Laserfiche WebLink
Lumio <br /> SMART ENERGY TODAY <br /> (SET) <br /> 1550 DIGITAL DR,LEHI,UT <br /> 84043,USA <br /> SYSTEM INFO <br /> (20)Q CELLS <br /> Q.PEAK DUO BLK ML-G10+ <br /> (400W) <br /> (20)ENPHASE <br /> IQ8PLUS-72-2-US(240V) <br /> DC SYSTEM SIZE:8.000 kWDC <br /> ,N SOLAR BONDING CONNECTION GROUND PATHS " ■ .;; SM SOLAR ENDCLAMP, FIRST MODULE : ■ AC SYSTEM SIZE:6.000kWAC <br /> ■� MOUNT INSTALLATION GUIDE PAGE ■■ MOUNT INSTALLATION GUIDE PAGE <br /> - <br /> ------_-------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------- <br /> REVISIONS <br /> 4 ^r° f_t HGE�� O © © DESCRIPTION DATE REV <br /> i <br /> All <br /> MO�G<F�q,� OG(FF,4gMF © gpa S�RPrSS-OFA N 1 �f-� i �,1 // tel.' <br /> B \ pRE '1100'. OoaDtHG Teo ..�-. <br /> °NO/'QCT c'J r GNpPO� � Ta <br /> tpl_ � \ 0do Mir <br /> PROJECT NAME&ADDRESS <br /> BONDING MIDCLAMP ASSEMBLY BONDING MIDCLAMP ASSEMBLY BONDING RAIL SPLICE BAR RAILTO L-FOOTw/BONDING T-BOLT INSTALL MODULE END CLAMPS:The End INSTALL END CLAMPS ON RAIL: POSITION END CLAMPS: NOTE:To assist insertion of clamp into Q <br /> eonchng Hardware creates bond between surae Seatrd flange no removes Lfoit anodization clamp is supplied as an assembly with a 1/2' Slide end clamp on to rail by Slide end clamp assembly rail slot,Pressure may be applied to <br /> ® <br /> Aluminum mid clamp with stainless steel rbandingghl pins that pierce module frame Q bar and each rad section ©to bond LFoot to stainless steel T-bol[ f) <br /> anodization to bond module to module through clamp hex head bolt that is accessible at the ends of engaging the two t-guide brackets on to rail until bolt head top or side of bracket as shown.Do <br /> y�AWminum splice ba+spans across rail gap to Serrated T-bolt head penetrates ail anodization <br /> V ueatr rad to rail bond.Rail on at least one sine grounded rails.The clamp should be installed on the with the top slat of the rails. engages with end of rail not force clamp into rail by pushing <br /> Stainless steel nut bonds aluminum damp to stainless steel T-bolt SI bond T-Dolt.nut,and L-root ro <br /> aspllce wnl be grounded SM rail rails prior to installing end modules. boU is extended as far as possiule End clamps are positioned on on bolt with excessive force. � <br /> Serrated T-bolt head penetrates fail anodization to bond T-bolt,nut,clamp,and - so that clamp is positioned at max, rails prior to the first end O <br /> modules to SM rail N <br /> distance from end of rail, module and prior to the last 00 <br /> end module. CS) <br /> Q O <br /> E O <br /> .. Hu titin wf rA m w <br /> 2-► <br /> or > Q., _ <br /> faw 11R - - v° -- 1 . U) O <br /> 4 a-- 0 <br /> — - BONDING Jact °'°g ° V o 'tb r, ' Q w 0 <br /> T-BOLT �t��F gwigF S�VI�` six al .a 0. = 0 LU (D <br /> z IY <br /> Strum BONDING BONDING RAIL tA1 j\I LU CIO CIO <br /> OUND MICROINVERTER SPLICE BAR ©' Z 0 / LO <br /> ♦ LO <br /> MOUNT - _ ,� LU <br /> LLI O <br /> U) <br /> / Abbe, - WEEBLUG(OR ILSCO LUG) /® U LJ,J O <br /> IF 112' z Q <br /> BONDING MICROINVERTER MOUNT RACK SYSTEM GROUND INSTALL FIRST MODULE: ENGAGE CLAMP:While holding module in position and with >y bo0 Z <br /> [� <br /> Hex nut with cai tock washy metal (�WEEB washer dimples piece enodlzed fall to Install the first end module flange in full contact with rail,rotate end clamp bolt until For best appearance, N <br /> II 4 microinverter flange to stainless steel T-toll `-a create bond between rad and lug position module flush <br /> BONDING MiDCLAMv onto rails with the flange of clamp engages with flange to provide clamp force. with ends of rails.Rails <br /> 4 toporkSerrated-bolt-T-balthead penetrates ail aroduation <br /> ASSEMBLY - — Solid copper mreconneaedto lug isromedto the module frame positioned To ensure bolt is not over-torqued,use low torque setting should not extend more <br /> to ford T-Dolt-nuL and L-loot to grounded Z <br /> A -C yt,alt-,..,-,,,,,,,,;,,,. „l ©pfodde anal system ground connection. between end clamps an ends on drill or If using an impact driver,stop rotation as soon as �s than 1/2.beyond module. O <br /> nwums,.ryr,enneu un®f,rtr n,n ter- :lc..:�g,,,n.l.z ce, ,nr.:e:.,ww 1 Module must be fully <br /> aapgwamnwgartpa�w�i.pfpllu ����.-..nT+°lata of rails. impact action ofdriver begins. i <br /> RAILTO LFOOr ._rt4 -)11�IUEVALUE(See t.$fE t.... . -;�i��'... �� supported by rails and J <br /> wy8011OlNG 7-BOLT Cannot overhang ends <br /> End clamp bolt to 5 ft-lbs.No anti-seize of rails. M <br /> O <br /> U') <br /> N <br /> DATE: 10/28/2022 <br /> SHEET NAME <br /> EQUIPMENT <br /> LSPECIFICATIONS <br /> SHEET SIZE <br /> ANSI B <br /> 11" X 17" <br /> SHEET NUMBER <br /> PV-19 <br />