My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3216 - 1 <br /> 2023 Biosolids Removal UT 3752-30 <br /> SECTION 01 3216 - CONSTRUCTION PROGRESS SCHEDULE <br /> 1.1 CONSTRUCTION SCHEDULE <br /> A. The Contractor shall prepare a construction schedule showing all tasks required <br /> to perform the work. Schedule shall show all tasks performed by all trades that <br /> is required to perform work within the contract time. The Schedule shall include <br /> sufficient time for cleaning, punch list review, and completion of punch list items <br /> prior to the designated physical completion date. <br /> 1.2 FORMAT <br /> A. The Schedule shall be a critical path method of Gantt chart style. <br /> B. The Schedule shall clearly identify all work and detailed to show specific steps to <br /> perform work. The relationship between the work items shall show the starting <br /> date, length of time required to perform work, completion of the work within the <br /> time frame shown. <br /> C. All work found on the schedule of values shall be clearly identified. Unless <br /> otherwise expressly authorized in writing by the City's representative, the <br /> Contractor must integrate the schedules with the Schedule of Values and unit <br /> price items so that each construction activity is represented by a dollar value. <br /> 1 D. Submittals dates shall be included and the relationship between submittal and <br /> the work item shall be identified <br /> E. Materials requiring long lead times shall be clearly identified on the schedule. <br /> This shall include: <br /> 1. Date materials musts be ordered <br /> 2. Time for manufacturing <br /> 3. Time for delivery <br /> 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> 1 1.3 SUBMITTAL <br /> A. At the pre-construction meeting, a preliminary schedule is required to be <br /> submitted. Once the preliminary schedule has been approved, the schedule shall <br /> become the Project Schedule. The Project Schedule, as approved by the City, <br /> will be an integral part of the contract and will establish interim completion dates <br /> for the various activities under the contract. <br /> 01 3216 - 1 CONSTRUCTION PROGRESS SCHEDULE <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.