My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3535 RIVERFRONT BLVD Geotech Report 2023-02-22
>
Address Records
>
RIVERFRONT BLVD
>
3535
>
Geotech Report
>
3535 RIVERFRONT BLVD Geotech Report 2023-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 10:23:30 AM
Creation date
2/22/2023 10:18:41 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3535
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 24, 2018 <br /> HWA Project No. 2015-061-21 <br /> primary and secondary consolidation. All utility connections to the Lift Station 33 wet/dry well <br /> and deep manhole structures should be designed with flexible connections to accommodate <br /> differential settlements. <br /> 4.4.2 Anticipated Differential Settlements Associated with the CSO Outfall Pipe <br /> An existing 60-inch concrete CSO pipe crosses below the proposed grade increase at the south <br /> end of the site. The foundation of this pipe is currently unknown. However, we expect that at <br /> the very least, the CSO outfall construction would have removed some of the compressible soils <br /> under the pipe. Therefore, it is likely that the CSO alignment will represent a line of reduced <br /> settlement once the grade is increased. This linear zone of reduced settlement will result in a <br /> high point of any proposed utilities crossing over the CSO outfall pipe. We recommend that all <br /> pipes crossing the CSO outfall alignment be designed with flexible pipe material and enough fall <br /> to maintain functionality assuming as much as 10 inches of differential settlement across the <br /> outfall alignment. <br /> 4.5 FOUNDATION RECOMMENDATIONS <br /> 4.5.1 Restroom Foundation <br /> It is our understanding that the proposed restroom structure is to consist of a single-story <br /> building located wholly within preload surcharge Zone 1. Based on our evaluations we expect <br /> that preload surcharge Zone 1 could experience 3 to 5 inches of settlement over 50 years with <br /> 2 inches of differential settlement expected. To accommodate these anticipated differential <br /> settlements, we recommend that the restroom structure be founded on a structural mat foundation <br /> capable of tolerating these settlements. An allowable bearing pressure of 2,000 psf should be <br /> assumed for the mat foundation. The mat foundation should be founded on a minimum 1.5-foot- <br /> ' thick layer of compacted Crushed Surfacing Base Course. The Crushed Surfacing Base Course <br /> should extend a minimum of 5 feet laterally from the outside edge of the mat foundation in every <br /> direction. <br /> 4.5.2 Foundation Consideration for the Picnic Shelter Canopy Roof Structure <br /> It is our understanding that a picnic shelter is to be constructed to the east of the restroom <br /> facility. The picnic shelter is to consist of a steel cantilever canopy roof structure that is to be <br /> constructed as part of the future phases of park improvements. The picnic shelter canopy roof <br /> structure will be highly susceptible to damage due to differential settlements across the structure. <br /> Due to the anticipated long-term settlement expected across the location of the picnic shelter, we <br /> recommend that the structure be either supported on small diameter steel piles (Pin Piles) or a <br /> mat foundations with the ability to relevel the individual structural elements. <br /> Final Geotechnical Report-3-Acre Park.docx 16 HWA GeoSciences Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.