Laserfiche WebLink
I <br /> 1 Northwest Region — NWRegionOEO(a�wsdot.wa.gov <br /> I <br /> 2 3 Olympic Region — ORegionOEO(a wsdot.wa.gov <br /> South Central Region —SCRegionOEO c(.�,wsdot.wa.gov <br /> 4 Southwest Region — SWRegionOEO(a�wsdot.wa.gov <br /> I5 6 Washington State Ferries — FerriesOEO(a�wsdot.wa.gov <br /> 7 The Contractor's records pertaining to the requirements of this Special Provision shall be <br /> I 8 open to inspection or audit by representatives of the Contracting Agency during the life of <br /> 9 the contract and for a period of not less than three years after the date of acceptance of <br /> 10 the contract. The Contractor shall retain these records for that period. The Contractor <br /> 11 shall also guarantee that these records of all Subcontractors and lower tier <br /> 1 <br /> 12 Subcontractors shall be available and open to similar inspection or audit for the same <br /> 13 time period. <br /> 14 <br /> I 15 1-08.3.GR1 <br /> 16 Progress Schedule <br /> 17 <br /> I 18 1-08.3(2)A.RTF <br /> 19 1-08.3(2)A Type A Progress Schedule <br /> 20 (March 13, 2012 APWA GSP) <br /> I 21 <br /> 22 Revise this section to read: <br /> 23 <br /> i 24 <br /> The Contractor shall submit ***3*** copies of a Type A Progress Schedule no later than <br /> 25 ***10 working days after the preconstruction conference***, or some other mutually agreed <br /> 26 upon submittal time. The schedule may be a critical path method (CPM) schedule, bar <br /> 27 chart, or other standard schedule format. Regardless of which format used, the schedule <br /> I28 shall identify the critical path. The Engineer will evaluate the Type A Progress Schedule <br /> 29 and approve or return the schedule for corrections within 15 calendar days of receiving the <br /> 30 submittal. <br /> I 31 <br /> 32 1-08.4.RTF <br /> 33 1-08.4 Prosecution of Work <br /> 1 34 <br /> 35 Delete this section and replace it with the following: <br /> 36 <br /> I 37 1-08.4 Notice to Proceed and Prosecution of Work <br /> 38 (July 23, 2015 APWA GSP) <br /> 39 <br /> I 40 Notice to Proceed will be given after the contract has been executed and the contract <br /> 41 bond and evidence of insurance have been approved and filed by the Contracting <br /> 42 Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> I43 has been given by the Engineer. The Contractor shall commence construction activities <br /> 44 on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> 45 approved in writing. The Contractor shall diligently pursue the work to the physical <br /> 46 completion date within the time specified in the contract. Voluntary shutdown or slowing <br /> I 47 of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> 48 complete the work within the time(s) specified in the contract. <br /> 49 <br /> I 50 When shown in the Plans, the first order of work shall be the installation of high visibility <br /> 51 fencing to delineate all areas for protection or restoration, as described in the Contract. <br /> I <br /> FLEMING BICYCLE CORRIDOR 61 <br /> IPW 3767 November 15, 2022 <br />