My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7206 WETMORE AVE 2023-01-17
>
Address Records
>
WETMORE AVE
>
7206
>
7206 WETMORE AVE 2023-01-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 10:55:41 AM
Creation date
1/19/2023 2:25:40 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
7206
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3 Installing the End Modules <br /> The end modules of the PV system are fastened on the outer side with two module end clamps each. Three types of module <br /> end clamps are available from Quick Mount PV. Fixed end clamps are sized to fit a particular module thickness and will <br /> not work on modules of other thicknesses. Hidden end clamps will work on any module with a flange in the acceptable <br /> clamping zone. Universal end clamps are designed to fit 2 ranges of <br /> module thicknesses. Universal end clamps are available in the following <br /> size ranges: <br /> ■ 30-45mm -`•��- <br /> ■ 38-50mm ---` <br /> Mounting Steps, Fixed Height End Clamps: <br /> ■ Place and align an outside module. The QRail must extend beyond Image 6.3.1 <br /> the module frame by a minimum of 1.2 in. <br /> ■ Insert the QClick of the end clamp into the channel of the QRail. <br /> ■ Push the module end clamp flush to the module frame. -=== <br /> ■ Tighten the bolt to 8 ft-Lb (11 Nm), thus clamping the module. <br /> Mounting steps, Universal End Clamps: <br /> ■ Place and align an outside module. The QRail must extend <br /> beyond the module frame by 1.2 in. (30 mm). Image 6.3.2 <br /> ■ Insert the QClick of the end clamp flush against the module <br /> frame. The lip of the upper clamp body should be flush against <br /> the edge of the module. <br /> ■ Ensure that the lower section of the clamp body sits squarely on <br /> the top of the rail. <br /> ■ While holding the upper clamp body against the module and 1 2 3 <br /> the lower clamp body, tighten the clamp bolt to 8 ft-lbf (11 <br /> N-m). <br /> m age 6.3.3 <br /> End Clamp installation <br /> Material damage due to incorrect installation <br /> Incorrectly mounted clamps with QClick Technology can slip out. PV modules can fall and be <br /> damaged. Mount all clamp connections in accordance with the instructions. <br /> • <br /> ■ Make sure the clamps are installed correctly. <br /> DANGER ' Ensure the module is installed flush and tight against the side of the end clamp. <br /> ■ Ensure proper torque of the end clamp mounting bolt 8 ft-lbf(11 N-m) or 9ft-lbf for hidden <br /> end clamps. <br /> B1 7.2.3-46 26 Jul-2019, Rev 4.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.