Laserfiche WebLink
City of Everett 01 3300 - 1 <br /> 2023 Biosolids Removal UT 3752- 30 <br /> I <br /> SECTION 01 3300 - SUBMITTAL PROCEDURES <br /> I <br /> 1.1 DESCRIPTION <br /> A. To ensure that the specified products are furnished and installed in accordance <br /> with the design intent, procedures have been established for advance submittal <br /> of design data and for its review by the City. <br /> B. Electronic submittals of shop drawings or other documents required for approval <br /> may be substituted for paper copies. Electronic submittals must be submitted <br /> utilizing current portable document format (PDF) software. All electronic <br /> submittals shall be certified documents and digitally signed showing Contractors <br /> review, and stamp showing approval of submittal. All electronic submittals shall <br /> be book-marked. A table of contents is required and shall be placed directly <br /> behind the cover page. Document properties shall include the Job Name, <br /> Division (Section Number), and items included in submittal. Prior to use of <br /> Electronic submittals, discuss with City, procedures and formatting including any <br /> additional contents to be included within the document. <br /> IC. Related Work: <br /> 1. For individual submittals required, refer to the pertinent sections of these <br /> specifications. <br /> 2. Section 00 7200 General Condition, Article 2.4 <br /> 3. Make all submittals required by the Contract Documents, revise and <br /> resubmit as required to establish compliance with the specified <br /> requirements. <br /> 4. Wherever possible throughout the Contract Documents, the minimum <br /> acceptable quality of workmanship and materials has been defined by <br /> manufacturer's description of required attributes and performance. <br /> 1.2 PRODUCT HANDLING <br /> A. Make all submittals of shop drawings, samples, requests for substitution, and <br /> other similar items in strict accordance with the provisions of this section of the <br /> specifications. <br /> 1.3 IDENTIFICATION OF SUBMITTALS <br /> A. Consecutively number all submittals. Accompany each submittal with a letter of <br /> p Y <br /> transmittal showing the transmittal number, date of transmittal, specifications <br /> section or drawing number to which the submittal pertains, brief description of the <br /> material submitted, and the company name of the originator of the submittal. <br /> 01 3300 - 1 SUBMITTAL PROCEDURES <br /> I <br />