Laserfiche WebLink
I <br /> 1 Other <br /> I <br /> 2 3 Driveway access will not be restricted for more than three days.All construction <br /> activity that blocks access to private property shall be coordinated with Engineer <br /> 4 five(5)days prior.At that time, contractor shall also provide notification of access <br /> I <br /> 5 limitation to affected property owner(s). <br /> 6 *** <br /> 7 <br /> I <br /> 8 9 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 10 in writing of any change in the closure hours. <br /> 11 <br /> I <br /> 12 13 Lane closures are not allowed on any of the following: <br /> 14 1. A holiday, <br /> I 15 <br /> 16 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or <br /> 17 Monday are considered a holiday weekend. A holiday weekend includes <br /> I18 19 Saturday, Sunday, and the holiday. <br /> 20 3. After*** 2:30 pm *** on the day prior to a holiday or holiday weekend, and <br /> I 21 <br /> 22 4. Before *** 7:00 am *** on the day after the holiday or holiday weekend. <br /> 23 <br /> I <br /> 24 Contractor shall return lanes to normal operations at the end of each working day or <br /> 25 provide temporary pavement markings and temporary traffic control devices. Tape <br /> 26 maybe used for temporary pavement marking for a maximum of one week. If <br /> 27 temporary pavement markings are used for longer than one week, raised pavement <br /> I <br /> 28 29 markers shall be used. <br /> 30 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> I 31 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 32 in writing of any change in closure hours. <br /> 33 <br /> I 34 All traffic control plans and detour plans shall be developed per City of Everett <br /> 35 Standard drawings 701 to 714, and 726. <br /> 36 <br /> 37 <br /> I38 1-07.24.RTF <br /> 39 1-07.24 Rights of Way <br /> 40 (July 23, 2015 APWA GSP) <br /> I 41 <br /> 42 Delete this section and replace it with the following: <br /> 43 <br /> I <br /> 44 45 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 46 these limits, unless arrangements for use of private property are made. <br /> I 47 <br /> 48 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 49 way and easements, both permanent and temporary, necessary for carrying out the <br /> I <br /> 50 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> 51 Contractor's attention by a duly issued Addendum. <br /> I <br /> FLEMING BICYCLE CORRIDOR 57 <br /> I <br /> PW 3767 November 15, 2022 <br />