My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1708 25TH ST A B 2023-04-07
>
Address Records
>
25TH ST
>
1708
>
1708 25TH ST A B 2023-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 3:07:46 PM
Creation date
4/7/2023 3:06:50 PM
Metadata
Fields
Template:
Address Document
Street Name
25TH ST
Street Number
1708
Unit
A B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> ENGINEERING <br /> PUBLIC SERVICES DEPARTMENT <br /> November 2, 2018 <br /> D. PALMAFFY <br /> 12925 47TH DR SE <br /> Everett, WA 98208 <br /> RE: Owner: KASKAD <br /> Job Address: 2503 WETMORE AVE <br /> Plan Check Number: C1808-011 <br /> Dear Mr. Palmaffy, <br /> In response to your application for a construction permit, your plans have been examined and you <br /> are advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address building issues only. Additional revisions or additions may be required by other <br /> departments such as Utilities, Planning or Fire. All references refer to the 2015 International Building <br /> Code (IBC), 2015 International Residential Code (IRC), as amended by the State of Washington <br /> and/or Washington State Energy Code (WSEC) 2015 Edition, as adopted by the City of Everett, <br /> unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to provide <br /> the Building Division with two new complete sets of drawings reflecting the corrections <br /> requested. <br /> Construction documents shall be of sufficient clarity to indicate the location, nature <br /> and extent of the work proposed and show in detail that it will conform to the <br /> provisions of the building code and relevant laws, ordinances, rules and regulations. <br /> 1. Provide building section specific to this structure showing how the roof structure is <br /> constructed, insulated and ventilated (provide ventilation calculations). The roof plan shows <br /> something extending beyond the exterior walls of the dwelling, provide detail to show how <br /> this is constructed. <br /> 2. Specify the material used for the walking surface of the roof-top deck. <br /> 3. Show how the roof deck is provided with a guard per section R312 IRC. <br /> 4. Show the construction, including attachment and height, of the parapet wall. <br /> 5. Unless roofs are sloped to drain over roof edges, roof drains shall be installed at each low <br /> point of the roof. (R903.4) <br /> a e1of4) <br /> CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8857 <br />
The URL can be used to link to this page
Your browser does not support the video tag.