Laserfiche WebLink
• <br /> is required to maintain continuity and if not, please describe the load path to accommodate <br /> the shear transfer from diaphragm to wall. <br /> If you have any questions on the corrections, please email or call me at (425) 257-8976. <br /> Upon submittal of the drawings, your application will be given priority and plan reviews will <br /> recommence. All required submittals shall be sufficient detail and contain sufficient information to <br /> ensure that the proposed structure will be constructed in compliance with all adopted codes. <br /> Please prepare a response letter showing where each item in this correction <br /> letter is addressed on the plan set. <br /> Sincerely, <br /> Jeff Heilman <br /> Development Technician <br /> City of Everett Public Works Department <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 I Direct: 425-257-8976 <br /> Email: iheilman(oeverettwa.gov <br /> '' <br /> ---41 /Ville WORKS <br /> The Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am -12:00pm and 1:00pm-4:00pm. <br /> All emails, and attachments, sent to and from City of Everett are Public <br /> Records and may be subject to public disclosure pursuant to RCW 42.56. <br /> Page 4of4 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8810 • Fax(425) 257-8 <br />