IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 25 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> If the Contractor and Owner agree on the scope of Work and any changes to Contract Sum and Contract <br /> Time,the Contractor and Owner shall execute an agreed Change Order. However,if the Contractor and <br /> Owner do not agree,the Owner may,in its sole discretion,issue a unilateral Change Order changing the <br /> scope of Work and making any adjustments to the Contract Sum pursuant to 9.2.PAYMENT FOR <br /> CHANGES and Contract Time in such amount and for such time as the Owner thinks appropriate. <br /> Contractor agrees to use the agreed and unilateral Change Order forms included in the Contract <br /> Documents or otherwise provided by Owner. The Contractor accepts all requirements,terms and <br /> conditions of a Change Order by: signing it;writing a separate acceptance;or by failing to notify the <br /> Owner immediately in writing that Contractor disagrees with the Change Order and does not intend to be <br /> bound by its terms. <br /> The Contractor waives all Contract Claims with respect to(and is estopped from denying its agreement <br /> L with)any unilateral Change Order for which the Contractor does not immediately give Notice to the <br /> Owner as provided in ARTICLE 10.NOTICE TO OWNER and submit a Contract Claim as provided <br /> in ARTICLE 12. CONTRACT CLAIMS. A unilateral Change Order that is not timely protested as <br /> provided in this section shall be full payment and final settlement of all asserted and unasserted Contract <br /> Claims for Contract Time and all costs of any kind, including costs of Delays,inefficiencies and impacts, <br /> related to,arising out of,or resulting from,any Work described in the Change Order. <br /> The Contractor shall obtain written consent of the surety or sureties if the Owner's Representative <br /> requests such consent. <br /> 6.4 VALUE ENGINEERING AND COST SHARING <br /> The Contractor may submit proposals for changing the Drawings, Specifications,or other requirements of <br /> the Contract Documents and the Owner,in its sole discretion,may accept or reject such proposals. If <br /> accepted by the Owner and if the proposal decreases the direct,actual costs of constructing the Work,the <br /> Contract Sum shall be reduced by fifty percent(50%)of the direct,actual construction cost saved. <br /> Because the Owner has the sole discretion whether to consider,accept or reject the Contractor's proposal <br /> and the Contractor has no right to require the Owner to consider or accept such proposals,the Owner's <br /> decision is not reviewable by any court. This subsection applies only to change proposals initiated solely <br /> by the Contractor(or its Subcontractors and Suppliers)and does not apply to change proposals requested <br /> or initiated by the Owner or the Owner's Representative. The Owner is not obligated or required to <br /> consider any Contractor initiated change proposals and may,in its sole discretion,refuse to do so. Under <br /> no circumstances shall the Contractor be entitled to additional compensation arising out of,or related to, <br /> the Owner's refusal to consider or approve a Contractor initiated change proposal.The Contractor shall <br /> not do any of the following without the express written agreement of the Owner: fail to perform any <br /> Work;commence performance of any proposed change;reduce its resources assigned to performance of <br /> the Work in order to prepare a change proposal or in anticipation of approval of a change proposal;adjust <br /> or change the project schedule or take any action or fail to do any action that would affect the Completion <br /> Date of the Work;take any action or fail to take any action arising out of the Contractor's change <br /> proposal that would result in the Contractor seeking an adjustment upward of the Contract Sum. <br /> 7. LABOR STANDARDS <br /> 7.1. WAGES OF EMPLOYEES <br /> 7.1.1. General <br /> Pursuant to the requirements of Chapter 39.12 RCW,the Contractor and each Subcontractor or other <br /> person doing the whole or any part of Work to be performed under this Contract in the State of <br /> Washington shall pay each employee working in the State of Washington an amount not less than the <br /> general prevailing rate of wage,as specified by the Industrial Statistician of the Department of Labor and <br /> Industries of Washington State,paid in the vicinity of the Work to be performed under this Contract for <br /> the particular grade or occupation of each employee <br /> 00 72 00 - 25 GENERAL CONDITIONS <br />