Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 1-02.13.RTF <br /> 3 1-02.13 Irregular Proposals <br /> 4 (October 1, 2020 APWA GSP) <br /> 5 I <br /> 6 Delete this section and replace it with the following: <br /> 7 <br /> 8 1. A Proposal will be considered irregular and will be rejected if: , <br /> 9 a. The Bidder is not prequalified when so required; <br /> 10 b. The authorized Proposal form furnished by the Contracting Agency is not <br /> 11 used or is altered; <br /> 12 c. The completed Proposal form contains any unauthorized additions, deletions, i <br /> 13 alternate Bids, or conditions; <br /> 14 d. The Bidder adds provisions reserving the right to reject or accept the award, <br /> 15 or enter into the Contract; I <br /> 16 e. A price per unit cannot be determined from the Bid Proposal; <br /> 17 f. The Proposal form is not properly executed; <br /> 18 g. The Bidder fails to submit or properly complete a Subcontractor list, if I <br /> 19 applicable, as required in Section 1-02.6; <br /> 20 h. The Bidder fails to submit or properly complete a Disadvantaged Business <br /> 21 Enterprise Certification, if applicable, as required in Section 1-02.6; I <br /> 22 i. The Bidder fails to submit written confirmation from each DBE firm listed on <br /> 23 the Bidder's completed DBE Utilization Certification that they are in <br /> 24 agreement with the bidder's DBE participation commitment, if applicable, as <br /> 25 required in Section 1-02.6, or if the written confirmation that is submitted fails <br /> 26 to meet the requirements of the Special Provisions; <br /> 27 j The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, <br /> 28 as required in Section 1-02.6, or if the documentation that is submitted fails to I <br /> 29 demonstrate that a Good Faith Effort to meet the Condition of Award was <br /> 30 made; <br /> 31 k. The Bidder fails to submit a DBE Bid Item Breakdown form, if applicable, as I <br /> 32 required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 33 meet the requirements of the Special Provisions; <br /> 34 I. The Bidder fails to submit DBE Trucking Credit Forms, if applicable, as Il <br /> 35 required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 36 meet the requirements of the Special Provisions; <br /> 37 m. The Bid Proposal does not constitute a definite and unqualified offer to meet I <br /> 38 the material terms of the Bid invitation; or <br /> 39 n. More than one Proposal is submitted for the same project from a Bidder <br /> 40 under the same or different names. <br /> 41 I <br /> 42 2. A Proposal may be considered irregular and may be rejected if: <br /> 43 a. The Proposal does not include a unit price for every Bid item; <br /> 44 b. Any of the unit prices are excessively unbalanced (either above or below the I <br /> 45 amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 46 Agency; <br /> 47 c. Receipt of Addenda is not acknowledged; I <br /> 48 d. A member of a joint venture or partnership and the joint venture or <br /> 49 partnership submit Proposals for the same project (in such an instance, both <br /> 50 Bids may be rejected); or I <br /> 51 e. If Proposal form entries are not made in ink. <br /> I <br /> FLEMING BICYCLE CORRIDOR 10 <br /> PW 3767 November 15, 2022 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.