My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2410 RAILWAY AVE 2025-08-15
>
Address Records
>
RAILWAY AVE
>
2410
>
2410 RAILWAY AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 7:57:05 AM
Creation date
4/6/2023 12:02:49 PM
Metadata
Fields
Template:
Address Document
Street Name
RAILWAY AVE
Street Number
2410
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
642
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• Material of standpipe assemblies <br />• Connection type between standpipe assemblies and PVC outlet pipes <br />• Runoff Treatment Design Stormwater Surface Elevation <br />d. Page C3.2: Detail 02, Verify that minimum 24" clearance will be provided between ladder and <br />large baffle hood within each flow splitter structure. <br />e. Page C3.2: Update South Storm Filter detail to match inlet pipe configuration shown on plans. <br />4. Construction Stormwater Pollution Prevention Plan revisions: <br />a. Page 1: Update area tables to match Permanent Stormwater Control Plan report. <br />5. Permanent Stormwater Control Plan revisions: <br />a. Page 4: Add description of proposed conditions for runoff from site areas not collected by <br />proposed conveyance system including description of portions of existing drainage system on <br />west side of property to remain in operation. <br />b. Page 4: The plans list site area as 10.42 acres. Update table to include areas that are not <br />tributary to proposed collection system. <br />c. Page 7: Describe how the structural BMP 431 is being met for truck washing. Will these <br />activities be performed inside the main building? <br />d. Page 7: Expand description of feasibility evaluation for BMP T5.10A and refer to comment on <br />geotechnical report page 5. <br />e. Page 7: Describe the site constraints that make BMP T5.1013 (downspout dispersion) infeasible. <br />f. Page 8: Describe the site constraints that make BMP T5.11 (concentrated flow dispersion) <br />infeasible. <br />g. Page 8: Describe the site constraints that make BMP T5.12 (sheet flow dispersion) infeasible. <br />h. Page 8: List what treatment level is required including oil control. <br />i. Page 9: State the level of treatment provided with the proposed facilities including oil control. <br />j. Figure 4: Add site areas that are not collected into proposed collection system or show them on <br />a separate figure. <br />k. Appendix D: In accordance with Minimum Requirement #9 an Operations and Maintenance <br />manual must be provided. The maintenance and operation information for the stormwater <br />facilities should be provided in a separate document entitled "Maintenance and Operations <br />Manual", and must include a first page indicating the party responsible for maintenance and <br />operation. In addition, the following language shall also be included in both the M&O manual <br />and the drainage report: <br />A copy of the maintenance and operations manual shall be retained on -site or within <br />reasonable access to the site and shall be transferred with the property to any new owner. A <br />O3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br />Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br />Page 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.