Laserfiche WebLink
Aug. 31. 2004 3:47PM CHARLES MORGAN & ASSOC, No. 0044 P. 7 <br /> - • Grandview Homes, LLC „IN 99040 <br /> February 16, 1999 Page 5 <br /> accounted for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid <br /> density. <br /> Heavy construction equipment should not be operated behind retaining and foundation walls within <br /> a distance equal to the height of a wall, unless the walls are designed for the additional lateral <br /> pressures resulting from the equipment. The wall design criteria assume that the.backfill will be <br /> well-compacted in lifts no thicker than 12 inches. The compaction of backfill near the walls should <br /> be accomplished with hand-operated equipment to prevent the walls from being overloaded by the <br /> higher soil forces that occur during compaction. <br /> Retaining Wall Backfill <br /> Backfill placed behind retaining or foundation walls should be coarse, free-draining, <br /> structural fill containing no organics. This backfill should contain no more than 5 percent silt <br /> or clay particles and have no grave! greater than 4 inches in diameter. The percentage of <br /> particles passing the No. 4 sieve should be between 25 and 70 percent. For increased <br /> protection, drainage.composites should be placed along cut slope faces, and the walls <br /> should be backfilled with pervious soil. <br /> The purpose of these backfill requirements is to ensure that the design criteria for a <br /> retaining wall are not exceeded because of a build-up of hydrostatic pressure behind the <br /> wall. The top 12 to 18 inches of the backfill should consist of a compacted, relatively <br /> impermeable soil or topsoil, or the surface should be paved. The ground surface must also <br /> slope away from backfilled walls to reduce the potential for surface water to percolate into <br /> the backfill. The sub-section entitled General Earthwork and Structural Fill contains <br /> recommendations regarding the placement and compaction of structural fill behind retaining <br /> and foundation walls. <br /> The above recommendations are not intended to waterproof the below-grade walls, If moist <br /> conditions or some seepage through the walls are not acceptable, waterproofing should be <br /> provided. This typically includes limiting cold joints and wall penetrations, and using. <br /> bentonite panels or membranes on the outside of the walls. Applying a thin coat of asphalt <br /> emulsion is not.considered waterproofing, but will only help to prevent moisture, generated <br /> from water vapor or capillary action, from seeping through the concrete, <br /> Excavations and Slopes <br /> Excavation slopes should not exceed the limits specified in local, state, and national government <br /> safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in <br /> unsaturated soil, if. there are no indications of slope instability. Based upon Washington <br /> Administrative Code (WAC) 296, Part N, the soil type at the subject site would be classified as <br /> Type A. Therefore, temporary cut slopes greater than 4 feet in height cannot be excavated at an <br /> inclination steeper than 0.75:1 (Horizontal:Vertical), extending continuously between the top and <br /> the bottom of a cut. <br /> The above recommended temporary slope inclination is based on what has been successful at <br /> other sites with similar soil conditions. Temporary cuts are those that will remain unsupported for a <br /> relatively short duration.to allow for the construction of foundations, retaining.walls, or utilities. <br /> Temporary cut slopes should be protected with plastic sheeting during wet weather. The cut slopes <br /> should also be backfilled or retained as soon as possible to reduce the potential for instability. <br /> 43EOTECH CONSULTANTS,INC. /� <br />