My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3300 - 1 <br /> 2023 Biosolids Removal UT 3752- 30 <br /> I <br /> SECTION 01 3300 - SUBMITTAL PROCEDURES <br /> I <br /> 1.1 DESCRIPTION <br /> A. To ensure that the specified products are furnished and installed in accordance <br /> with the design intent, procedures have been established for advance submittal <br /> of design data and for its review by the City. <br /> B. Electronic submittals of shop drawings or other documents required for approval <br /> may be substituted for paper copies. Electronic submittals must be submitted <br /> utilizing current portable document format (PDF) software. All electronic <br /> submittals shall be certified documents and digitally signed showing Contractors <br /> review, and stamp showing approval of submittal. All electronic submittals shall <br /> be book-marked. A table of contents is required and shall be placed directly <br /> behind the cover page. Document properties shall include the Job Name, <br /> Division (Section Number), and items included in submittal. Prior to use of <br /> Electronic submittals, discuss with City, procedures and formatting including any <br /> additional contents to be included within the document. <br /> IC. Related Work: <br /> 1. For individual submittals required, refer to the pertinent sections of these <br /> specifications. <br /> 2. Section 00 7200 General Condition, Article 2.4 <br /> 3. Make all submittals required by the Contract Documents, revise and <br /> resubmit as required to establish compliance with the specified <br /> requirements. <br /> 4. Wherever possible throughout the Contract Documents, the minimum <br /> acceptable quality of workmanship and materials has been defined by <br /> manufacturer's description of required attributes and performance. <br /> 1.2 PRODUCT HANDLING <br /> A. Make all submittals of shop drawings, samples, requests for substitution, and <br /> other similar items in strict accordance with the provisions of this section of the <br /> specifications. <br /> 1.3 IDENTIFICATION OF SUBMITTALS <br /> A. Consecutively number all submittals. Accompany each submittal with a letter of <br /> p Y <br /> transmittal showing the transmittal number, date of transmittal, specifications <br /> section or drawing number to which the submittal pertains, brief description of the <br /> material submitted, and the company name of the originator of the submittal. <br /> 01 3300 - 1 SUBMITTAL PROCEDURES <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.