCTION <br />MEETING TO ENSURE ACCURACY OF INSTALLATIONS. <br />3. ANY PAVEMENT DAMAGED DURING CONSTRUCTION SHALL DE REPAIRED OR REPLACED BY THE CONTRACTOR TO PRE -CONSTRUCTION CONDITIONS OR BETTER. <br />CONTRACTORi. CONTRACTOR SHALL USE EMT INSIDE AND ABOVE GRADE, NOT SUBJECT TO DAMAGE INSIDE. CONTRACTOR SHALL USE RGS OUTSIDE AND ABOVE GRADE. <br />SHALLD <br />6. SEE SHEETS C1-00 & C2-00 FOR EXISTING CONDUIT STUB UP LOCATIONS. <br />NATURE7. ALL CONNECTED LOAD INFORMATION IS UNKNOWN. CONTRACTOR SHALL CALCULATE THE UNKNOWN LOAD VALUES BASED ON THE MAXIMUM DEMAND <br />CONTINUOUSLY RECORDED OVER A MINIMUM 30 DAY PERIOD. MAXIMUM DEMAND SHALL BE RECORDED USING AN AMMETER OR POWER METER CONNECTED T <br />EACH PHASE OF THE FEEDER OR SERVICE. THE RECORDING SHALL REFLECT THE MAXIMUM DEMAND OF THE FEEDER OR SERVICE BEING TAKEN WHEN BUILDIN <br />OR SPACE IS OCCUPIED. RECORDING SHALL INCLUDE MEASUREMENT OR CALCULATION OF THE LARGEST EQUIPMENT LOAD(S) THAT MAY BE PERIODIC IN <br />SIMILAR <br />Panel Schedule <br />Switchboard SOP-1 Location: Electrical Room Volts: 208Y1120 Phase 3 Vlore: 4 Heitz: 60 <br />MLO Main AIC: EXIST Branch AIC: (SEE NOTE 3) ENCL. (NEMA): 1 MTG: Surface <br />800 Amp, Ground Bar, Locking Cover, Panel Card. <br />Description of Load Seared <br />Breaker <br />Wire <br />A/Phase <br />CKT No. <br />CKT No. <br />A/Phase <br />WireAmp <br />Breaker <br />Description of Load Served <br />Amp <br />Pole <br />A <br />B <br />C <br />A <br />B <br />C <br />Pole <br />RDP <br />100 <br />3 <br />EXIST <br />EXIST <br />1 <br />2 <br />EXIST <br />EXIST <br />200 <br />3 <br />PROTOCOL A <br />EXIST <br />3 <br />4 <br />EXIST <br />EXIST <br />5 <br />6 <br />EXIST <br />RDP <br />100 <br />3 <br />EXIST <br />EXIST <br />71 <br />8 <br />EXIST <br />EXIST <br />200 <br />3 <br />PROTOCOLA <br />EXIST <br />91 <br />10 <br />EXIST <br />EXIST <br />11 <br />12 <br />EXIST <br />RDP <br />100 <br />3 <br />EXIST <br />EXIST <br />13 <br />14 <br />EXIST <br />EXIST <br />200 <br />3 <br />PROTOCOL A <br />EXIST <br />15 <br />16 <br />EXIST <br />EXIST <br />'17 <br />18 <br />EXIST <br />PANEL P7 <br />225 <br />3 <br />EXIST <br />EXIST <br />19 <br />20 <br />EXIST <br />EXIST <br />200 <br />3 <br />PANEL A <br />EXIST <br />21 <br />22 <br />EXIST <br />EXIST <br />23 <br />24 <br />EXIST <br />PANEL P8 <br />225 <br />3 <br />EXIST <br />EXIST <br />25 <br />26 <br />EXIST <br />EXIST <br />200 <br />3 <br />PANEL A <br />EXIST <br />27 <br />28 <br />EXIST <br />EXIST <br />29 <br />30 <br />EXIST <br />PANES_ P9 <br />225 <br />3 <br />EXIST <br />EXIST <br />31 <br />32 <br />EXIST <br />EXIST <br />200 <br />3 <br />PANEL A <br />EXIST <br />33 <br />34 <br />EXIST <br />EXIST <br />35 <br />36 <br />EXIST <br />PROTOCOL B <br />200 <br />3 <br />EXIST <br />EXIST <br />37 <br />38 <br />45.0 <br />1/0 <br />125 <br />3 <br />PANEL V1 <br />EXIST <br />39 <br />40 <br />80.0 <br />EXIST <br />41 <br />42 <br />45.0 <br />PROTOCOL B <br />200 <br />3 <br />EXIST <br />EXIST <br />43 <br />44 <br />EXIST <br />EXIST <br />1 <br />SPARE <br />EXIST <br />45 <br />46 <br />EXIST <br />EAST <br />1 <br />SPARE <br />EXIST <br />47 <br />48 <br />EXIST <br />EXIST <br />1 <br />SPARE <br />EXIST 49 50 SPARE <br />PROTOCOL B 200 3 EXIST EXIST 5'152 EXIST EXIST 3 SPARE <br />EXIST 53 54 SPARE <br />Total 1 0.0 0.0 0.0 45.0 80.0 45.0 1 Total AlPhase <br />Notes: 1. Proposed Connected KVA_ 20.4 <br />2. Proposed Demand KVA 25.5 <br />1. Where Load Is Labeled "EXIST', The Load Is Unknown <br />2. Contractor Shall Match Existing AIC Rating <br />Z ELECTRICAL ONE LINE DIAGRAM <br />1 N /A GY i -- i IY _ ♦ h/eJ1 v eee , e <br />JUNCTION BOX TRAFFIC RATED <br />Panel Schedule <br />P nelbo rd: V1 Location: Electrical Room Volts: 208YI120V Phase 3 Wire: 4 HerL7: 00 <br />- <br />MLO. 125A Main AIC. 35K Branch AIC. 35K ENCL. (NE ). 1 NITG.- Surface <br />125 Amp, Ground Bar, Locking Cover, Panel Card. <br />Description of Load Served Breaker Wiry A/Phase CKT No. CKT No. A/Phase Wire Breaker Description of Load Served <br />p Pole A B C A B C ,p Pole <br />CHARGING STATION! EV01 <br />CHARGING STATION EV01 <br />20 <br />50 <br />2 <br />2 <br />3 <br />1 <br />�,0 <br />40.0 <br />1 <br />3 <br />2 <br />4 <br />40.0 <br />40.0 <br />1/0 <br />50 <br />2 <br />CHARGING STATION EV02 <br />40.0 <br />5 <br />6 <br />5.O <br />6 <br />20 <br />1 <br />CHARGING STATIONS EV02 <br />SPACE <br />7 <br />3 <br />-- <br />SPACE <br />SPACE <br />9 <br />10 <br />- <br />- <br />SPACE <br />SPACE <br />SPACE <br />- <br />- <br />- <br />- <br />11 <br />13 <br />12 <br />14 <br />- - <br />- <br />SPACE <br />SPACE <br />SPACE <br />15 <br />16 <br />SPACE <br />SPACE <br />17 <br />10 <br />SPACE <br />SPACE <br />19 <br />20 <br />SPACE <br />SPACE <br />21 <br />22 <br />SPACE <br />SPACE <br />23 <br />24 <br />SPACE <br />SPACE <br />25 <br />26 <br />SPACE <br />SPACE <br />SPACE <br />27 <br />29 <br />23 <br />30 <br />SPACE <br />SPACE <br />Total A/Phase - 6,0 40.0 ( 40.0 40.0 1 40.0 .0 } Taal A/Phase <br />Motes: 1. Connected KVA: 20.4 <br />2. Demand A: 26.5 <br />Voltage Drop Calculations <br />Start Paint <br />End Point <br />Arrlpera e (A) <br />Voltage <br />Distance <br />Conductor (AWG) <br />Conductor Resistance (ohm/kft) <br />V.D. <br />V.D. <br />PANELVI <br />PANELVI <br />EV01 <br />EV01 <br />40 <br />5 <br />208 <br />120 <br />405 <br />405 <br />1 <br />8 <br />0.16 <br />0.809 <br />5.18 <br />3.28 <br />2,49 <br />2.73 <br />PANELVI <br />EV02 <br />40 <br />20 <br />510 <br />1/0 <br />0.127 <br />5.15 <br />2.49 <br />PANEL V1 <br />EV02 <br />5 <br />120 <br />510 <br />6 <br />0.51 <br />2.60 <br />2.17 <br />Conduit Schedule _ <br />Conduit Section <br />Conduit # <br />Conduit Size <br />Conductors <br />Installation Method <br />1 <br />219 <br />(2) #1/0 AWG + (2) #1 AWG + (2) #6 AWG + (2) #8 AWG + (1) #2AWGGND <br />Ceiling/ <br />A <br />2 <br />1 <br />1/2 MIN. <br />211 <br />Future Communications <br />(2) #1/0 AWG + (2) #6AWG+(1)#2AWGGND <br />Directional Bore <br />Directional fore <br />l3 <br />2 <br />1/2 MIN. <br />Future Communications <br />!rt <br />4637 CHABOT DRIVESUITE 300 <br />PLEASANTON, CA 94588 <br />R <br />2019 Kimley-Horn and Associates, Inc. <br />4 <br />05/20/2020 <br />CD100s-CITY COMMENTS <br />SAL <br />3 <br />02/06/2020 <br />CD100s <br />GCC <br />2 <br />10/10/2019 <br />CD100s <br />GCC <br />1 <br />08/19/2019 <br />CD90s <br />SDD <br />REV <br />DATE <br />DESCRIPTION <br />BY <br />IT IS A VIOLATION OF LAW FOR ANY PERSON, <br />UNLESS THEY ARE ACTING UNDER THE DIRECTION <br />OF A LICENSED PROFESSIONAL <br />ENGINEER, TO ALTER THIS DOCUMENT. <br />SHEET NUMBER <br />�r . gyp• x�- <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.