My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2020 BLDG 45-06 Plans 2023-01-26
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-06
>
Plans
>
3003 W CASINO RD 2020 BLDG 45-06 Plans 2023-01-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:46:17 AM
Creation date
1/25/2023 11:07:50 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-06
Permit
B2010-015
Year
2020
Notes
EXCAVATE AND POUR NEW SHALLOW CONCRETE TRENCH ON SOUTH SIDE
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />III <br />3 <br />45-04 <br />I <br />itll <br />— <br />-�I <br />t -- <br />3 a <br />&7 1 <br />h I <br />BMP C220: Inlet Protetlon <br />I <br />r--s,s- <br />- <br />Runoff is conveyed North to <br />two existing detention ponds <br />(indicated on sheet 60) by <br />catch basins and storm sewer <br />piping (TYP.) <br />0 Construction access along 29th Ave W <br />ELEMENT 1: Mark Tearing Limits: <br />-BMP C103: High Visibility Fence <br />ELEMENT 2: Establish Construction Access <br />-BMP C106: Wheel Wash* <br />*location to be coordinated with Boeing <br />Environmental Services as needed <br />ELEMENT 3: Control Flow Rates <br />-BMP C220: Stones Drain Inlet Protection <br />-BMP C235: Straw Wattle (as needed) <br />ELEMENT 4: Install sediment Controls <br />-BMP C220: Storm Drain Inlet Protection <br />-BMP C235: straw Wattle (as needed) <br />ELEMENT 5: Stabilize Soils <br />-BMP C123: Plastic Covering* <br />-BMP C120: Temporary and Permanent Seeding (as <br />needed) <br />-BMP C121: Mulching (as needed) <br />*location of stockpiles to be coordinated with <br />Boeing Environmental Services <br />REVISION <br />SITE PUMPED INDUSTRIAL WASTE 20808458 <br />45-06 9 BMP C152: Sawcutting and <br />Surfacing Pollution Prevention <br />l <br />of _ <br />© <br />Y <br />� <br />ELEMENT 6: Protect Slopes ELEMENT 12: Manage the Project <br />-BMP C123: Plastic Covering -BMP C150: Materials on Hand <br />-BMP C120: Temporary and Permanent Seeding (as needed) -BMP C162: Scheduling <br />-BMP C121: Mulching (as needed) <br />ELEMENT 7: Protect Drain Inlets ELEMENT 13: Protect LID BIVIPs <br />-BMP C220: Storm Drain Inlet Protection Not applicable <br />ELEMENT 8: Stabilize Channels and Outlets <br />*Not applicable <br />ELEMENT 9: Control Pollutants <br />-BMP C151: Concrete Handling <br />-BMP C152: Sawcutting and Surfacing Pollution Prevention <br />-BMP C153: Material Delivery, storage, and Containment <br />-BMP C154: Concrete Washout Area <br />-BMP C251: Construction Stormwater Filtration <br />-BMP C253: pH Control for High pH Water <br />ELEMENT 10: Control Dewatering <br />*Refer to C-SWPPP narrative <br />ELEMENT 11: Maintain BMPs <br />-BMP C150: Materials on Hand <br />ENLARGED PAVING PLAN — REMOVAL <br />SCALE: 1" = 10' <br />REVSION BY APPROVED DATE <br />s <br />BMP C151: Concrete Handling <br />BMP C152: Sawcutting and Surfacing <br />Pollution Prevention <br />BMP C103: High <br />Visibility Fence <br />3 & 4 Install BMP C235 as <br />needed. See "Wattle <br />Notes' on Sheet C2C-2 <br />LEGEND <br />REMOVE ASPHALT PAVEMENT <br />(ASSUME 6- HMA) <br />REMOVE CONCRETE SIDEWALK <br />REMOVE EXISTING SECURITY FENCE <br />REMOVE CURB & GUTTER <br />------ ---- <br />SAWCUT LINE <br />Construction Fence <br />Silt Fence <br />Inlet Protection <br />GENERAL NOTES <br />1, REFER TO SHEET C2C-2 FOR RELATED PROJECT NOTES. <br />2. REFER TO SHEET C607-2FOR EROSION CONTROL DETAILS. <br />3. REFER TO C220-451 FOR NEW TRENCH LOCATION. <br />CONSTRUCTION NOTES <br />SAWCUT EXISTING ASPHALT AND REMOVE. EXCAVATE FOR NEW TRENCH <br />REMOVE EXISTING CONCRETE WALK <br />REMOVE EXISTING SECURITY FENCE IN TRENCH AREA. COORDINATE <br />TEMPORARY FENCE LOCATION WITH BOEING. REMOVE TEMPORARY FENCE <br />AFTER PERMANENT FENCE IS IN PLACE <br />REMOVE EXISTING CURB & GUTTER WHERE NEEDED TO EXCAVATE AND <br />CONSTRUCT NEW TRENCH. SAWCUT ASPHALT AT EDGE OF GUTTER TO <br />CLEAN UNYIELDING EDGE <br />5� INSTALL CATCH BASIN PROTECTION PER DETAIL 1/C6D7-2 <br />KEY PLAN N, <br />SCALE: NONE V <br />rrx�t.Ra, <br />SITTS & HILL <br />ENGINEERS, INC. <br />CML a STRUCTURAL v SURVEYING <br />- I <br />Pxoxetzsa,<>a-cans I xazsa)nnsms <br />Project No.: 17659 Project Mgr.: BRIE <br />Proj. Engineer. EMF Pn,I, Drafter: JDK <br />— — 1 04.03.20 <br />APPROVED BY DEBT. ogre B. Srebro 12.06.19 I Tme .SITE PUMPED INDUSTRIAL WASTE C220-45e� <br />HECKE� i <br />B. ROV� q SITE 45-YD 'GB NG. <br />ARRRoveo <br />CIVIL <br />WAS-" 45-YD-C220-451R <br />
The URL can be used to link to this page
Your browser does not support the video tag.