FGENERAL NOTES
<br />1. THE CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE AND DETERMINE THE EXACT EXTENT OF
<br />WORK, COORDINATION, DEMOLITION, TEMPORARY CONSTRUCTION, TEMPORARY FACILITIES, ETC.,
<br />NECESSARY TO COMPLETE THE PROJECT AS INDICATED IN THE CONTRACT DOCUMENTS.
<br />2. INTERRUPTIONS OF SERVICES (POWER, WATER, HVAC, ETC.) AND WORK IN OCCUPIED TENANT
<br />SPACES MUST BE SCHEDULED THRU THE BUILDING MANAGER A MINIMUM OF 24 HOURS IN ADVANCE.
<br />ANY INTERRUPTIONS OR CONSTRUCTION WHICH WILL AFFECT NORMAL OPERATION OF THE BUILDING
<br />OR TENANTS MUST BE SCHEDULED, WITH THE BUILDING MANAGER'S APPROVAL, ON AN AFTER-
<br />HOURS BASIS.
<br />3. FURNISH LABOR, MATERIALS, EQUIPMENT, APPARATUS AND APPURTENANCES REQUIRED FOR A
<br />COMPLETE WORKING AND COORDINATED SYSTEM. MATERIALS, EQUIPMENT, APPARATUS, AND
<br />APPURTENANCES SHALL MATCH EXISTING BUILDING STANDARDS IN QUALITY, TYPE AND FINISH,
<br />UNLESS OTHERWISE NOTED.
<br />4. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT. COORDINATE THE EXACT LOCATIONS OF NEW
<br />MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHTING FIXTURES, PIPING, AND
<br />OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE AND MAINTAIN EQUIPMENT
<br />PRIOR TO START OF CONSTRUCTION.
<br />5. COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES. PROVIDE OFFSETS IN
<br />DUCTWORK AND PIPING AS REQUIRED AT NO ADDITIONAL COST TO OWNER.
<br />6. TRADES TO LEAVE 36" CLEARANCE IN FRONT OF MECHANICAL EQUIPMENT ACCESS PANELS FOR
<br />SERVICING.
<br />7. INSTALL DUCTWORK AND PIPING TO ALLOW MINIMUM ACCESS OF 6" ABOVE AND TO THE SIDE OF THE
<br />ELECTRICAL CABLE TRAYS.
<br />8. SUPPORT CONDUIT, PIPING, AND DUCTWORK INDEPENDENTLY. SUPPORTS ARE INDEPENDENT OF
<br />PARTITION AND CEILING SYSTEM SUPPORTS.
<br />9. IN NO INSTANCE SHALL OTHER TRADES HANG OR SUPPORT EQUIPMENT, CEILING WIRES, LIGHT
<br />FIXTURE HANGERS, ETC., FROM HVAC EQUIPMENT, DUCTWORK, OR PIPING.
<br />10, CUTTING, FRAMING, PATCHING, AND PAINTING OF WALL, CEILING, AND FLOOR OPENINGS SHALL BE BY
<br />MCKINSTRY. THIS INCLUDES OPENINGS THROUGH AREA SEPARATION WALLS
<br />It OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT
<br />PREVIOUSLY COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC.
<br />12. REFER TO STRUCTURAL DRAWINGS FOR EQUIPMENT SUPPORTS. REFER TO THE SPECIFICATIONS
<br />MATRIX FOR ADDITIONAL SEISMIC INFORMATION.
<br />13, UNIT WEIGHTS AND LOCATIONS HAVE BEEN COORDINATED TO DETERMINE BUILDING STRUCTURAL
<br />ADEQUACY. IF IT IS NECESSARY TO RELOCATE A UNIT, NOTIFY MCKINSTRY ENGINEERING
<br />DEPARTMENT FOR RE -COORDINATION.
<br />14. PROVIDE SEISMIC RESTRAINTS AND ANCHORAGE PER SMACNA AND THE INTERNATIONAL BUILDING
<br />CODE FOR DUCTWORK, PIPING, AND EQUIPMENT.
<br />15. CONCRETE EQUIPMENT CURBS, FLASHINGS, SLEEPERS, CONCRETE STATIONS, EMBED PLATES,
<br />PIPING RAT SLABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE SHOWN FOR APPROXIMATE
<br />LOCATION AND SIZE AND WILL BE PROVIDED BY McKINSTRY. WHERE PROVIDED, REFER TO
<br />STRUCTURAL INFO FOR ADDITIONAL DETAILS.
<br />16. CUTTING AND PATCHING OF ROOF OPENINGS SHALL BE BY McKINSTRY.
<br />17. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF
<br />EQUIPMENT FURNISHED BY THE OWNER OR OTHERS.
<br />18. PROVIDE ACCESS DOORS IN WALLS AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED
<br />MECHANICAL OR PLUMBING EQUIPMENT, VALVES, CONTROLS, AND OTHER DEVICES.
<br />19. PROVIDE PIPE, EQUIPMENT, AND VALVE LABELING FOR IDENTIFICATION. MATCH OWNERS EXISTING
<br />LABELING SCHEME IF APPLICABLE.
<br />20. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF MECHANICAL WORK TO PROVIDE
<br />CLEARANCES OVER LIGHTING FIXTURES FOR REMOVAL AND REPLACEMENT,
<br />21. PROVIDE FIRE SAFE PENETRATIONS OF FIRE RATED CONSTRUCTION.
<br />22. MINIMUM VENTILATION QUANTITIES SHALL COMPLY WITH OR EXCEED THE 2015 INTERNATIONAL
<br />MECHANICAL CODE WITH THE WASHINGTON STATE AMENDMENTS.
<br />23. VARIABLE PITCH SHEAVES TO BE USED FOR SYSTEM BALANCING. REPLACE WITH FIXED PITCH
<br />SHEAVES FOR NORMAL OPERATION.
<br />SUBMITTAL NOTES:
<br />1. PROVIDE A HVAC/PLUMBING EQUIPMENT AND COMPONENT SUBMITTAL PACKAGE. INCLUDE IN THE
<br />PACKAGE SUBMITTALS FOR ITEMS INCLUDED ON THE SCHEDULE ANDIOR SPECIFICATION SHEETS.
<br />ALSO INCLUDE SUBMITTALS FOR VALVES, GAUGES, AND INSTRUMENTATION. PIECEMEAL SUBMITTALS
<br />ARE NOT ACCEPTABLE.
<br />2. PROVIDE CONTRACTOR PREPARED SHOP DRAWINGS OF CONTRACTOR FABRICATED SHEET METAL
<br />SYSTEMS. DRAWINGS SHALL BE PREPARED AT 1/4' SCALE USING COMPUTER AIDED DESIGN (CAD)
<br />SOFTWARE UNLESS INDICATED OTHERWISE. DRAWINGS SHALL SHOW EXACT LOCATION OF
<br />EQUIPMENT AND DUCTWORK, EACH SECTION OF SHOP FABRICATED DUCT AND LOCATION OF FIELD
<br />JOINTS, SUPPORTS, AND BUILDING ATTACHMENTS, AND SEISMIC RESTRAINT LOCATIONS.
<br />3. PRIOR TO FLUE SHOP DRAWING SUBMITTAL, THE CONTRACTOR SHALL COORDINATE AND RECEIVE
<br />APPROVAL FROM THE BOILER MANUFACTURER ON THE FINAL DETAILED FLUE ROUTING.
<br />4. PROVIDE CONTROLS SUBMITTAL PACKAGE. INCLUDE IN THE PACKAGE SUBMITTALS FOR SEQUENCE
<br />OF OPERATIONS, SYSTEM DIAGRAMS, ARCHITECTURE DIAGRAMS, PLANS, PLUS EQUIPMENT AND
<br />COMPONENTS.
<br />5. THE PIPING CONTRACTOR SHALL PROVIDE FULL SUBMITTALS OF PIPING AND DEVICES FOR
<br />APPROVAL PRIOR TO PURCHASE AND INSTALLATION.
<br />& THE CONTRACTOR SHALL COORDINATE APPROVAL OF BOILER VENTING LAYOUT AND SIZING BY
<br />BOILER MANUFACTURER PRIOR TO PURCHASE AND INSTALLATION.
<br />7. SUBMITTALS FOR MECHANICAL EQUIPMENT REQUIRING LINE -VOLTAGE POWER SHALL INCLUDE THE
<br />FOLLOWING ITEMS: VOLTAGE, PHASE, HORSEPOWER, FLA (FULL LOAD AMPS), MCA (MINIMUM CIRCUIT
<br />AMPACITY), MOCP (MAXIMUM OVERCURRENT PROTECTIVE DEVICE), AND SCCR (SHORT CIRCUIT
<br />CURRENT RATING). SUBMITTALS SHALL ALSO INCLUDE AN ELECTRICAL WIRING SCHEMATIC, UNLESS
<br />THE EQUIPMENT CONSISTS SOLELY OF A THREE-PHASE INDUCTION MOTOR.
<br />CONTROLS SYSTEM AND GRAPHIC NOTES:
<br />1. MAIN CONTROL PORTAL: ONE COMMON SCREEN PER BUILDING THAT DISPLAYS AND PROVIDES THE
<br />ABILITY TO MANIPULATE THE ASPECTS OF SCHEDULING AND SET POINTS FOR THE FACILITY ON A
<br />GLOBAL LEVEL SHALL BE INCORPORATED INTO THE CONTROLS DELIVERABLE.
<br />2. GRAPHICS SHALL MIRROR THE BUILDING FLOOR PLANS, WITH IDENTIFIABLE ROOM AND
<br />EQUIPMENT/SYSTEM LOCATIONS.
<br />3. GRAPHICS SHALL BE LINKABLE TO SPECIFIC EQUIPMENT, SYSTEM POINTS AND OPERATING
<br />PARAMETERS WHICH ALLOW FOR'ONE CLICK' DIAGNOSIS WHEN ISSUES ARE IDENTIFIED.
<br />4. GRAPHICS SHALL HAVE DROP DOWN WINDOWS LINKING REFERENCES TO THE CONTROL DRAWINGS,
<br />SEQUENCES OF OPERATION, CONTROL PARAMETERS AND SPECIFIC EQUIPMENTISYSTEM
<br />INFORMATION.
<br />5. THE CONTROL CONTRACTOR SHALL COORDINATE WITH OWNER ON THE PROPOSED GRAPHICS
<br />LAYOUT PRIOR TO SUBMITTALS.
<br />6. CONTROLS CONTRACTOR SHALL REFERENCE MCKINSTRY CONTROL PROVIDER PERFORMANCE
<br />STANDARD FOR PROJECT EXPECTATIONS AND SHALL WORK WITH COMMISSIONING AGENT FOR
<br />ADHERENCE.
<br />7. REFERENCE THE SEQUENCE OF OPERATION CONTAINED WITHIN THESE CONSTRUCTION DOCUMENTS
<br />FOR ADDITIONAL CONTROLS REQUIREMENTS.
<br />SHEET METAL NOTES:
<br />1. PROVIDE DUCTWORK IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS,
<br />METAL AND FLEXIBLE, SECOND EDITION, 2005 (SMACNA HVACDCS).
<br />2. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.
<br />3. PROVIDE A MANUAL VOLUME DAMPER FOR EACH SUPPLY, RETURN, AND EXHAUST OPENING EXCEPT
<br />WHERE PROHIBITED BY CODE. INSTALL AS FAR FROM INLET OR OUTLET AS POSSIBLE.
<br />4. PROVIDE FLEXIBLE CONNECTION AT EACH DUCT CONNECTION TO FANS, AIR HANDLING UNITS, AND
<br />SIMILAR EQUIPMENT. DO NOT INSTALL ON EQUIPMENT LOCATED IN FIRE RATED CORRIDOR CEILING.
<br />5. DUCT SMOKE DETECTORS: LOCATE DUCT SMOKE DETECTORS IN ACCORDANCE WITH
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE LOCATION REQUIREMENTS WITH
<br />ELECTRICAL.
<br />ELECTRICAL COORDINATION NOTES:
<br />1. WHERE INDICATED ON THE EQUIPMENT SCHEDULES, THE EQUIPMENT COMES COMPLETE FROM THE
<br />FACTORY WITH MOTOR CONTROLS AS REQUIRED. ELECTRICIAN SHALL PROVIDE SERVICE AND
<br />DISCONNECT PER CODE, AND POWER WIRING, INCLUDING CONNECTING TO EQUIPMENT.
<br />2. WHERE INDICATED ON EQUIPMENT SCHEDULES, THE EQUIPMENT REQUIRES FIELD INSTALLED MOTOR
<br />STARTERS. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL MOTOR STARTERS (OR
<br />CONTACTORS WHERE INDICATED). PROVIDE SERVICE AND DISCONNECT PER CODE, AND POWER
<br />WIRING, INCLUDING CONNECTING TO EQUIPMENT. HOLDING COIL CIRCUIT SHALL BE POWERED BY
<br />ELECTRICAL CONTACTOR (120V UNLESS INDICATED OTHERWISE). STARTERS SHALL BE PROVIDED
<br />WITH H-O-A SWITCH, EXCEPT SMOKE CONTROL FANS SHALL NOT HAVE HAND OFF POSITIONS ON THE
<br />STARTERS AS NOTED ABOVE.
<br />3. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF THE MECHANICAL
<br />EQUIPMENT, UNLESS OTHERWISE NOTED.
<br />DEMOLITION NOTES:
<br />1. DEMOLITION DRAWINGS ARE INCLUDED TO GIVE A COMMON BASIS FOR BIDDING AND MAY NOT SHOW
<br />EVERY ITEM TO BE DEMOLISHED. VISIT SITE TO DETERMINE AND COORDINATE THE EXACT EXTENT
<br />OF DEMOLITION TO FACEPLATE WORK INDICATED BY THE CONTRACT DOCUMENTS, REWORK
<br />EXISTING TERMINATIONS, CONNECTIONS, ETC., TO ACCEPT NEW WORK. PRIOR TO START OF ANY
<br />DEMO WORK, VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR
<br />RESOLUTION.
<br />2. REMOVE EXISTING HVAC EQUIPMENT AS INDICATED, INCLUDING ASSOCIATED PIPING, CONTROL
<br />SYSTEMS, AND APPURTENANCES.
<br />3. REMOVE EXISTING DUCTWORK AS INDICATED. CAP EXISTING OPENINGS NOT BEING REUSED.
<br />4. REMOVE EXISTING PIPING SERVING ITEMS TO BE REMOVED. CAP OR PLUG BRANCH LINES NOT BEING
<br />REUSED.
<br />5. GIVE OWNER THE OPPORTUNITY TO RETAIN ANY REMOVED ITEMS THAT ARE NOT BEING REUSED.
<br />DISPOSE OF OTHER ITEMS LEGALLY.
<br />6. CLEAN AND REFURBISH ITEMS INDICATED TO BE REMOVED AND REUSED PRIOR TO REUSE.
<br />PIPING NOTES:
<br />1. BACKFLOW DEVICES, CROSS CONTROL DEVICES, VACUUM BREAKER AND DOUBLE CHECK VALVES TO
<br />BE A TYPE APPROVED BY THE STATE OF WASHINGTON HEALTH SERVICES DIVISION.
<br />2. INSTALL AIR VENTS AT HIGH POINTS IN HYDRONIC PIPING. INSTALL DRAIN VALVES IN LOW POINTS IN
<br />HYDRONIC PIPING.
<br />3. PROVIDE FLANGES OR UNIONS AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL
<br />VALVES, AND OTHER COMPONENTS TO ALLOW FOR MAINTENANCE.
<br />4. PROVIDE REDUCERS AS REQUIRED FROM LINE PIPE SIZE TO EQUIPMENT, TRAP, COIL, AND CONTROL
<br />VALVE CONNECTION SIZES.
<br />5. PROVIDE OFFSETS FOR BRANCH LINES TO EQUIPMENT TO ALLOW FOR SERVICE AND MAINTENANCE
<br />OF EQUIPMENT.
<br />6. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR PIPE MATERIALS.
<br />7. PIPE SUPPLY WATER LINES TO BOTTOM OF COILS LEAVING AIR SIDE TO OBTAIN COUNTERFLOW
<br />ARRANGEMENT.
<br />B. PROVIDE PRESSURE AND TEMPERATURE TEST PORTS AT SUPPLY AND RETURN PIPING
<br />CONNECTIONS TO EQUIPMENT.
<br />9. SIZE BALANCINGIMEASURING VALVES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. DO
<br />NOT PROVIDE VALVES LARGER THAN LINE SIZE.
<br />10. EXPANSION TANK PRE -CHARGE SHALL BE TO 15PSI.
<br />WASHINGTON STATE ENERGY CODE NOTES:
<br />1. PROVIDE COMMISSIONING PLAN IN ACCORDANCE WITH 2O18 WASHINGTON STATE ENERGY CODE
<br />SECTION C408.
<br />2. PROVIDE SYSTEMS TESTING AND BALANCING IN ACCORDANCE WITH 2O18 WASHINGTON STATE
<br />ENERGY CODE SECTION C408.2.2.
<br />3. PROVIDE SYSTEMS, EQUIPMENT, AND CONTROLS FUNCTIONAL TESTING IN ACCORDANCE WITH 2O18
<br />WASHINGTON STATE ENERGY CODE SECTIONS G408.2.3, C408.3.1, C408.4.1, C408.5.
<br />4. PROVIDE SUPPORTING DOCUMENTATION IN ACCORDANCE WITH 2O18 WASHINGTON STATE ENERGY
<br />CODE C103.6 INCLUDING OPERATION AND MAINTENANCE MANUALS, HVAC CONTROL SYSTEM
<br />MAINTENANCE AND CALIBRATION INFORMATION, HVAC CONTROL SEQUENCE OF OPERATIONS,
<br />COMMISSIONING REPORT, AND RECORD DRAWINGS.
<br />5. PROVIDE OWNER TRAINING FOR NECESSARY SYSTEMS PER 2018 WASHINGTON STATE ENERGY CODE
<br />SECTION C103.6.4.
<br />6. PROVIDE COMMISSIONING COMPLIANCE FORM IN ACCORDANCE WITH 2O18 WASHINGTON STATE
<br />ENERGY CODE SECTION C408.1.3.
<br />7. MOTORS SHALL COMPLY WITH SECTION C403.2.13 OF THE 2018 WASHINGTON STATE ENERGY
<br />CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING
<br />SET.
<br />B. SYSTEMS SHALL BE INSULATED AS PRESCRIBED IN SECTIONS C403.2.8, C403.2.9 AND C404.6 OF THE
<br />2018 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING
<br />SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET.
<br />9. HVAC EQUIPMENT SHALL NOT BE SIZED LARGER THAN THE NEXT LARGEST SIZE BASED ON LOAD
<br />CALCULATION, WSEC 0403.2.2.
<br />10, OCCUPIED SPACES ARE MECHANICALLY VENTILATED. SYSTEMS ARE DESIGNED TO PROVIDE MINIMUM
<br />OUTSIDE AIR PER MECHANICAL CODE AND SHALL NOT EXCEED 150% CALCULATED VALUE, WSEC
<br />403.2.6 & 403.2.11.4.
<br />11. BALANCE SYSTEMS TO WITHIN TOLERANCES SPECIFIED. FIRST BALANCE TO MINIMIZE THROTTLING
<br />LOSSES THEN TO MEET DESIGN FLOW, WSEC 408.2.2.
<br />1Z PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER PER WSEC C103.6.
<br />13. PROVIDE MAINTENANCE MANUALS FOR ALL MECHANICAL EQUIPMENT, WSEC C103.6.
<br />14. PROVIDE OWNERS OPERATING PERSONNEL TRAINING FOR MECHANICAL EQUIPMENT, WSEC C103.6.
<br />15. PROVIDE WSEC COMPLIANCE FORMS AND CALCULATIONS, WSEC C103.6.
<br />RESPONSIBILITY MATRIX - HORIZON ELEMENTARY
<br />SCHOOL
<br />EQUIPMENT
<br />FURNISH
<br />RECEIVE
<br />INSTALL
<br />WIRE
<br />CONTROLS
<br />START-UP
<br />VERTICAL AIR HANDLING UNITS
<br />McK
<br />MC
<br />MC
<br />EC
<br />CC
<br />MC
<br />AIR HANDLING UNIT CUSTOM MIXING BOXES
<br />MC
<br />MC
<br />MC
<br />-
<br />-
<br />-
<br />FANS
<br />MCK
<br />MC
<br />MC
<br />EC
<br />CC
<br />MC
<br />AHU FAN REFURBISHMENT
<br />McK
<br />MCK
<br />M&
<br />Md(
<br />DIFFUSERSIGRILLES
<br />MC
<br />MC
<br />MC
<br />WALUt00F OPENINGS
<br />McK (1)
<br />SHEETROCKI PLASTER / CEILINGS I REPAIR ETC.
<br />McK
<br />MC
<br />MC
<br />SYSTEM CLEAN AND FLUSH
<br />MC
<br />SYSTEM INITIAL CHEMICALTREATMENT
<br />MC
<br />MC
<br />MC
<br />MC
<br />INSULATING PIPING, DUCTWORK, AND EQUIPMENT
<br />MC
<br />MC
<br />MC
<br />DUCTWORK AND ASSOCIATED APPURTENANCES
<br />MC
<br />MC
<br />MC
<br />PIPING, PLUMBING, ASSOCIATED APPURTENANCES
<br />MC
<br />MC
<br />MC
<br />CONTROL DAMPERS (MINUS ACTUATOR)
<br />MC
<br />MC
<br />MC
<br />MC
<br />CONTROL DAMPER ACTUATORS
<br />CC
<br />CC
<br />CC
<br />CC
<br />CC
<br />TEMPERATURE AND PRESSURE CONTROL SENSORS
<br />CC
<br />CC
<br />CC
<br />CC
<br />CC
<br />CO2SENSORS
<br />CC
<br />CC
<br />CC
<br />CC
<br />CC
<br />DEMO OF EXISTING VERTICAL AHUS AND APPURTENANCES(MIXING BOXES,
<br />DISCHARGE DUCTWORK, COILS, ETC.)
<br />-
<br />-
<br />MC
<br />EC
<br />CC
<br />-
<br />DEMO OF EXISTING FANS
<br />MC
<br />EC
<br />CC
<br />DEMO OF EXISTING HOT WATER COILS
<br />MC
<br />CC
<br />DEMO OF INSULATING PIPING, DUCTWORK, AND EQUIPMENT
<br />MC
<br />DEMO DUCTWORK AND ASSOCIATED APPURTENANCES
<br />MC
<br />DEMO OF PIPING,PLUMBING, ASSOCIATED APPURTENANCES
<br />MC
<br />-
<br />DEMO OF EXISTING LINE VOLTAGE CONDUIT/BOXES
<br />-
<br />EC
<br />-
<br />DEMO OF EXISTING MOTORIZED DAMPERS
<br />MC
<br />CC
<br />DEMOLITION OF EXISTING SENSORS
<br />-
<br />-
<br />-
<br />-
<br />CC
<br />-
<br />DEMOLITION OF EXISTING CONTROL CONDUITANIRE
<br />CC
<br />-
<br />LSVERIFICATION
<br />CC/CA
<br />TESNG/ADJUSTINGBALANCING
<br />CA
<br />�CONTRO
<br />COMMISSIONINGIFUNCTIONAL PERFORMANCE TESTING
<br />CA
<br />TRAINING
<br />McK
<br />NOTES:
<br />1. BASED ON DIRECTION FROM MC
<br />McK-McKINSTRY
<br />CA- COMMISSIONING AGENT
<br />MC- MECHANICAL CONTRACTOR
<br />EC - ELECTRICAL CONTRACTOR
<br />CC- CONTROLS CONTRACTOR
<br />HVAC BASIS OF DESIGN - HORIZON ELEMENTARY SCHOOL
<br />ITEM#
<br />DATELASTMODIFIED
<br />SYSTEM
<br />CRITERIA
<br />CRITERIASOURCE
<br />CODE BASIS FOR PROJECT
<br />1-1
<br />4/1512022
<br />CODE
<br />2018 INTERNATIONAL BUILDING CODE WITH WA STATE AMENDMENTS
<br />1-2
<br />4/15/2022
<br />CODE
<br />2018 INTERNATIONAL EXISTING BUILDING CODE WITH WA STATE AMENDMENTS
<br />1-3
<br />4/15/2022
<br />CODE
<br />2018 INTERNATIONAL MECHANICAL CODE WITH WA STATE AMENDMENTS
<br />id
<br />4115/2022
<br />CODE
<br />2018 NATIONAL FUEL GAS CODE (NFPA 54)
<br />1-5
<br />4/1512022
<br />CODE
<br />2018 INTERNATIONAL FUEL GAS CODE WITH WA STATE AMENDMENTS
<br />MUKILTEO PERMITTING
<br />DEPARTMENT
<br />1-6
<br />4/15/2022
<br />CODE
<br />2018 INTERNATIONAL FIRE CODE ENFORCED BY LOCAL JURISDICTION
<br />1-7
<br />4/1512022
<br />CODE
<br />2018 UNIFORM PLUMBING CODE ENFORCED BY LOCAL JURISDICTION
<br />1-8
<br />4/1512022
<br />CODE
<br />2018 WASHINGTON STATE ENERGY CODE ENFORCED BY LOCAL JURISDICTION
<br />1-9
<br />4/1512022
<br />CODE
<br />2020 NATIONAL ELECTRICAL CODE (NFPA 70) ENFORCED BY LOCAL JURISDICTION
<br />1-10
<br />4/1512022
<br />STANDARD
<br />12019 ASHRAE 62.1 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
<br />1-11
<br />4/15/2022
<br />STANDARD 77TN17ASHRAEHANMOK
<br />FUNDAMENTALS
<br />ASHRAE
<br />1-12
<br />4/1512022
<br />OPR
<br />MUKILTEO SO OWNER PROJECT REQUIREMENTS
<br />OWNER
<br />BASIS FOR LOAD CALCULATIONS
<br />OFFICE BUILDING OPERATING HOURS:5:DO AM-2 30 PM, SAT: CLOSED, SUN -HOLD: CLOSED
<br />2018 WSEC RECOMMENDED
<br />2-1
<br />4/1512022
<br />OPERATING HOURS
<br />OUTDOOR DESIGN TEMPS
<br />CLASSROOM BUILDINGS OPERATING HOURS: 5:00 AM-2:30 PM, SAT: CLOSED, SUN -HOLD: CLOSED
<br />(PAINE FIELD)
<br />OUTDOOR DESIGN
<br />2018 WSEC RECOMMENDED
<br />2-2
<br />4/15/2022
<br />TEMPERATURE
<br />WINTER OSA DESIGN TEMP =21'F DB
<br />OUTDOOR DESIGN TEMPS
<br />(PAINE FIELD)
<br />25
<br />4/15/2022
<br />INDOOR HEATING
<br />CONDITIONED SPACES =727 DB, 50% RELATIVE HUMIDITY
<br />BASIS OF DESIGN/2018 WSEC
<br />DESIGN CRITERIA
<br />UNCONDITIONED SPACES = 65'F DB, 50% RELATIVE HUMIDITY
<br />G302.1
<br />CLASSROOMS (CHILDREN 5-8 YEARS OLD): 30 PEOPLE I TOM SF
<br />2-4
<br />4/1512022
<br />OCCUPANT DENSITY
<br />CLASSROOMS (CHILDREN OVER 8 YEARS OLD): 30 PEOPLE / 1000 SF
<br />BASIS OF DESIGN 12018 WSMC,
<br />CONFERENCE: 50 PEOPLE / 1000 SF
<br />CHP 4, TBL 403.3.1.1
<br />OFFICES: 3 PEOPLE / 1000 SF
<br />CLASSROOMS: 10 CFM/PERSON AND 0.12 CFM/SF
<br />2018 WSMC,
<br />2-5
<br />4/15/2022
<br />4/15/2022
<br />VENTILATION RATES
<br />OFFICES: 5CFM/ PERSON AND 0.O6CFM/SF
<br />CH 403.3.1.1
<br />CONFERENCE: 5 CFM/PERSON AND 0.06 CFM/SF
<br />25
<br />4/1512022
<br />EXHAUST RATES
<br />BATHROOMS: MINIMUM OF 50 CFM PER FIXTURE
<br />2018 WSMC,
<br />JANITOR CLOSETS: MINIMUM OF 1 CFMISF
<br />CHIP 4, TBL 403.3.1.1
<br />BASIS FOR BUILDING ENVELOPE USED IN HVAC LOADS
<br />3-1
<br />4/15/2022
<br />INFILTRATION
<br />ALL SPACES: 0.35 CFM PER SQUARE FOOT OF EXTERIOR WALL AREA
<br />MCKINSTRY RECOMMENDATION
<br />SLOPED ROOF: U-VALUE=0.031 (METAL ROOFING, RJ0 RIGID INSULATION, 30 # BUILDING FELT, PLYWOOD SHEATHING, T&G
<br />ARCH DRAWINGS DATED 0411011989,
<br />3-2
<br />4/15/2022
<br />ROOF
<br />DECKING, GLUE ON ACOUSTICAL TILE WI METAL EDGE)
<br />INSULATION VALUE SOURCE
<br />(2017 ASHRAE FUNDAMENTALS)
<br />EXTERIOR WALLS (ALL BUILDINGS): U-VALUE=0.092 (MASONARY VENEER, 15# BUILDING FELT, 112" PLYWOOD SHEATHING, 6' METAL
<br />ARCH DRAWINGS DATED 04110/1989,
<br />3-3
<br />4I15/2022
<br />WALL
<br />STUDS, R-19 INSULATION, 5/8 GWB)
<br />(2INSULATION
<br />E FUNDAMENTALS)
<br />ARCH DRAWINGS DATED 0411011989,
<br />3-4
<br />411512022
<br />WINDOW
<br />VERTICAL GLAZING: U-VALUE=1.20 (SINGLE PANE, CLEAR, ALUMINUM FRAME, NON -THERMALLY BROKEN, FIXED GLAZING)
<br />INSULATION VALUE SOURCE
<br />(2017 ASHRAE FUNDAMENTALS)
<br />ARCH DRAWINGS DATED 04110/1989,
<br />3-5
<br />4/15/2022
<br />SLAB ON GRADE
<br />SLAB: U-VALUE=0.58 (UNHEATED, 2 FT VERTICAL, R5 INSULATION)
<br />INSULATION VALUE SOURCE
<br />(2017 ASHRAE FUNDAMENTALS)
<br />BASE SCOPE OF WORK - EXISTING CONDITIONS
<br />TYPICAL CLASSROOM VERTICAL AIR HANDLER CONTAINS A HEATING HOT WATER COIL, A FAN, AND A FILTER. UNDER EACH
<br />VERTICAL AHU IS A MIXING BOX WITH AN OUTSIDE AIR (OA) DAMPER AND A RETURN AIR (RA) DAMPER. THE HEATING HOT WATER
<br />TYPICAL CLASSROOM
<br />COILS IS GENERALLY CONTROLLED WITH A TWO WAY CONTROL VALVE. HOWEVER SOME ARE CONTROLLED BY A 3 WAY CONTROL
<br />4-1
<br />4/1512022
<br />VERTICALAIR
<br />VALVE FOR SUFFICIENT HYDRONIC HEATING SYSTEM BYPASS. SOME VERTICAL AHUS HAVE DISCHARGE DUCTWORK WHICH
<br />EXISTING SYSTEM
<br />HANDLING UNITS
<br />SUPPLIES DIFFUSERS WITHIN THE ROOM; HOWEVER A LARGE PORTION OF UNITS DISCHARGE THROUGH TWO DIFFUSERS AT THE
<br />TOP OF THE CLOSET. RETURN ENTERS VIA GRILLE ON THE BOTTOM OF THE CLOSET. ORIGINAL UNITS WERE ALL CAPABLE OF
<br />100% ECONOMIZER MODE WHEN FREE COOLING IS AVAILABLE. ALL UNITS ARE BEYOND THEIR USEFUL LIFE.
<br />BUILDING D COMMON
<br />THERE ARE 4 STORAGE CLOSETS OFF OF THE HALLWAY IN BUILDING D, EACH WITH A VERTICALAIR HANDLER WHICH SERVES THE
<br />4-2
<br />4/15/2022
<br />AREA VERTICAL AIR
<br />SURROUNDING HALLAYS, RESTROOMS, AND JANITORISTORAGE CLOSETS. THESE UNITS HAVE DUCTED SUPPLY, DUCTED RETURN,
<br />EXISTING SYSTEM
<br />HANDLING UNITS
<br />AND DUCTED CA THESE UNITS ARE OTHERWISE THE SAME AS THE TYPICAL UNIT. ORIGINAL UNITS WERE ALL CAPABLE OF 100%
<br />ECONOMIZER MODE WHEN FREE COOLING IS AVAILABLE.
<br />THERE ARE SEVERAL INLINE EXHAUST FANS SERVING THE VARIOUS BUILDINGS. EF-B1 SERVES THE NURSES OFFICE IN BUILDING
<br />4-3
<br />4/15/2022
<br />EXHAUST FANS
<br />B, EF-132 SERVES THE RESTROOMS AND JANITOR CLOSET/MECHANICAL SPACE IN BUILDING B, EF-D1 SERVES THE RESTROOMS
<br />EXISTING SYSTEM
<br />AND JANITORISTORAGE CLOSETS IN BUILDING D AND EF-Cl SERVES THE RESTROOMS AND JANITOR CLOSET IN BUILDING C. ALL
<br />OF THESE EXHAUST FANS ARE PAST THEIR USEFUL LIFE. ALL OF THESE EXHAUST FANS RUN CONTINUOUSLY.
<br />BUILDING B SUPPLY AIR IS SERVED BY TWO LARGE AIR HANDLERS, AHU-B3 AND AHU-B4. AHU-83 SERVES THE LIBRARY AND
<br />4-4
<br />4I15I2022
<br />BUILDING B LARGE
<br />ADJOINING SPACES, WHILE AHU-B4 SERVES THE OFFICES AND ADJOINING SPACES. THERE ARE HEATING HOT WATER COILS
<br />EXISTING SYSTEM
<br />AHUS
<br />LOCATED THROUGHOUT THE BUILDING TO SERVE ALL THE VARIOUS ZONES INDIVIDUALLY. RETURN AIR FOR AHU-B4 AND RELIEF
<br />AIR FOR THE BUILDING ARE SERVED BY RF-B1.
<br />BASE SCOPE OF WORK -NEW WORK
<br />NEW VERTICAL AHUS TO BE INSTALLED IN SAME LOCATION AS PREVIOUS. UNITS TO BE RE -CONNECTED TO ALL DUCTWORK AND
<br />PIPING. NEW TWO-WAY CONTROL VALVE TO BE PROVIDED. UNIT DISCHARGE TO CONNECT TO EXISTING SUPPLY AIR DUCTWORK
<br />VERTICALAIR
<br />WHERE EXISTING. WHERE NO SUPPLY AIR DUCTWORK EXISTS, NEW DUCTWORK TO BE ROUTED ABOVE CEILING TO NEW
<br />5-1
<br />4/1512022
<br />HANDLERS
<br />DIFFUSERS IN ACT CEILING. NEW UNITS ARE TO HAVE MERV 13 FILTERS, EC MOTORS, AND BE CAPABLE OF 100% ECONOMIZER
<br />PROPOSED DESIGN
<br />MODE WHEN FREE COOLING IS AVAILABLE. UNITS TO BE CAPABLE OF PROVIDING 85F SUPPLY AIR WITH ENTERING WATER
<br />TEMPERATURE OF 15OF AT DESIGN CONDITIONS. EACH UNIT WILL HAVE A FABRICATED PLENUM BOX AND 4" FILTER BOX
<br />CONSTRUCTED TO SUPPORT THE VERTICAL AIR HANDLER AND ALLOW FOR T SOUND LINING.
<br />VERTICAL AHU
<br />EACH CLASSROOM VERTICAL AHU SHALL BE PROVIDED CUSTOM PLENUM MIXING BOX WITH 2" SOUND LINING FOR ACOUSTICAL
<br />5-2
<br />4/15/2022
<br />ACOUSTICAL
<br />MITIGATION AND 1" SOUND LINING IN THE DISTRIBUTION DUCT. LARGER UNITS ARE TO HAVE 2" SOUND LINING ON CLOSET
<br />PROPOSED DESIGN
<br />REQUIREMENTS
<br />INTERIOR FACE TO MINIMIZE RADIATIVE NOISE.
<br />UNITS TO BE CONTROLED BY BMS. CONTROLS CONTRACTOR TO PROVIDE MOTORIZED MODULATING CONTROL VALVES AND
<br />5-3
<br />411512022
<br />VERTICAL AHU
<br />ELECTRIC MODULATING ACTUATORS FOR ALL HYDRONIC HEATING COILS AND MOTORIZED DAMPERS. PROVIDE SPACE
<br />PROPOSED DESIGN
<br />CONTROLS
<br />THERMOSTATS WHERE SHOWN ON DRAWINGS TO MONITOR TEMPERATURE AND UNIT OPERATION. PROVIDE HARDWARE,
<br />SOFTWARE, AND PROGRAMMING FOR ALL EQUIPMENT LISTED AS DESCRIBED IN SEQUENCE OF OPERATION.
<br />5-4
<br />4/15/2022
<br />BUILDING B LARGE
<br />EXISTING AHU FANS TO REMAIN AND BE REFURBISHED AS NEEDED. REPLACE MOTORS, SHAFTS, BEARINGS, BELTS AND SHEAVES.
<br />PROPOSED DESIGN
<br />AHUS
<br />CLEAN AND BALANCE FAN WHEEL.
<br />5-5
<br />4/15/2022
<br />HEATING HOT WATER
<br />NEW HEATING HOT WATER COILS TO BE INSTALLED IN LOCATION OF THE PREVIOUS. NEW TWO-WAY CONTROL VALVES TO BE
<br />PROPOSED DESIGN
<br />COILS
<br />PROVIDED. RECONNECT EXISTING CONTROLS.
<br />5-6
<br />4/15/2022
<br />EXHAUST FANS
<br />NEW INLINE EXHAUST FANS TO BE INSTALLED IN LOCATION OF THE PREVIOUS. NEW FANS TO RUN CONTINUOUSLY WHEN
<br />PROPOSED DESIGN
<br />BUILDING IS IN OCCUPIED MODE.
<br />5-7
<br />4/1512022
<br />RELIEF FAN
<br />NEW INLINE RELIEF FAN TO BE INSTALLED IN LOCATION OF THE PREVIOUS. NEW MOTORIZED DAMPER TO BE PROVIDED. UNIT
<br />PROPOSED DESIGN
<br />CONTROL BY BMS TO TRACK AHU OUTDOOR AIR DAMPER.
<br />aieitry
<br />fOf Your Building
<br />McKINSTRY Co, LLC
<br />SEATTLE:
<br />5005 3RD AVENUE S
<br />PO BOX 24567
<br />SEATTLE, WA 98124
<br />1-800-669-6223
<br />www.mckinstrv.com
<br />PROJECT:
<br />MUKILTEO SD
<br />PHASE 10 HVAC
<br />IMPROVEMENTS
<br />- HORIZON ES
<br />222 W CASINO RD
<br />EVERETT, WA 98204
<br />CONSULTANTS:
<br />ISSUE:
<br />PERMIT SET
<br />05/06/2022
<br />REGISTRATION:
<br />�R pF�WA�Z'stb
<br />s��Q� f�ca�eA
<br />52771 Q
<br />Pol �E'GISTS
<br />G
<br />`rS10NAL
<br />ISSUES
<br />SR ENGINEER:
<br />L. HESS
<br />DRAWN BY:
<br />M. SAFONOV N. HOBURG A. PASSAS
<br />QC BY:
<br />L. HESS
<br />JOB NO:
<br />205557-ON
<br />ISSUED ON:
<br />0510612022
<br />SHEET TITLE:
<br />MECHANICAL
<br />GENERAL NOTES, BOD,
<br />& RESPONSIBILITY
<br />MATRIX
<br />SHEET NUMBER:
<br />M-002