Laserfiche WebLink
2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1 -- Administered by©2022 NEEA,All rights reserved <br /> The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at cam.techsupport@waenergycodes.com <br /> NO I Provide schedule that lists the number of { general switching { j <br /> controlled and uncontrolled receptacles in 'shown-final switching <br /> each space where controlled receptacles are by electrical { <br /> { required-classrooms,private offices,open contractor under their <br /> office areas,conference rooms,copy rooms, {permit <br /> break rooms and modular <br /> (partitions/workstations ( I <br /> NA Indicate on plans the method of automatic <br /> control for each controlled receptacle zone <br /> { (occupant sensor or programmable time-of- <br /> day <br /> control);indicate that each zone served by <br /> a single controller does not exceed 5,000 sf• <br /> • <br /> C405.2.5, Switched receptacles Indicate method of automatic off control of <br /> hem 2 in sleeping units all switched receptacles in sleeping units <br /> (vacancy or key card control) <br /> NA C503.6.6 —I Electrical receptacle i Where new receptacles are added or replaced <br /> alerations I within an alteration project that is 5,000 sf or <br /> larger,indicate receptacles are provided with <br /> automatic controls per C405.10,or exception <br /> taken <br /> MOTORS,TRANSFORMERS,ELECTRIC METERS,INTERIOR TRANSPORTATION <br /> • <br /> C405.6 E Electrical Include electrical transformer schedule on ? i <br /> (transformers electrical plans:indicate transformer type_ <br /> i a <br /> size,efficiency,or exception taken I I <br /> ' 3 <br /> NO C405.11 Feeders and branch Provide documentation that demonstrates general switching <br /> { circuits maximum voltage drop across feeders and shown-final switching <br /> branch circuits does not exceed 5% by electrical <br /> contractor under their <br /> permit I j <br /> C405.7 Dwelling unit °Indicate on electrical plans that each dwelling <br /> electrical energy unit in Group R-2 has a separate electrical <br /> consumption ; energy meter <br /> C405.8 Electric motor Include all motors.including fractional hp I j <br /> efficiency (motors,in electric motor schedule on <br /> electrical plans;indicate motor type, <br /> horsepower,rpm,rated efficiency,or <br /> exception applied <br /> C405.9.1 Elevator cabs (For luminaires in each elevator cab,provide <br /> calculations that demonstrate average efficacy <br /> is not less than 35 lumens per.watt <br /> For elevators that do not have an integral air <br /> ( conditioning system,indicate rated watts per <br /> cfrn for elevator cab ventilation fans do not <br /> exceed 0.33 waits per cfm <br /> • <br /> I ( Indicate automatic controls that de-energize <br /> 1 <br /> { ! lighting and ventilation fans when elevator is <br /> stopped and unoccupied for a period of 15 <br /> ii Minutes or more. . { <br /> — — C405.9.2 Escalators and (Indicate escalators comply with ASME <br /> 1 — <br /> moving walks a17.1/CSA S 44:automatic controls are <br /> configured to reduce operational speed to the <br /> — ,minimum permitted when not in use ! <br /> Page 9/11 <br />