My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 1/23/2023
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
Always Active Services 1/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 3:35:38 PM
Creation date
1/27/2023 9:43:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
1/23/2023
Council Approval Date
12/21/2022
End Date
1/4/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Fleming Bicycle Corridor
Public Works WO Number
PW3767
Tracking Number
0003556
Total Compensation
$473,273.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 Whenever any of the work is accomplished on or through property other than public 1 <br /> 3 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 4 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 5 property. Copies of the easement agreements may be included in the Contract I <br /> 6 Provisions or made available to the Contractor as soon as practical after they have been <br /> 7 obtained by the Engineer. <br /> 8 <br /> 9 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> 10 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> 11 of the work in areas where right of way, easements or rights of entry have not been <br /> 12 acquired until the Engineer certifies to the Contractor that the right of way or easement is I <br /> 13 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 14 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> 15 entry or right of way, the Contractor will be entitled to an extension of time. The <br /> 16 Contractor agrees that such delay shall not be a breach of contract. <br /> 17 <br /> 18 Each property owner shall be given 48 hours notice prior to entry by the Contractor. This I <br /> 19 includes entry onto easements and private property where private improvements must <br /> 20 be adjusted. <br /> 21 I <br /> 22 The Contractor shall be responsible for providing, without expense or liability to the <br /> 23 Contracting Agency, any additional land and access thereto that the Contractor may <br /> 24 desire for temporary construction facilities, storage of materials, or other Contractor <br /> 25 needs. However, before using any private property, whether adjoining the work or not, I <br /> 26 the Contractor shall file with the Engineer a written permission of the private property <br /> 27 owner, and, upon vacating the premises, a written release from the property owner of <br /> 28 each property disturbed or otherwise interfered with by reasons of construction pursued I <br /> 29 under this contract. The statement shall be signed by the private property owner, or <br /> 30 proper authority acting for the owner of the private property affected, stating that <br /> 31 permission has been granted to use the property and all necessary permits have been I <br /> 32 obtained or, in the case of a release, that the restoration of the property has been <br /> 33 satisfactorily accomplished. The statement shall include the parcel number, address, <br /> 34 and date of signature. Written releases must be filed with the Engineer before the <br /> 35 Completion Date will be established. <br /> 36 <br /> 37 1-08.GR1 <br /> 38 Prosecution and Progress I <br /> 39 <br /> 40 1-08.0.RTF <br /> I <br /> 41 1-08 PROSECUTION AND PROGRESS <br /> 42 I <br /> 43 Add the following new section: <br /> 44 <br /> 45 1-08.0 Preliminary Matters I <br /> 46 (May 25, 2006 APWA GSP) <br /> 47 <br /> I <br /> I <br /> FLEMING BICYCLE CORRIDOR 58 <br /> PW 3767 November 15, 2022 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.