My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3216 - 2 <br /> 2023 Biosolids Removal UT 3752-30 <br /> B. Schedule shall be submitted electronically. Acceptable format .xls, .mpp and pdf. I <br /> C. Review by the City or City's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, 111 <br /> order, precedence and succession of activities or Contractor's ability to complete <br /> the Work in a timely manner. <br /> D. The review/approval of anyschedule shall not transfer anyof the Contractor's <br /> responsibilities to the City. <br /> E. Subcontractors shall review all schedules prior to submittal. At the p <br /> City's option <br /> and sole discretion, City may require Contractor to obtain written acceptance of <br /> each schedule by subcontractors as practical and feasible, as the schedule <br /> relates to subcontractors' work. <br /> 1.4 UPDATES I <br /> A. The Project Construction Schedule will be reviewed and updated at each <br /> progress meeting. All changes to the project schedule of more than three (3) <br /> working days shall be documented. The Schedule shall be updated to show <br /> measures required to bring project back on schedule. The Contractor alone shall I <br /> remain responsible for adjusting forces, equipment, and work schedules to <br /> ensure completion of the work within the Contract Time. Any mistakes or errors <br /> in any schedule, including, but not limited to, mistakes or errors of logic, order, I <br /> precedence, and duration, are and remain the Contractor's. <br /> B. Should any activity not be completed by the stated scheduled date, the City will <br /> have the right to require the Contractor to expedite completion of the activity by <br /> whatever means appropriate and necessary, without additional compensation to <br /> the Contractor. 1 <br /> C. The Schedule shall be used to justify time extension days requested by the <br /> Contractor. For additional days requested, the Schedule shall be detailed enough I <br /> to identify the work item(s) affected and the relationship to the changed or added <br /> work. <br /> D. Schedule shall be provided during the construction meetings. Schedule shall be <br /> on 11x17 papers and shall show current work progress. <br /> END OF SECTION 01 3216 <br /> I <br /> I <br /> 01 3216 - 2 CONSTRUCTION PROGRESS SCHEDULE <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.