My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 12/13/2022
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 12:23:45 PM
Creation date
12/30/2022 2:22:28 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
12/13/2022
Council Approval Date
11/2/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
UP3755
Tracking Number
0003541
Total Compensation
$4,520,327.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction 7/30/2025 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction 9/5/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
978
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 11 00 -4 <br /> Water Filter Plant Portal 4 Improvements WO# 3755 I <br /> F. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade I <br /> association standard, or other similar standard, shall comply with the <br /> requirements of the latest revision thereof, and any amendment or supplement <br /> thereto in effect on the date of Invitation for Bids, except as limited to type, class I <br /> or grade, or modified in such references. All work shall conform to the standard <br /> referred to, except as modified in these specifications and the drawings. <br /> 1.9 CHECKING PLANS AND SPECIFICATIONS I <br /> A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies I <br /> or omissions in the plans and/or specifications to the Architect for a decision prior <br /> to the Submission of Bids. <br /> B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and I <br /> the specifications in regard to materials, equipment, sizes, numbers or locations, <br /> the Owner shall be the sole judge in resolving the conflict. 1 <br /> END OF SECTION 01 11 00 I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 01 11 00 - 4 SUMMARY OF WORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.