My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 12/16/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering Inc. 12/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:15 PM
Creation date
3/3/2023 1:19:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
12/16/2022
Council Approval Date
12/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Services for the Replacement of Reservoir 3
Public Works WO Number
UP3739
Tracking Number
0003587
Total Compensation
$2,994,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 7/19/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Everett – Replacement of Reservoir 3 7 Scope of Services <br />9. Facilitate and attend a 90% design review workshop to discuss comments provided by <br />the City. Consultant will prepare and provide a comment log in Microsoft Excel format to <br />track comment responses. <br />10. Upon receipt of City’s 90% design review comments, Consultant will incorporate agreed <br />upon comments and prepare a bid set of contract documents signed and stamped by a <br />professional engineer licensed in the State of Washington. Reservoir drawings and <br />structural calculations will be stamped by a structural engineer licensed in the State of <br />Washington. This will include special provisions to the specifications to be included as <br />part of the contract specifications and a Class 1 OPCC for City’s reference. <br />Client Responsibilities <br />1. Provide reviews, as needed, with one set of consolidated (conflict resolved) comments <br />within 10 business days of receiving the submittal documents. <br />2. Responsible for preparation of Division 0 (Front-end specifications). <br />Assumptions <br />1. Construction drawings will be prepared on 22” x 34” full-size drawings, allowing for <br />reproduction at a half-size scale of 11” x 17”. <br />2. Plan and profile sheets will be produced at a 1” = 20’ horizontal scale for plan <br />(horizontal) view and 1” = 5’ for profile (vertical) view allowing for approximately 500 <br />linear feet of pipeline to be placed on a single plan and profile sheet. <br />3. Plans and surveys shall conform to City CADD standards. <br />4. Technical specifications will be based on the City’s current Design and Construction <br />Standards and Specifications (2022-Design-and-Construction-Standards-Vol1-and-Vol2 <br />(everettwa.gov)) dated January 2022. Up to 15 new technical specifications with <br />modifications on up to 30 technical specifications are anticipated to be included as part <br />of the special provisions to the specifications. <br />5. The Lauren Valve Connection will be included in the bid documents for Phase 1. <br />6. Design review workshops will be held in person at the City’s offices and is assumed to <br />be two hours in length and will be attended by up to five Consultant staff members with <br />an additional two hours accounting for travel time. <br />Deliverables <br />1. 30% design documents (PDF format) including comment log (Excel format). <br />2. 60% design documents (PDF format) including comment log (Excel format). <br />3. 90% design documents (PDF format) including comment log (Excel format). <br />4. Issue for Bid contract documents (PDF format). <br />Task 400 – Phase 1 Bid Phase Services <br />Task Objective <br />The purpose of this task is to provide assistance to the City during the bid phase of the Phase 1 <br />Reservoir No. 3 Replacement project.
The URL can be used to link to this page
Your browser does not support the video tag.