IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 72 00 - 44 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 <br /> 10. NOTICE TO OWNER <br /> 10.1 WHEN NOTICE MUST BE GIVEN I <br /> Whenever <br /> 1. The Contractor disagrees with any requirement,direction,interpretation or determination by the I <br /> Owner or Owner's Representative; <br /> 2. The Contractor knows,or should with the reasonable exercise of ordinary care know,of a <br /> differing site condition as provided in 11.DIFFERING SITE CONDITIONS; <br /> 3. The Contractor knows,or should with the reasonable exercise of ordinary care know,of any <br /> Delay or an event that may cause a Delay; <br /> 4. The Contractor believes,or with the reasonable exercise of ordinary care should believe,it is <br /> entitled to an adjustment of Contract Sum or Time,even if the total or exact amount or impact <br /> cannot yet be determined; <br /> 5. The Contractor believes it is required or directed to perform work that is outside the scope of the <br /> Contract Documents;or <br /> 6. An event occurs,or fails to occur,that the Contractor believes,or should reasonably foresee,may <br /> result in a Contract Claim; <br /> the Contractor shall immediately give Notice to the Owner or Owner's Representative as provided in this <br /> section and elsewhere in the General Conditions and Specifications. <br /> Timely and adequate Notice is a condition precedent to a Contract Claim. <br /> Requests for extensions of Contract Time must be made and will be evaluated in accordance with 5.2.2.2 <br /> Extensions of Contract Time. <br /> Irrespective of any request for additional compensation or Contract Time or any Contract Claim that work <br /> is extra and not part of the original scope of Work,the Contractor shall proceed expeditiously and <br /> promptly with the work as the Owner orders. <br /> If the Contractor fails to follow the procedures of this Contract,including failing to give Notice,the <br /> Contractor completely waives such Contract Claim. In its sole discretion,the Owner may waive strict <br /> compliance with procedures,but any such waiver of one or more items or elements does not waive the <br /> necessity for Contractor's strict compliance with any other item or element,nor shall such waiver be <br /> admissible in any legal proceeding for any reason. <br /> 10.2 FORM OF NOTICE <br /> The Notice must include the following minimum information: <br /> 1. A complete and accurate description of the event or events giving rise to the Notice,including <br /> dates,times,and locations; <br /> 2. A preliminary list of persons of involved in such event; <br /> 3. A statement whether the Contractor believes the event may result in a Contract Claim for <br /> additional Contract Time or adjustment of the Contract Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as provided in this <br /> section. <br /> 10.3 SUPPLEMENTAL INFORMATION <br /> Contractor shall supplement the written Notice as soon as possible with a written statement providing the <br /> following: <br /> 1. The date of the event,incident,direction,and other pertinent information; I <br /> 00 72 00 - 44 GENERAL CONDITIONS <br />