Laserfiche WebLink
September 24, 2018 <br /> HWA Project No. 2015-061-21 <br /> primary and secondary consolidation. All utility connections to the Lift Station 33 wet/dry well <br /> and deep manhole structures should be designed with flexible connections to accommodate <br /> differential settlements. <br /> 4.4.2 Anticipated Differential Settlements Associated with the CSO Outfall Pipe <br /> An existing 60-inch concrete CSO pipe crosses below the proposed grade increase at the south <br /> end of the site. The foundation of this pipe is currently unknown. However, we expect that at <br /> the very least, the CSO outfall construction would have removed some of the compressible soils <br /> under the pipe. Therefore, it is likely that the CSO alignment will represent a line of reduced <br /> settlement once the grade is increased. This linear zone of reduced settlement will result in a <br /> high point of any proposed utilities crossing over the CSO outfall pipe. We recommend that all <br /> pipes crossing the CSO outfall alignment be designed with flexible pipe material and enough fall <br /> to maintain functionality assuming as much as 10 inches of differential settlement across the <br /> outfall alignment. <br /> 4.5 FOUNDATION RECOMMENDATIONS <br /> 4.5.1 Restroom Foundation <br /> It is our understanding that the proposed restroom structure is to consist of a single-story <br /> building located wholly within preload surcharge Zone 1. Based on our evaluations we expect <br /> that preload surcharge Zone 1 could experience 3 to 5 inches of settlement over 50 years with <br /> 2 inches of differential settlement expected. To accommodate these anticipated differential <br /> settlements, we recommend that the restroom structure be founded on a structural mat foundation <br /> capable of tolerating these settlements. An allowable bearing pressure of 2,000 psf should be <br /> assumed for the mat foundation. The mat foundation should be founded on a minimum 1.5-foot- <br /> ' thick layer of compacted Crushed Surfacing Base Course. The Crushed Surfacing Base Course <br /> should extend a minimum of 5 feet laterally from the outside edge of the mat foundation in every <br /> direction. <br /> 4.5.2 Foundation Consideration for the Picnic Shelter Canopy Roof Structure <br /> It is our understanding that a picnic shelter is to be constructed to the east of the restroom <br /> facility. The picnic shelter is to consist of a steel cantilever canopy roof structure that is to be <br /> constructed as part of the future phases of park improvements. The picnic shelter canopy roof <br /> structure will be highly susceptible to damage due to differential settlements across the structure. <br /> Due to the anticipated long-term settlement expected across the location of the picnic shelter, we <br /> recommend that the structure be either supported on small diameter steel piles (Pin Piles) or a <br /> mat foundations with the ability to relevel the individual structural elements. <br /> Final Geotechnical Report-3-Acre Park.docx 16 HWA GeoSciences Inc. <br />