FGENERAL NOTES <br />1. THE CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE AND DETERMINE THE EXACT EXTENT OF <br />WORK, COORDINATION, DEMOLITION, TEMPORARY CONSTRUCTION, TEMPORARY FACILITIES, ETC., <br />NECESSARY TO COMPLETE THE PROJECT AS INDICATED IN THE CONTRACT DOCUMENTS. <br />2. INTERRUPTIONS OF SERVICES (POWER, WATER, HVAC, ETC.) AND WORK IN OCCUPIED TENANT <br />SPACES MUST BE SCHEDULED THRU THE BUILDING MANAGER A MINIMUM OF 24 HOURS IN ADVANCE. <br />ANY INTERRUPTIONS OR CONSTRUCTION WHICH WILL AFFECT NORMAL OPERATION OF THE BUILDING <br />OR TENANTS MUST BE SCHEDULED, WITH THE BUILDING MANAGER'S APPROVAL, ON AN AFTER- <br />HOURS BASIS. <br />3. FURNISH LABOR, MATERIALS, EQUIPMENT, APPARATUS AND APPURTENANCES REQUIRED FOR A <br />COMPLETE WORKING AND COORDINATED SYSTEM. MATERIALS, EQUIPMENT, APPARATUS, AND <br />APPURTENANCES SHALL MATCH EXISTING BUILDING STANDARDS IN QUALITY, TYPE AND FINISH, <br />UNLESS OTHERWISE NOTED. <br />4. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT. COORDINATE THE EXACT LOCATIONS OF NEW <br />MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHTING FIXTURES, PIPING, AND <br />OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE AND MAINTAIN EQUIPMENT <br />PRIOR TO START OF CONSTRUCTION. <br />5. COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES. PROVIDE OFFSETS IN <br />DUCTWORK AND PIPING AS REQUIRED AT NO ADDITIONAL COST TO OWNER. <br />6. TRADES TO LEAVE 36" CLEARANCE IN FRONT OF MECHANICAL EQUIPMENT ACCESS PANELS FOR <br />SERVICING. <br />7. INSTALL DUCTWORK AND PIPING TO ALLOW MINIMUM ACCESS OF 6" ABOVE AND TO THE SIDE OF THE <br />ELECTRICAL CABLE TRAYS. <br />8. SUPPORT CONDUIT, PIPING, AND DUCTWORK INDEPENDENTLY. SUPPORTS ARE INDEPENDENT OF <br />PARTITION AND CEILING SYSTEM SUPPORTS. <br />9. IN NO INSTANCE SHALL OTHER TRADES HANG OR SUPPORT EQUIPMENT, CEILING WIRES, LIGHT <br />FIXTURE HANGERS, ETC., FROM HVAC EQUIPMENT, DUCTWORK, OR PIPING. <br />10, CUTTING, FRAMING, PATCHING, AND PAINTING OF WALL, CEILING, AND FLOOR OPENINGS SHALL BE BY <br />MCKINSTRY. THIS INCLUDES OPENINGS THROUGH AREA SEPARATION WALLS <br />It OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT <br />PREVIOUSLY COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC. <br />12. REFER TO STRUCTURAL DRAWINGS FOR EQUIPMENT SUPPORTS. REFER TO THE SPECIFICATIONS <br />MATRIX FOR ADDITIONAL SEISMIC INFORMATION. <br />13, UNIT WEIGHTS AND LOCATIONS HAVE BEEN COORDINATED TO DETERMINE BUILDING STRUCTURAL <br />ADEQUACY. IF IT IS NECESSARY TO RELOCATE A UNIT, NOTIFY MCKINSTRY ENGINEERING <br />DEPARTMENT FOR RE -COORDINATION. <br />14. PROVIDE SEISMIC RESTRAINTS AND ANCHORAGE PER SMACNA AND THE INTERNATIONAL BUILDING <br />CODE FOR DUCTWORK, PIPING, AND EQUIPMENT. <br />15. CONCRETE EQUIPMENT CURBS, FLASHINGS, SLEEPERS, CONCRETE STATIONS, EMBED PLATES, <br />PIPING RAT SLABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE SHOWN FOR APPROXIMATE <br />LOCATION AND SIZE AND WILL BE PROVIDED BY McKINSTRY. WHERE PROVIDED, REFER TO <br />STRUCTURAL INFO FOR ADDITIONAL DETAILS. <br />16. CUTTING AND PATCHING OF ROOF OPENINGS SHALL BE BY McKINSTRY. <br />17. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF <br />EQUIPMENT FURNISHED BY THE OWNER OR OTHERS. <br />18. PROVIDE ACCESS DOORS IN WALLS AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED <br />MECHANICAL OR PLUMBING EQUIPMENT, VALVES, CONTROLS, AND OTHER DEVICES. <br />19. PROVIDE PIPE, EQUIPMENT, AND VALVE LABELING FOR IDENTIFICATION. MATCH OWNERS EXISTING <br />LABELING SCHEME IF APPLICABLE. <br />20. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF MECHANICAL WORK TO PROVIDE <br />CLEARANCES OVER LIGHTING FIXTURES FOR REMOVAL AND REPLACEMENT, <br />21. PROVIDE FIRE SAFE PENETRATIONS OF FIRE RATED CONSTRUCTION. <br />22. MINIMUM VENTILATION QUANTITIES SHALL COMPLY WITH OR EXCEED THE 2015 INTERNATIONAL <br />MECHANICAL CODE WITH THE WASHINGTON STATE AMENDMENTS. <br />23. VARIABLE PITCH SHEAVES TO BE USED FOR SYSTEM BALANCING. REPLACE WITH FIXED PITCH <br />SHEAVES FOR NORMAL OPERATION. <br />SUBMITTAL NOTES: <br />1. PROVIDE A HVAC/PLUMBING EQUIPMENT AND COMPONENT SUBMITTAL PACKAGE. INCLUDE IN THE <br />PACKAGE SUBMITTALS FOR ITEMS INCLUDED ON THE SCHEDULE ANDIOR SPECIFICATION SHEETS. <br />ALSO INCLUDE SUBMITTALS FOR VALVES, GAUGES, AND INSTRUMENTATION. PIECEMEAL SUBMITTALS <br />ARE NOT ACCEPTABLE. <br />2. PROVIDE CONTRACTOR PREPARED SHOP DRAWINGS OF CONTRACTOR FABRICATED SHEET METAL <br />SYSTEMS. DRAWINGS SHALL BE PREPARED AT 1/4' SCALE USING COMPUTER AIDED DESIGN (CAD) <br />SOFTWARE UNLESS INDICATED OTHERWISE. DRAWINGS SHALL SHOW EXACT LOCATION OF <br />EQUIPMENT AND DUCTWORK, EACH SECTION OF SHOP FABRICATED DUCT AND LOCATION OF FIELD <br />JOINTS, SUPPORTS, AND BUILDING ATTACHMENTS, AND SEISMIC RESTRAINT LOCATIONS. <br />3. PRIOR TO FLUE SHOP DRAWING SUBMITTAL, THE CONTRACTOR SHALL COORDINATE AND RECEIVE <br />APPROVAL FROM THE BOILER MANUFACTURER ON THE FINAL DETAILED FLUE ROUTING. <br />4. PROVIDE CONTROLS SUBMITTAL PACKAGE. INCLUDE IN THE PACKAGE SUBMITTALS FOR SEQUENCE <br />OF OPERATIONS, SYSTEM DIAGRAMS, ARCHITECTURE DIAGRAMS, PLANS, PLUS EQUIPMENT AND <br />COMPONENTS. <br />5. THE PIPING CONTRACTOR SHALL PROVIDE FULL SUBMITTALS OF PIPING AND DEVICES FOR <br />APPROVAL PRIOR TO PURCHASE AND INSTALLATION. <br />& THE CONTRACTOR SHALL COORDINATE APPROVAL OF BOILER VENTING LAYOUT AND SIZING BY <br />BOILER MANUFACTURER PRIOR TO PURCHASE AND INSTALLATION. <br />7. SUBMITTALS FOR MECHANICAL EQUIPMENT REQUIRING LINE -VOLTAGE POWER SHALL INCLUDE THE <br />FOLLOWING ITEMS: VOLTAGE, PHASE, HORSEPOWER, FLA (FULL LOAD AMPS), MCA (MINIMUM CIRCUIT <br />AMPACITY), MOCP (MAXIMUM OVERCURRENT PROTECTIVE DEVICE), AND SCCR (SHORT CIRCUIT <br />CURRENT RATING). SUBMITTALS SHALL ALSO INCLUDE AN ELECTRICAL WIRING SCHEMATIC, UNLESS <br />THE EQUIPMENT CONSISTS SOLELY OF A THREE-PHASE INDUCTION MOTOR. <br />CONTROLS SYSTEM AND GRAPHIC NOTES: <br />1. MAIN CONTROL PORTAL: ONE COMMON SCREEN PER BUILDING THAT DISPLAYS AND PROVIDES THE <br />ABILITY TO MANIPULATE THE ASPECTS OF SCHEDULING AND SET POINTS FOR THE FACILITY ON A <br />GLOBAL LEVEL SHALL BE INCORPORATED INTO THE CONTROLS DELIVERABLE. <br />2. GRAPHICS SHALL MIRROR THE BUILDING FLOOR PLANS, WITH IDENTIFIABLE ROOM AND <br />EQUIPMENT/SYSTEM LOCATIONS. <br />3. GRAPHICS SHALL BE LINKABLE TO SPECIFIC EQUIPMENT, SYSTEM POINTS AND OPERATING <br />PARAMETERS WHICH ALLOW FOR'ONE CLICK' DIAGNOSIS WHEN ISSUES ARE IDENTIFIED. <br />4. GRAPHICS SHALL HAVE DROP DOWN WINDOWS LINKING REFERENCES TO THE CONTROL DRAWINGS, <br />SEQUENCES OF OPERATION, CONTROL PARAMETERS AND SPECIFIC EQUIPMENTISYSTEM <br />INFORMATION. <br />5. THE CONTROL CONTRACTOR SHALL COORDINATE WITH OWNER ON THE PROPOSED GRAPHICS <br />LAYOUT PRIOR TO SUBMITTALS. <br />6. CONTROLS CONTRACTOR SHALL REFERENCE MCKINSTRY CONTROL PROVIDER PERFORMANCE <br />STANDARD FOR PROJECT EXPECTATIONS AND SHALL WORK WITH COMMISSIONING AGENT FOR <br />ADHERENCE. <br />7. REFERENCE THE SEQUENCE OF OPERATION CONTAINED WITHIN THESE CONSTRUCTION DOCUMENTS <br />FOR ADDITIONAL CONTROLS REQUIREMENTS. <br />SHEET METAL NOTES: <br />1. PROVIDE DUCTWORK IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS, <br />METAL AND FLEXIBLE, SECOND EDITION, 2005 (SMACNA HVACDCS). <br />2. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. <br />3. PROVIDE A MANUAL VOLUME DAMPER FOR EACH SUPPLY, RETURN, AND EXHAUST OPENING EXCEPT <br />WHERE PROHIBITED BY CODE. INSTALL AS FAR FROM INLET OR OUTLET AS POSSIBLE. <br />4. PROVIDE FLEXIBLE CONNECTION AT EACH DUCT CONNECTION TO FANS, AIR HANDLING UNITS, AND <br />SIMILAR EQUIPMENT. DO NOT INSTALL ON EQUIPMENT LOCATED IN FIRE RATED CORRIDOR CEILING. <br />5. DUCT SMOKE DETECTORS: LOCATE DUCT SMOKE DETECTORS IN ACCORDANCE WITH <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE LOCATION REQUIREMENTS WITH <br />ELECTRICAL. <br />ELECTRICAL COORDINATION NOTES: <br />1. WHERE INDICATED ON THE EQUIPMENT SCHEDULES, THE EQUIPMENT COMES COMPLETE FROM THE <br />FACTORY WITH MOTOR CONTROLS AS REQUIRED. ELECTRICIAN SHALL PROVIDE SERVICE AND <br />DISCONNECT PER CODE, AND POWER WIRING, INCLUDING CONNECTING TO EQUIPMENT. <br />2. WHERE INDICATED ON EQUIPMENT SCHEDULES, THE EQUIPMENT REQUIRES FIELD INSTALLED MOTOR <br />STARTERS. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL MOTOR STARTERS (OR <br />CONTACTORS WHERE INDICATED). PROVIDE SERVICE AND DISCONNECT PER CODE, AND POWER <br />WIRING, INCLUDING CONNECTING TO EQUIPMENT. HOLDING COIL CIRCUIT SHALL BE POWERED BY <br />ELECTRICAL CONTACTOR (120V UNLESS INDICATED OTHERWISE). STARTERS SHALL BE PROVIDED <br />WITH H-O-A SWITCH, EXCEPT SMOKE CONTROL FANS SHALL NOT HAVE HAND OFF POSITIONS ON THE <br />STARTERS AS NOTED ABOVE. <br />3. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF THE MECHANICAL <br />EQUIPMENT, UNLESS OTHERWISE NOTED. <br />DEMOLITION NOTES: <br />1. DEMOLITION DRAWINGS ARE INCLUDED TO GIVE A COMMON BASIS FOR BIDDING AND MAY NOT SHOW <br />EVERY ITEM TO BE DEMOLISHED. VISIT SITE TO DETERMINE AND COORDINATE THE EXACT EXTENT <br />OF DEMOLITION TO FACEPLATE WORK INDICATED BY THE CONTRACT DOCUMENTS, REWORK <br />EXISTING TERMINATIONS, CONNECTIONS, ETC., TO ACCEPT NEW WORK. PRIOR TO START OF ANY <br />DEMO WORK, VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR <br />RESOLUTION. <br />2. REMOVE EXISTING HVAC EQUIPMENT AS INDICATED, INCLUDING ASSOCIATED PIPING, CONTROL <br />SYSTEMS, AND APPURTENANCES. <br />3. REMOVE EXISTING DUCTWORK AS INDICATED. CAP EXISTING OPENINGS NOT BEING REUSED. <br />4. REMOVE EXISTING PIPING SERVING ITEMS TO BE REMOVED. CAP OR PLUG BRANCH LINES NOT BEING <br />REUSED. <br />5. GIVE OWNER THE OPPORTUNITY TO RETAIN ANY REMOVED ITEMS THAT ARE NOT BEING REUSED. <br />DISPOSE OF OTHER ITEMS LEGALLY. <br />6. CLEAN AND REFURBISH ITEMS INDICATED TO BE REMOVED AND REUSED PRIOR TO REUSE. <br />PIPING NOTES: <br />1. BACKFLOW DEVICES, CROSS CONTROL DEVICES, VACUUM BREAKER AND DOUBLE CHECK VALVES TO <br />BE A TYPE APPROVED BY THE STATE OF WASHINGTON HEALTH SERVICES DIVISION. <br />2. INSTALL AIR VENTS AT HIGH POINTS IN HYDRONIC PIPING. INSTALL DRAIN VALVES IN LOW POINTS IN <br />HYDRONIC PIPING. <br />3. PROVIDE FLANGES OR UNIONS AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL <br />VALVES, AND OTHER COMPONENTS TO ALLOW FOR MAINTENANCE. <br />4. PROVIDE REDUCERS AS REQUIRED FROM LINE PIPE SIZE TO EQUIPMENT, TRAP, COIL, AND CONTROL <br />VALVE CONNECTION SIZES. <br />5. PROVIDE OFFSETS FOR BRANCH LINES TO EQUIPMENT TO ALLOW FOR SERVICE AND MAINTENANCE <br />OF EQUIPMENT. <br />6. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR PIPE MATERIALS. <br />7. PIPE SUPPLY WATER LINES TO BOTTOM OF COILS LEAVING AIR SIDE TO OBTAIN COUNTERFLOW <br />ARRANGEMENT. <br />B. PROVIDE PRESSURE AND TEMPERATURE TEST PORTS AT SUPPLY AND RETURN PIPING <br />CONNECTIONS TO EQUIPMENT. <br />9. SIZE BALANCINGIMEASURING VALVES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. DO <br />NOT PROVIDE VALVES LARGER THAN LINE SIZE. <br />10. EXPANSION TANK PRE -CHARGE SHALL BE TO 15PSI. <br />WASHINGTON STATE ENERGY CODE NOTES: <br />1. PROVIDE COMMISSIONING PLAN IN ACCORDANCE WITH 2O18 WASHINGTON STATE ENERGY CODE <br />SECTION C408. <br />2. PROVIDE SYSTEMS TESTING AND BALANCING IN ACCORDANCE WITH 2O18 WASHINGTON STATE <br />ENERGY CODE SECTION C408.2.2. <br />3. PROVIDE SYSTEMS, EQUIPMENT, AND CONTROLS FUNCTIONAL TESTING IN ACCORDANCE WITH 2O18 <br />WASHINGTON STATE ENERGY CODE SECTIONS G408.2.3, C408.3.1, C408.4.1, C408.5. <br />4. PROVIDE SUPPORTING DOCUMENTATION IN ACCORDANCE WITH 2O18 WASHINGTON STATE ENERGY <br />CODE C103.6 INCLUDING OPERATION AND MAINTENANCE MANUALS, HVAC CONTROL SYSTEM <br />MAINTENANCE AND CALIBRATION INFORMATION, HVAC CONTROL SEQUENCE OF OPERATIONS, <br />COMMISSIONING REPORT, AND RECORD DRAWINGS. <br />5. PROVIDE OWNER TRAINING FOR NECESSARY SYSTEMS PER 2018 WASHINGTON STATE ENERGY CODE <br />SECTION C103.6.4. <br />6. PROVIDE COMMISSIONING COMPLIANCE FORM IN ACCORDANCE WITH 2O18 WASHINGTON STATE <br />ENERGY CODE SECTION C408.1.3. <br />7. MOTORS SHALL COMPLY WITH SECTION C403.2.13 OF THE 2018 WASHINGTON STATE ENERGY <br />CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING <br />SET. <br />B. SYSTEMS SHALL BE INSULATED AS PRESCRIBED IN SECTIONS C403.2.8, C403.2.9 AND C404.6 OF THE <br />2018 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING <br />SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET. <br />9. HVAC EQUIPMENT SHALL NOT BE SIZED LARGER THAN THE NEXT LARGEST SIZE BASED ON LOAD <br />CALCULATION, WSEC 0403.2.2. <br />10, OCCUPIED SPACES ARE MECHANICALLY VENTILATED. SYSTEMS ARE DESIGNED TO PROVIDE MINIMUM <br />OUTSIDE AIR PER MECHANICAL CODE AND SHALL NOT EXCEED 150% CALCULATED VALUE, WSEC <br />403.2.6 & 403.2.11.4. <br />11. BALANCE SYSTEMS TO WITHIN TOLERANCES SPECIFIED. FIRST BALANCE TO MINIMIZE THROTTLING <br />LOSSES THEN TO MEET DESIGN FLOW, WSEC 408.2.2. <br />1Z PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER PER WSEC C103.6. <br />13. PROVIDE MAINTENANCE MANUALS FOR ALL MECHANICAL EQUIPMENT, WSEC C103.6. <br />14. PROVIDE OWNERS OPERATING PERSONNEL TRAINING FOR MECHANICAL EQUIPMENT, WSEC C103.6. <br />15. PROVIDE WSEC COMPLIANCE FORMS AND CALCULATIONS, WSEC C103.6. <br />RESPONSIBILITY MATRIX - HORIZON ELEMENTARY <br />SCHOOL <br />EQUIPMENT <br />FURNISH <br />RECEIVE <br />INSTALL <br />WIRE <br />CONTROLS <br />START-UP <br />VERTICAL AIR HANDLING UNITS <br />McK <br />MC <br />MC <br />EC <br />CC <br />MC <br />AIR HANDLING UNIT CUSTOM MIXING BOXES <br />MC <br />MC <br />MC <br />- <br />- <br />- <br />FANS <br />MCK <br />MC <br />MC <br />EC <br />CC <br />MC <br />AHU FAN REFURBISHMENT <br />McK <br />MCK <br />M& <br />Md( <br />DIFFUSERSIGRILLES <br />MC <br />MC <br />MC <br />WALUt00F OPENINGS <br />McK (1) <br />SHEETROCKI PLASTER / CEILINGS I REPAIR ETC. <br />McK <br />MC <br />MC <br />SYSTEM CLEAN AND FLUSH <br />MC <br />SYSTEM INITIAL CHEMICALTREATMENT <br />MC <br />MC <br />MC <br />MC <br />INSULATING PIPING, DUCTWORK, AND EQUIPMENT <br />MC <br />MC <br />MC <br />DUCTWORK AND ASSOCIATED APPURTENANCES <br />MC <br />MC <br />MC <br />PIPING, PLUMBING, ASSOCIATED APPURTENANCES <br />MC <br />MC <br />MC <br />CONTROL DAMPERS (MINUS ACTUATOR) <br />MC <br />MC <br />MC <br />MC <br />CONTROL DAMPER ACTUATORS <br />CC <br />CC <br />CC <br />CC <br />CC <br />TEMPERATURE AND PRESSURE CONTROL SENSORS <br />CC <br />CC <br />CC <br />CC <br />CC <br />CO2SENSORS <br />CC <br />CC <br />CC <br />CC <br />CC <br />DEMO OF EXISTING VERTICAL AHUS AND APPURTENANCES(MIXING BOXES, <br />DISCHARGE DUCTWORK, COILS, ETC.) <br />- <br />- <br />MC <br />EC <br />CC <br />- <br />DEMO OF EXISTING FANS <br />MC <br />EC <br />CC <br />DEMO OF EXISTING HOT WATER COILS <br />MC <br />CC <br />DEMO OF INSULATING PIPING, DUCTWORK, AND EQUIPMENT <br />MC <br />DEMO DUCTWORK AND ASSOCIATED APPURTENANCES <br />MC <br />DEMO OF PIPING,PLUMBING, ASSOCIATED APPURTENANCES <br />MC <br />- <br />DEMO OF EXISTING LINE VOLTAGE CONDUIT/BOXES <br />- <br />EC <br />- <br />DEMO OF EXISTING MOTORIZED DAMPERS <br />MC <br />CC <br />DEMOLITION OF EXISTING SENSORS <br />- <br />- <br />- <br />- <br />CC <br />- <br />DEMOLITION OF EXISTING CONTROL CONDUITANIRE <br />CC <br />- <br />LSVERIFICATION <br />CC/CA <br />TESNG/ADJUSTINGBALANCING <br />CA <br />�CONTRO <br />COMMISSIONINGIFUNCTIONAL PERFORMANCE TESTING <br />CA <br />TRAINING <br />McK <br />NOTES: <br />1. BASED ON DIRECTION FROM MC <br />McK-McKINSTRY <br />CA- COMMISSIONING AGENT <br />MC- MECHANICAL CONTRACTOR <br />EC - ELECTRICAL CONTRACTOR <br />CC- CONTROLS CONTRACTOR <br />HVAC BASIS OF DESIGN - HORIZON ELEMENTARY SCHOOL <br />ITEM# <br />DATELASTMODIFIED <br />SYSTEM <br />CRITERIA <br />CRITERIASOURCE <br />CODE BASIS FOR PROJECT <br />1-1 <br />4/1512022 <br />CODE <br />2018 INTERNATIONAL BUILDING CODE WITH WA STATE AMENDMENTS <br />1-2 <br />4/15/2022 <br />CODE <br />2018 INTERNATIONAL EXISTING BUILDING CODE WITH WA STATE AMENDMENTS <br />1-3 <br />4/15/2022 <br />CODE <br />2018 INTERNATIONAL MECHANICAL CODE WITH WA STATE AMENDMENTS <br />id <br />4115/2022 <br />CODE <br />2018 NATIONAL FUEL GAS CODE (NFPA 54) <br />1-5 <br />4/1512022 <br />CODE <br />2018 INTERNATIONAL FUEL GAS CODE WITH WA STATE AMENDMENTS <br />MUKILTEO PERMITTING <br />DEPARTMENT <br />1-6 <br />4/15/2022 <br />CODE <br />2018 INTERNATIONAL FIRE CODE ENFORCED BY LOCAL JURISDICTION <br />1-7 <br />4/1512022 <br />CODE <br />2018 UNIFORM PLUMBING CODE ENFORCED BY LOCAL JURISDICTION <br />1-8 <br />4/1512022 <br />CODE <br />2018 WASHINGTON STATE ENERGY CODE ENFORCED BY LOCAL JURISDICTION <br />1-9 <br />4/1512022 <br />CODE <br />2020 NATIONAL ELECTRICAL CODE (NFPA 70) ENFORCED BY LOCAL JURISDICTION <br />1-10 <br />4/1512022 <br />STANDARD <br />12019 ASHRAE 62.1 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY <br />1-11 <br />4/15/2022 <br />STANDARD 77TN17ASHRAEHANMOK <br />FUNDAMENTALS <br />ASHRAE <br />1-12 <br />4/1512022 <br />OPR <br />MUKILTEO SO OWNER PROJECT REQUIREMENTS <br />OWNER <br />BASIS FOR LOAD CALCULATIONS <br />OFFICE BUILDING OPERATING HOURS:5:DO AM-2 30 PM, SAT: CLOSED, SUN -HOLD: CLOSED <br />2018 WSEC RECOMMENDED <br />2-1 <br />4/1512022 <br />OPERATING HOURS <br />OUTDOOR DESIGN TEMPS <br />CLASSROOM BUILDINGS OPERATING HOURS: 5:00 AM-2:30 PM, SAT: CLOSED, SUN -HOLD: CLOSED <br />(PAINE FIELD) <br />OUTDOOR DESIGN <br />2018 WSEC RECOMMENDED <br />2-2 <br />4/15/2022 <br />TEMPERATURE <br />WINTER OSA DESIGN TEMP =21'F DB <br />OUTDOOR DESIGN TEMPS <br />(PAINE FIELD) <br />25 <br />4/15/2022 <br />INDOOR HEATING <br />CONDITIONED SPACES =727 DB, 50% RELATIVE HUMIDITY <br />BASIS OF DESIGN/2018 WSEC <br />DESIGN CRITERIA <br />UNCONDITIONED SPACES = 65'F DB, 50% RELATIVE HUMIDITY <br />G302.1 <br />CLASSROOMS (CHILDREN 5-8 YEARS OLD): 30 PEOPLE I TOM SF <br />2-4 <br />4/1512022 <br />OCCUPANT DENSITY <br />CLASSROOMS (CHILDREN OVER 8 YEARS OLD): 30 PEOPLE / 1000 SF <br />BASIS OF DESIGN 12018 WSMC, <br />CONFERENCE: 50 PEOPLE / 1000 SF <br />CHP 4, TBL 403.3.1.1 <br />OFFICES: 3 PEOPLE / 1000 SF <br />CLASSROOMS: 10 CFM/PERSON AND 0.12 CFM/SF <br />2018 WSMC, <br />2-5 <br />4/15/2022 <br />4/15/2022 <br />VENTILATION RATES <br />OFFICES: 5CFM/ PERSON AND 0.O6CFM/SF <br />CH 403.3.1.1 <br />CONFERENCE: 5 CFM/PERSON AND 0.06 CFM/SF <br />25 <br />4/1512022 <br />EXHAUST RATES <br />BATHROOMS: MINIMUM OF 50 CFM PER FIXTURE <br />2018 WSMC, <br />JANITOR CLOSETS: MINIMUM OF 1 CFMISF <br />CHIP 4, TBL 403.3.1.1 <br />BASIS FOR BUILDING ENVELOPE USED IN HVAC LOADS <br />3-1 <br />4/15/2022 <br />INFILTRATION <br />ALL SPACES: 0.35 CFM PER SQUARE FOOT OF EXTERIOR WALL AREA <br />MCKINSTRY RECOMMENDATION <br />SLOPED ROOF: U-VALUE=0.031 (METAL ROOFING, RJ0 RIGID INSULATION, 30 # BUILDING FELT, PLYWOOD SHEATHING, T&G <br />ARCH DRAWINGS DATED 0411011989, <br />3-2 <br />4/15/2022 <br />ROOF <br />DECKING, GLUE ON ACOUSTICAL TILE WI METAL EDGE) <br />INSULATION VALUE SOURCE <br />(2017 ASHRAE FUNDAMENTALS) <br />EXTERIOR WALLS (ALL BUILDINGS): U-VALUE=0.092 (MASONARY VENEER, 15# BUILDING FELT, 112" PLYWOOD SHEATHING, 6' METAL <br />ARCH DRAWINGS DATED 04110/1989, <br />3-3 <br />4I15/2022 <br />WALL <br />STUDS, R-19 INSULATION, 5/8 GWB) <br />(2INSULATION <br />E FUNDAMENTALS) <br />ARCH DRAWINGS DATED 0411011989, <br />3-4 <br />411512022 <br />WINDOW <br />VERTICAL GLAZING: U-VALUE=1.20 (SINGLE PANE, CLEAR, ALUMINUM FRAME, NON -THERMALLY BROKEN, FIXED GLAZING) <br />INSULATION VALUE SOURCE <br />(2017 ASHRAE FUNDAMENTALS) <br />ARCH DRAWINGS DATED 04110/1989, <br />3-5 <br />4/15/2022 <br />SLAB ON GRADE <br />SLAB: U-VALUE=0.58 (UNHEATED, 2 FT VERTICAL, R5 INSULATION) <br />INSULATION VALUE SOURCE <br />(2017 ASHRAE FUNDAMENTALS) <br />BASE SCOPE OF WORK - EXISTING CONDITIONS <br />TYPICAL CLASSROOM VERTICAL AIR HANDLER CONTAINS A HEATING HOT WATER COIL, A FAN, AND A FILTER. UNDER EACH <br />VERTICAL AHU IS A MIXING BOX WITH AN OUTSIDE AIR (OA) DAMPER AND A RETURN AIR (RA) DAMPER. THE HEATING HOT WATER <br />TYPICAL CLASSROOM <br />COILS IS GENERALLY CONTROLLED WITH A TWO WAY CONTROL VALVE. HOWEVER SOME ARE CONTROLLED BY A 3 WAY CONTROL <br />4-1 <br />4/1512022 <br />VERTICALAIR <br />VALVE FOR SUFFICIENT HYDRONIC HEATING SYSTEM BYPASS. SOME VERTICAL AHUS HAVE DISCHARGE DUCTWORK WHICH <br />EXISTING SYSTEM <br />HANDLING UNITS <br />SUPPLIES DIFFUSERS WITHIN THE ROOM; HOWEVER A LARGE PORTION OF UNITS DISCHARGE THROUGH TWO DIFFUSERS AT THE <br />TOP OF THE CLOSET. RETURN ENTERS VIA GRILLE ON THE BOTTOM OF THE CLOSET. ORIGINAL UNITS WERE ALL CAPABLE OF <br />100% ECONOMIZER MODE WHEN FREE COOLING IS AVAILABLE. ALL UNITS ARE BEYOND THEIR USEFUL LIFE. <br />BUILDING D COMMON <br />THERE ARE 4 STORAGE CLOSETS OFF OF THE HALLWAY IN BUILDING D, EACH WITH A VERTICALAIR HANDLER WHICH SERVES THE <br />4-2 <br />4/15/2022 <br />AREA VERTICAL AIR <br />SURROUNDING HALLAYS, RESTROOMS, AND JANITORISTORAGE CLOSETS. THESE UNITS HAVE DUCTED SUPPLY, DUCTED RETURN, <br />EXISTING SYSTEM <br />HANDLING UNITS <br />AND DUCTED CA THESE UNITS ARE OTHERWISE THE SAME AS THE TYPICAL UNIT. ORIGINAL UNITS WERE ALL CAPABLE OF 100% <br />ECONOMIZER MODE WHEN FREE COOLING IS AVAILABLE. <br />THERE ARE SEVERAL INLINE EXHAUST FANS SERVING THE VARIOUS BUILDINGS. EF-B1 SERVES THE NURSES OFFICE IN BUILDING <br />4-3 <br />4/15/2022 <br />EXHAUST FANS <br />B, EF-132 SERVES THE RESTROOMS AND JANITOR CLOSET/MECHANICAL SPACE IN BUILDING B, EF-D1 SERVES THE RESTROOMS <br />EXISTING SYSTEM <br />AND JANITORISTORAGE CLOSETS IN BUILDING D AND EF-Cl SERVES THE RESTROOMS AND JANITOR CLOSET IN BUILDING C. ALL <br />OF THESE EXHAUST FANS ARE PAST THEIR USEFUL LIFE. ALL OF THESE EXHAUST FANS RUN CONTINUOUSLY. <br />BUILDING B SUPPLY AIR IS SERVED BY TWO LARGE AIR HANDLERS, AHU-B3 AND AHU-B4. AHU-83 SERVES THE LIBRARY AND <br />4-4 <br />4I15I2022 <br />BUILDING B LARGE <br />ADJOINING SPACES, WHILE AHU-B4 SERVES THE OFFICES AND ADJOINING SPACES. THERE ARE HEATING HOT WATER COILS <br />EXISTING SYSTEM <br />AHUS <br />LOCATED THROUGHOUT THE BUILDING TO SERVE ALL THE VARIOUS ZONES INDIVIDUALLY. RETURN AIR FOR AHU-B4 AND RELIEF <br />AIR FOR THE BUILDING ARE SERVED BY RF-B1. <br />BASE SCOPE OF WORK -NEW WORK <br />NEW VERTICAL AHUS TO BE INSTALLED IN SAME LOCATION AS PREVIOUS. UNITS TO BE RE -CONNECTED TO ALL DUCTWORK AND <br />PIPING. NEW TWO-WAY CONTROL VALVE TO BE PROVIDED. UNIT DISCHARGE TO CONNECT TO EXISTING SUPPLY AIR DUCTWORK <br />VERTICALAIR <br />WHERE EXISTING. WHERE NO SUPPLY AIR DUCTWORK EXISTS, NEW DUCTWORK TO BE ROUTED ABOVE CEILING TO NEW <br />5-1 <br />4/1512022 <br />HANDLERS <br />DIFFUSERS IN ACT CEILING. NEW UNITS ARE TO HAVE MERV 13 FILTERS, EC MOTORS, AND BE CAPABLE OF 100% ECONOMIZER <br />PROPOSED DESIGN <br />MODE WHEN FREE COOLING IS AVAILABLE. UNITS TO BE CAPABLE OF PROVIDING 85F SUPPLY AIR WITH ENTERING WATER <br />TEMPERATURE OF 15OF AT DESIGN CONDITIONS. EACH UNIT WILL HAVE A FABRICATED PLENUM BOX AND 4" FILTER BOX <br />CONSTRUCTED TO SUPPORT THE VERTICAL AIR HANDLER AND ALLOW FOR T SOUND LINING. <br />VERTICAL AHU <br />EACH CLASSROOM VERTICAL AHU SHALL BE PROVIDED CUSTOM PLENUM MIXING BOX WITH 2" SOUND LINING FOR ACOUSTICAL <br />5-2 <br />4/15/2022 <br />ACOUSTICAL <br />MITIGATION AND 1" SOUND LINING IN THE DISTRIBUTION DUCT. LARGER UNITS ARE TO HAVE 2" SOUND LINING ON CLOSET <br />PROPOSED DESIGN <br />REQUIREMENTS <br />INTERIOR FACE TO MINIMIZE RADIATIVE NOISE. <br />UNITS TO BE CONTROLED BY BMS. CONTROLS CONTRACTOR TO PROVIDE MOTORIZED MODULATING CONTROL VALVES AND <br />5-3 <br />411512022 <br />VERTICAL AHU <br />ELECTRIC MODULATING ACTUATORS FOR ALL HYDRONIC HEATING COILS AND MOTORIZED DAMPERS. PROVIDE SPACE <br />PROPOSED DESIGN <br />CONTROLS <br />THERMOSTATS WHERE SHOWN ON DRAWINGS TO MONITOR TEMPERATURE AND UNIT OPERATION. PROVIDE HARDWARE, <br />SOFTWARE, AND PROGRAMMING FOR ALL EQUIPMENT LISTED AS DESCRIBED IN SEQUENCE OF OPERATION. <br />5-4 <br />4/15/2022 <br />BUILDING B LARGE <br />EXISTING AHU FANS TO REMAIN AND BE REFURBISHED AS NEEDED. REPLACE MOTORS, SHAFTS, BEARINGS, BELTS AND SHEAVES. <br />PROPOSED DESIGN <br />AHUS <br />CLEAN AND BALANCE FAN WHEEL. <br />5-5 <br />4/15/2022 <br />HEATING HOT WATER <br />NEW HEATING HOT WATER COILS TO BE INSTALLED IN LOCATION OF THE PREVIOUS. NEW TWO-WAY CONTROL VALVES TO BE <br />PROPOSED DESIGN <br />COILS <br />PROVIDED. RECONNECT EXISTING CONTROLS. <br />5-6 <br />4/15/2022 <br />EXHAUST FANS <br />NEW INLINE EXHAUST FANS TO BE INSTALLED IN LOCATION OF THE PREVIOUS. NEW FANS TO RUN CONTINUOUSLY WHEN <br />PROPOSED DESIGN <br />BUILDING IS IN OCCUPIED MODE. <br />5-7 <br />4/1512022 <br />RELIEF FAN <br />NEW INLINE RELIEF FAN TO BE INSTALLED IN LOCATION OF THE PREVIOUS. NEW MOTORIZED DAMPER TO BE PROVIDED. UNIT <br />PROPOSED DESIGN <br />CONTROL BY BMS TO TRACK AHU OUTDOOR AIR DAMPER. <br />aieitry <br />fOf Your Building <br />McKINSTRY Co, LLC <br />SEATTLE: <br />5005 3RD AVENUE S <br />PO BOX 24567 <br />SEATTLE, WA 98124 <br />1-800-669-6223 <br />www.mckinstrv.com <br />PROJECT: <br />MUKILTEO SD <br />PHASE 10 HVAC <br />IMPROVEMENTS <br />- HORIZON ES <br />222 W CASINO RD <br />EVERETT, WA 98204 <br />CONSULTANTS: <br />ISSUE: <br />PERMIT SET <br />05/06/2022 <br />REGISTRATION: <br />�R pF�WA�Z'stb <br />s��Q� f�ca�eA <br />52771 Q <br />Pol �E'GISTS <br />G <br />`rS10NAL <br />ISSUES <br />SR ENGINEER: <br />L. HESS <br />DRAWN BY: <br />M. SAFONOV N. HOBURG A. PASSAS <br />QC BY: <br />L. HESS <br />JOB NO: <br />205557-ON <br />ISSUED ON: <br />0510612022 <br />SHEET TITLE: <br />MECHANICAL <br />GENERAL NOTES, BOD, <br />& RESPONSIBILITY <br />MATRIX <br />SHEET NUMBER: <br />M-002 <br />