My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Other <br /> I <br /> 2 3 Driveway access will not be restricted for more than three days.All construction <br /> activity that blocks access to private property shall be coordinated with Engineer <br /> 4 five(5)days prior.At that time, contractor shall also provide notification of access <br /> I <br /> 5 limitation to affected property owner(s). <br /> 6 *** <br /> 7 <br /> I <br /> 8 9 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 10 in writing of any change in the closure hours. <br /> 11 <br /> I <br /> 12 13 Lane closures are not allowed on any of the following: <br /> 14 1. A holiday, <br /> I 15 <br /> 16 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or <br /> 17 Monday are considered a holiday weekend. A holiday weekend includes <br /> I18 19 Saturday, Sunday, and the holiday. <br /> 20 3. After*** 2:30 pm *** on the day prior to a holiday or holiday weekend, and <br /> I 21 <br /> 22 4. Before *** 7:00 am *** on the day after the holiday or holiday weekend. <br /> 23 <br /> I <br /> 24 Contractor shall return lanes to normal operations at the end of each working day or <br /> 25 provide temporary pavement markings and temporary traffic control devices. Tape <br /> 26 maybe used for temporary pavement marking for a maximum of one week. If <br /> 27 temporary pavement markings are used for longer than one week, raised pavement <br /> I <br /> 28 29 markers shall be used. <br /> 30 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> I 31 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 32 in writing of any change in closure hours. <br /> 33 <br /> I 34 All traffic control plans and detour plans shall be developed per City of Everett <br /> 35 Standard drawings 701 to 714, and 726. <br /> 36 <br /> 37 <br /> I38 1-07.24.RTF <br /> 39 1-07.24 Rights of Way <br /> 40 (July 23, 2015 APWA GSP) <br /> I 41 <br /> 42 Delete this section and replace it with the following: <br /> 43 <br /> I <br /> 44 45 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 46 these limits, unless arrangements for use of private property are made. <br /> I 47 <br /> 48 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 49 way and easements, both permanent and temporary, necessary for carrying out the <br /> I <br /> 50 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 51 Contractor's attention by a duly issued Addendum. <br /> I <br /> FLEMING BICYCLE CORRIDOR 57 <br /> I <br /> PW 3767 November 15, 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.