American Process Group 2/9/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
American Process Group 2/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 10:40:17 AM
Creation date
2/10/2023 10:31:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group
Approval Date
2/9/2023
Council Approval Date
1/4/2023
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2023 Biosolids Removal
Public Works WO Number
UT3808-2
Tracking Number
0003575
Total Compensation
$709,420.99
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3300 - 2 <br /> 2023 Biosolids Removal UT 3752- 30 <br /> B. Resubmittal's shall be numbered with the same number as the original submittal <br /> followed by a sub nomenclature such as -A, -B, -C, or .01, .02, .03, for example: <br /> Original Submittal — 01 5000 <br /> Resubmittal 1 — 01 5000.01 <br /> Resubmittal 2 — 01 5000.02, etc. <br /> C. Maintain an accurate submittal log for the duration of the construction period, ' <br /> showing status of all submittals. Make the log available to the Project Manager <br /> upon request. <br /> 1.4 COORDINATION OF SUBMITTALS <br /> A. Prior to submittal for Project Manager's review, use all means necessary to fully I <br /> coordinate all material, including the following: <br /> 1. Determine and verify all field dimensions and conditions. , <br /> 2. Coordinate with all trades and all public agencies. <br /> 3. Secure for and pay all necessary approvals and permits from public <br /> agencies having jurisdiction. I <br /> 4. Clearly indicate all deviations from the contract documents. <br /> B. Unless otherwise permitted by the Project Manager, make all submittals in groups I <br /> containing associated items. The Project Manager may reject partial submittals <br /> as not complying with the contract documents. <br /> 1.5 TIMING OF SUBMITTALS <br /> A. Within fifteen (15) calendar days from the notice to proceed, submit a Schedule I <br /> of Submittals identifying the required submittals, anticipated submittal date of <br /> submittals, requested review schedule and submittals for which the review and <br /> approval is critical to the project schedule. <br /> B. Make all submittals far enough in advance of scheduled work to provide required <br /> time for reviews and delivery of materials. Allow thirty (30) days for the Project <br /> Manager's review following his/her receipt of the submittal. <br /> C. Costs of delays caused by tardiness of submittals may be back charged as I <br /> necessary and shall not be borne by the City. <br /> I <br /> END OF SECTION 01 3300 <br /> 01 3300 - 2 SUBMITTAL PROCEDURES <br /> I <br />