My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4523 RIVERFRONT BLVD 2023-01-18
>
Address Records
>
RIVERFRONT BLVD
>
4523
>
4523 RIVERFRONT BLVD 2023-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 5:39:42 PM
Creation date
1/19/2023 1:08:50 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
4523
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_XI F_ <br /> Ox <br /> LL] <br /> J Q <br /> D <br /> J M <br /> Q <br /> co <br /> F O <br /> co <br /> D <br /> O <br /> to <br /> r <br /> SYSTEM INFO <br /> (11)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> 400W <br /> (11)ENPHASE <br /> IQ8PLUS-72-2-US 240V <br /> DC SYSTEM SIZE:4.40 kWDC <br /> AC SYSTEM SIZE:3.30 kWAC <br /> now : <br /> ; SM SOLAR BONDING CONNECTION GROUND PATHS :11 ■ ■■■ 1; SM SOLAR ENDCLAMPI FIRST MODULEIL DESCRIPTIOEVISI DATE REV <br /> ■e ; MOUNT INSTALLATION GUIDE ; PACE ■• 11 MOUNTINSTALLATION GUIDE ; PAGE <br /> A © B C NsO Q <br /> I Signature with Seal <br /> '♦@ \ \� © EgpP SEP .� - � `" r <br /> J N <br /> lost <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOT w/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: <br /> O Bonding Hardware creates bond between splice ©Serrated Range nut removesro <br /> L foot adiraucin clamp is supplied as an assembly with a 1R' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> [ti Aluminum mid clamp with stainless steel bonding pins that pierce module frame bar and each rail—on to bond L.Foot to stainless steel T-bolt <br /> V arwdl,ation to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do <br /> © <br /> LG�♦Aluminum splice ba"Pari, radgapto pSerratedT-troll head pM,rtrates radarodization PROJECT NAME&ADDRESS <br /> -c7 create rail to ran bond.Rail ono least one side "m bor,dT.baR,nucand t-foot td nded rails.The clamp should be installed on the with the top slot of the rails. engages with end of rail not force clamp into rail by pushlnr_,stainless sleet nut bonds aluminum clamp to stainless steel T-bolt of splice will be grounded. grou <br /> SMran rails prior to installing end modules. .GI:u F xten❑cu a;ri,r Js pussti>te cod cunps err positoned on on bolt with excessive force. <br /> 0 Serrated T-bolt head penetrates rail anodization to bond T-bolt,nut,clamp,and of that clamp is positioned at mat rails prior to the first end <br /> modules to SM rail <br /> distance from end of rail. -nodule and prior to the last <br /> std module. 0 <br /> "Tc~ E J C) <br /> I j NotfurwiwrwL a t; �<i 2�► Mry� <br /> Ina women ;;I��p' -- ♦ W M r <br /> o'°�q w w O O <br /> Od. <br /> �D ig T•BOLT.�\t �q6 - / 1 ' D w U Z 00 C) <br /> ' f' TZ O 0000 <br /> BONDING BOIONif RAIL <br /> CUM ® MICROINFERTER SPLICE SM .0 <br /> of <br /> MOUNT 00 <br /> - .., m•.:g, SEE N07E WEEBLl1G(OR ILSCO LUGJ'0 U) C/) ILL � <br /> 112* <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with w w <br /> Her nut with captive lack washer bonds metal wFEB washer dim es pierce anodised rad co Install the firs[end module For best appearance. <br /> w flange in full contact with rail,rotate end clamp bolt until = w it <br /> microinverter Range to stainless steel T-bolt create bond between rail am lug position module Rush _ I - <br /> onto rails with the flange of clam engages with flange to provide clam Force. LrVL Z <br /> BoraDDaG MDQAMp © P9 P P with ends of rails.Rails U <br /> _ _ 4 Settatrd T�bolt head prnebates rail anodirafian <br /> ��� '- •' 4 to DOM TDOH,nu[.and Lfoot to grounded solid copper wire convened to lug n rowed to the module frame positioned To ensure bolt is not over-torqued,use low torque setting � should not extend more <br /> A SM,ail prcvldefinal system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as than 1/2'beyond module. M w <br /> t <br /> Module must be fully N <br /> RAIL L-roar r��►.+�r.r'�-n�R r..^.Md. of rails. Impact action of driver begins. supported by rails and <br /> TORQUE VA <br /> LU , J notes on M.AI cannot overhang ends � W <br /> NDINfi T-BOLT 9 <br /> End clamp bolt to S ft-lbs.No anti-seize of rails. <br /> DATE:6/23/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> SPECIFICATION <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.