My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 24 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project,including,but not limited to,record drawings,as-builts,required reports 1 <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection,determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> Owner's Representative finds materials,Equipment,or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety,and the Contractor agrees to perform the Work as changed.Among <br /> others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work,Equipment or material to be provided under this Contract, <br /> and I <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications,designs,or both, <br /> 111 <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities,Equipment,materials, services, or sites,provided by the Owner,and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time,the Owner may,at its sole option,unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> Contractor without explicit notice from the Owner to proceed. <br /> 6.2 EXTRA WORK <br /> At its sole option,the Owner may(1)perform Extra Work itself,(2)employ others to do it,(3)direct the <br /> Contractor to perform the Extra Work at existing unit bid price,(4)direct the Contractor to perform the <br /> Extra Work at a mutually agreed upon price,or(5)direct the Contractor to perform the Extra Work on a <br /> Force Account basis. <br /> 6.3 CHANGE ORDERS <br /> Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. <br /> PAYMENT FOR CHANGES.Requests for an increase in Contract Time must be made as provided in <br /> 5.2.2.2 Extensions of Contract Time,as applicable. Substantial changes in Contract Time,Contract <br /> Sum or Work will often be negotiated and agreed between the Contractor and Owner before the Owner <br /> directs the Contractor to proceed with the change. <br /> I <br /> 00 72 00 - 24 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.