I <br /> 1 <br /> 2 Whenever any of the work is accomplished on or through property other than public 1 <br /> 3 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 4 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 5 property. Copies of the easement agreements may be included in the Contract I <br /> 6 Provisions or made available to the Contractor as soon as practical after they have been <br /> 7 obtained by the Engineer. <br /> 8 <br /> 9 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> 10 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> 11 of the work in areas where right of way, easements or rights of entry have not been <br /> 12 acquired until the Engineer certifies to the Contractor that the right of way or easement is I <br /> 13 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 14 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> 15 entry or right of way, the Contractor will be entitled to an extension of time. The <br /> 16 Contractor agrees that such delay shall not be a breach of contract. <br /> 17 <br /> 18 Each property owner shall be given 48 hours notice prior to entry by the Contractor. This I <br /> 19 includes entry onto easements and private property where private improvements must <br /> 20 be adjusted. <br /> 21 I <br /> 22 The Contractor shall be responsible for providing, without expense or liability to the <br /> 23 Contracting Agency, any additional land and access thereto that the Contractor may <br /> 24 desire for temporary construction facilities, storage of materials, or other Contractor <br /> 25 needs. However, before using any private property, whether adjoining the work or not, I <br /> 26 the Contractor shall file with the Engineer a written permission of the private property <br /> 27 owner, and, upon vacating the premises, a written release from the property owner of <br /> 28 each property disturbed or otherwise interfered with by reasons of construction pursued I <br /> 29 under this contract. The statement shall be signed by the private property owner, or <br /> 30 proper authority acting for the owner of the private property affected, stating that <br /> 31 permission has been granted to use the property and all necessary permits have been I <br /> 32 obtained or, in the case of a release, that the restoration of the property has been <br /> 33 satisfactorily accomplished. The statement shall include the parcel number, address, <br /> 34 and date of signature. Written releases must be filed with the Engineer before the <br /> 35 Completion Date will be established. <br /> 36 <br /> 37 1-08.GR1 <br /> 38 Prosecution and Progress I <br /> 39 <br /> 40 1-08.0.RTF <br /> I <br /> 41 1-08 PROSECUTION AND PROGRESS <br /> 42 I <br /> 43 Add the following new section: <br /> 44 <br /> 45 1-08.0 Preliminary Matters I <br /> 46 (May 25, 2006 APWA GSP) <br /> 47 <br /> I <br /> I <br /> FLEMING BICYCLE CORRIDOR 58 <br /> PW 3767 November 15, 2022 I <br />