My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 12/16/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering Inc. 12/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:15 PM
Creation date
3/3/2023 1:19:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
12/16/2022
Council Approval Date
12/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Services for the Replacement of Reservoir 3
Public Works WO Number
UP3739
Tracking Number
0003587
Total Compensation
$2,994,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 7/19/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID Task <br />Mode <br />Task Name Duration Start Finish Predecessors <br />1 Reservoir 3 Design-Bid Build 790 days Tue 1/3/23 Tue 2/10/26 <br />2 NTP 0 days Tue 1/3/23 Tue 1/3/23 <br />3 Kick-Off Meeting/Site Visit 0 days Thu 1/5/23 Thu 1/5/23 2FS+2 days <br />4 Preliminary Design Report (PDR)135 days Mon 1/9/23 Tue 7/18/23 <br />5 Develop Draft PDR 40 days Mon 1/9/23 Fri 3/3/23 3FS+2 days <br />6 City Review of Draft PDR 10 days Mon 3/6/23 Fri 3/17/23 5 <br />7 PDR Review Workshop 0 days Fri 3/17/23 Fri 3/17/23 6FF <br />8 Prepare Final PDR for City <br />Review <br />15 days Mon 3/20/23 Fri 4/7/23 7 <br />9 City Review of Final PDR 5 days Mon 4/10/23 Fri 4/14/23 8 <br />10 Prepare Final PDR 5 days Mon 4/17/23 Fri 4/21/23 9 <br />11 DOH Review for <br />Concurrance of PDR <br />0 days Fri 4/21/23 Fri 4/21/23 10FF <br />12 DOH Review of PDR 60 days Mon 4/24/23 Tue 7/18/23 11 <br />13 Phase 1 Design/Construction 470 days Mon 3/27/23 Thu 1/30/25 <br />14 Design Phase 170 days Mon 3/27/23 Wed <br />11/22/23 <br />15 30% Design Phase 70 days Mon 3/27/23 Wed 7/5/23 <br />16 Geotechnical/Survey/SUE30 days Mon 3/27/23 Fri 5/5/23 7FS+5 days <br />17 Prepare 30% Design <br />Documents <br />30 days Mon 5/8/23 Mon <br />6/19/23 <br />16,9 <br />18 City Review of 30% Design10 days Tue 6/20/23 Mon 7/3/23 17 <br />19 30% Design Workshop 0 days Wed 7/5/23 Wed 7/5/23 18 <br />20 60% Design Phase 40 days Wed 7/19/23 Wed 9/13/23 <br />21 Prepare 60% Design <br />Documents <br />30 days Wed 7/19/23 Tue 8/29/23 19,12 <br />1/3 <br />1/5 <br />3/17 <br />4/21 <br />7/5 <br />Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 <br />2023 2024 2025 2026 <br />Task <br />Split <br />Milestone <br />Summary <br />Project Summary <br />Inactive Task <br />Inactive Milestone <br />Inactive Summary <br />Manual Task <br />Duration-only <br />Manual Summary Rollup <br />Manual Summary <br />Start-only <br />Finish-only <br />External Tasks <br />External Milestone <br />Deadline <br />Progress <br />Manual Progress <br />Page 1 <br />Project: Reservoir 3 Implementa <br />Date: Thu 7/7/22 <br />Reservoir 3 Design-Bid-Build Detail Schedule
The URL can be used to link to this page
Your browser does not support the video tag.