My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 12/16/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering Inc. 12/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 4:15:15 PM
Creation date
3/3/2023 1:19:33 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
12/16/2022
Council Approval Date
12/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Services for the Replacement of Reservoir 3
Public Works WO Number
UP3739
Tracking Number
0003587
Total Compensation
$2,994,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 7/19/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID Task <br />Mode <br />Task Name Duration Start Finish Predecessors <br />22 City Review of 60% Design10 days Wed 8/30/23 Wed 9/13/23 21 <br />23 60% Design Workshop 0 days Wed 9/13/23 Wed 9/13/23 22FF <br />24 90% Design Phase 30 days Thu 9/14/23 Wed <br />10/25/23 <br />25 Prepare 90% Design <br />Documents <br />20 days Thu 9/14/23 Wed <br />10/11/23 <br />23 <br />26 City Review of 90% <br />Design <br />10 days Thu 10/12/23 Wed <br />10/25/23 <br />25 <br />27 90% Design Workshop 0 days Wed <br />10/25/23 <br />Wed <br />10/25/23 <br />26FF <br />28 Prepare Bid Documents 30 days Thu 10/12/23 Wed <br />11/22/23 <br />27 <br />29 DOH Review for <br />Concurrance of Design <br />20 days Thu 10/12/23 Wed <br />11/8/23 <br />25 <br />30 Finalize Bid Documents 10 days Thu 11/9/23 Wed <br />11/22/23 <br />27,29 <br />31 Bid Phase 40 days Mon 11/27/23Tue 1/23/24 <br />32 Advertise for Bid 20 days Mon 11/27/23Fri 12/22/23 30 <br />33 Bid Opening 0 days Fri 12/22/23 Fri 12/22/23 32FF <br />34 Prepare Contract for Council20 days Tue 12/26/23 Tue 1/23/24 33 <br />35 Council Award 0 days Tue 1/23/24 Tue 1/23/24 34 <br />36 Construction Phase 260 days Wed 1/24/24 Thu 1/30/25 <br />37 Route Contracts for Signatures10 days Wed 1/24/24 Tue 2/6/24 35 <br />38 NTP 0 days Tue 2/6/24 Tue 2/6/24 37 <br />39 Shop Drawing Submittals 20 days Wed 2/7/24 Tue 3/5/24 38 <br />40 Piping/Equipment <br />Procurement <br />180 days Wed 3/6/24 Fri 11/15/24 39 <br />41 Yard Piping Construction 30 days Mon 11/18/24Thu 1/2/25 40 <br />42 Site Demolition/Preparation20 days Wed 2/21/24 Wed 3/20/24 43SF,38 <br />9/13 <br />10/25 <br />12/22 <br />1/23 <br />2/6 <br />Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 <br />2023 2024 2025 2026 <br />Task <br />Split <br />Milestone <br />Summary <br />Project Summary <br />Inactive Task <br />Inactive Milestone <br />Inactive Summary <br />Manual Task <br />Duration-only <br />Manual Summary Rollup <br />Manual Summary <br />Start-only <br />Finish-only <br />External Tasks <br />External Milestone <br />Deadline <br />Progress <br />Manual Progress <br />Page 2 <br />Project: Reservoir 3 Implementa <br />Date: Thu 7/7/22 <br />Reservoir 3 Design-Bid-Build Detail Schedule
The URL can be used to link to this page
Your browser does not support the video tag.