My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 28 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 7.6 LABOR RELATIONS <br /> The Contractor shall take all reasonable steps to prevent any labor Disputes involving the Contractor and I <br /> any of its Subcontractors or Suppliers of any products or services from disrupting the Work under this <br /> Contract or interfering with access to the Owner's property by the Owner, including its agents, <br /> representatives,employees and officials,any other contractors engaged in construction activities,or 111 <br /> members of the public. In the event any picketing or other concerted activity by employees involved in a <br /> labor Dispute with the Contractor or its Subcontractors or Suppliers interferes in any way with access to <br /> the Owner's property by any persons,the Contractor shall promptly and expeditiously take all reasonable <br /> actions to eliminate or minimize such interference, including but not limited to: (1)utilizing all <br /> reasonable means of restricting any picketing to a single entrance to the Owner's property;(2)posting <br /> notices or signs which advise interested persons and labor organizations that a particular entrance to the <br /> Owner's property is for the employees of"primary"or,as the case may be, "neutral"employers;(3) <br /> policing entrances to ensure that only authorized personnel may use those entrances;(4)notifying all <br /> interested labor organizations of the "primary" or"neutral" status of particular entrances;and(5)in the <br /> event any such picketing or concerted activity is unlawful or has a secondary impact upon the employees <br /> of neutral employers,promptly and expeditiously taking appropriate action to seek recourse through the <br /> appropriate governmental agency or state or federal courts to limit the location of such picketing so as to <br /> reduce the impact thereof upon neutral employers. <br /> The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render <br /> assistance as may be in the best interests of the Owner. However,the Owner shall have the right to direct <br /> the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to <br /> overrule such actions,to designate the entrances to be used as "primary" or"neutral" entrances,and to <br /> take appropriate legal action in order to protect the Owner's property and interests. In any event,the <br /> Contractor shall be liable for all Delays and costs,including costs to the Owner,and actual damages <br /> resulting from the relocation,rerouting,Delays or actions required to maintain the uninterrupted progress <br /> of the Work. Failure by the Contractor to take the actions described above or to comply with the <br /> directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the <br /> Contract or suspend the Contractor as provided in this Contract. I <br /> 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> 8.1. GENERAL I <br /> Unless otherwise specifically stated in the Contract Documents,the Contractor shall provide and pay for <br /> materials,labor,tools,Equipment,water,light,power,transportation,supervision,and temporary <br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary,to <br /> execute,complete and deliver the Work within the specified time. Contractor shall be liable for all power <br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or <br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the <br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new <br /> and of the specified quality. Equipment offered shall be new or current specified models. This <br /> requirement does not apply to minor details,or to thoroughly demonstrated improvements in design or in <br /> materials of construction. Construction Work shall be executed in conformity with the standard practice <br /> of the trade. <br /> I <br /> I <br /> 00 72 00 - 28 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.