My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
>
Address Records
>
RUCKER AVE
>
3632
>
THE LANDING AT PORT GARDNER
>
3632 RUCKER AVE THE LANDING AT PORT GARDNER 2023-04-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:14:26 PM
Creation date
4/6/2023 3:10:05 PM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3632
Tenant Name
THE LANDING AT PORT GARDNER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t 1 <br /> 3. Revise modeling calculations—Revise orifice#1 and#3 size in model to 0.5" in model to <br /> match plan and minimum orifice size requirements. <br /> We have a detention system that has 3'or less of storage so we do not have to model the <br /> system with an orifice of 0.5"or less. <br /> 4. Design detention system to accommodate H-20 loading. Indicate Module model number <br /> on the plans. <br /> The system is designed to accommodate H-20 loading wih the two feet of cover, as <br /> shown. <br /> 5. Revise detail 4 on C4.1 to require impermeable liner between soil/stone interface, per <br /> detail "A"of Detail 2 on sheet C4.3. <br /> Please see revised detail. <br /> 6. Show detention system inlet pipe location on plan. Show how roof drains will be <br /> plumbed to the detention system. <br /> The inlet pipe is shown in the southeast corner of the building. The Aquaswirl system is <br /> located outside the building for easier maintenance. <br /> 7. Show location of maintenance row on plans. <br /> 1 don't understand this question. The Aqualswirl pretreatment system was located <br /> outside the building as well as the control structure. These two systems introduce ports, <br /> outside of the building, that can be used to maintain the system. <br /> 8. Provide information to City on proposed access location for vactor truck, confirm access <br /> to 10"ports. <br /> All the 10"ports are located within the drive aisle of the parking garage. <br /> 9. Do not locate panel directly below 10" Risers. <br /> What panel? There is a detail for the 10"riser on sheet C4.3. <br /> 10. Provide separate backwater valves and/or gate on outlet for detention vault and sanitary <br /> side sewer. <br /> Okay, see note. <br /> 11. Supplemental notes on detail 2 are too small to read even at full size. <br /> The detail as been made larger. <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425)303-9363 <br /> Fax: (425)303-9362 • Email:info@insightengineering.net <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.