My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 12/16/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering Inc. 12/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:15 PM
Creation date
3/3/2023 1:19:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
12/16/2022
Council Approval Date
12/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Services for the Replacement of Reservoir 3
Public Works WO Number
UP3739
Tracking Number
0003587
Total Compensation
$2,994,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 7/19/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Everett – Replacement of Reservoir 3 11 Scope of Services <br />4. Work with City staff to review the bids received, check selected references as directed <br />by the City and assist the City regarding the decision and recommendation to award the <br />contract. <br />5. Prepare conformed set of contract documents to include addenda issued during the <br />bidding process. <br />Client Responsibilities <br />1. Prepare and advertise the contract for bid. <br />2. Coordinate and conduct pre-bid conference and bid-opening including preparing agenda <br />and meeting notes. <br />3. Primary contact for bidders questions including coordinating and tracking bidder <br />communications and issuing addendums. <br />4. Coordinate City’s legal representative with HDR regarding recommendations of award <br />that may involve waiver of formalities or irregularities in the bid. <br />Assumptions <br />1. Pre-bid conference will occur at the City’s offices with a visit to the Reservoir No. 3 site <br />to follow. This combined effort is assumed to be four hours in length and will be attended <br />in person by up to two Consultant staff members with an additional two hours accounting <br />for travel time. <br />2. Hard copies of the pre-bid conference agenda, documents and handouts, will be <br />provided by the City. <br />3. Services will be provided after bids are received. It is assumed that 20 sheets will be <br />updated with up to one hour of CADD staff per sheet. <br />Deliverables <br />1. If necessary, up to seven addenda addressing bidding questions, via e-mail in pdf <br />format. <br />2. Conformed set of 11”x17” Contract Drawings submitted electronically in pdf format and <br />AutoCAD files. <br />Task 700 – Design Support Services <br />Task Objective <br />The purpose of these subtasks is to provide design support services that assist in the <br />development of the contract documents of both Phase 1 and Phase 2 design and construction <br />contracts. <br />Subtask 700.1 – PLA/CWA Assistance <br />Objective <br />Assist the City in evaluating the benefit of implementing Project Labor Agreements and <br />Community Workforce Agreements (PLA/CWA) in the Reservoir 3 Replacement Project.
The URL can be used to link to this page
Your browser does not support the video tag.