My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 1/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 1/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:44:49 PM
Creation date
4/12/2023 3:36:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
1/20/2023
Council Approval Date
1/18/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Jeff Marrs
Subject / Project Title
PSNGP Permit, NPDES Permit and Water Quality Support
Tracking Number
0003623
Total Compensation
$2,212,465.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 4/8/2025 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br /> <br />Assumptions <br />• The City will provide email notice to proceed to HDR for work identified under this contract. <br />• Budget for this contract is on a time and materials (T&M) basis and not-to-exceed total <br />contract authorization. <br />• Billing rates shall be applied based on actual direct labor costs times a factor of 3.20 plus <br />any reimbursable expenses at cost. <br />• HDR has a reasonable right to rely on any information or data provided from the City for <br />use under this agreement. <br />• All other items are covered under the contract terms and conditions. <br /> <br /> <br />Schedule <br />The project schedule for the Scope of Services is as follows: <br /> <br />Activity or Milestone Completion Date <br />Notice to Proceed December 21, 2022 <br />Receive Summer 2022 Data December 2022 <br />Meeting on 2022 Performance November/December 2022 <br />Receive City Comments on Draft <br />Nutrient Optimization Plan November/December 2022 <br />Conduct Conference Call November 30, 2022 <br />Conduct Meeting No. 1 December 7, 2022 <br /> <br />Receive City’s 2022 Plant Data January 13, 2023 <br />Working Draft Optimization Plan January 20, 2023 <br />1st Draft Annual Report City Review March 3, 2023 <br />First Annual Report Submittal March 31, 2023 <br /> <br />NPDES Permit & Fact Sheet Review 2022/2023/On-going <br /> <br />Water Quality Standards Review <br />Conduct Quarterly Workshops Quarterly <br />Conduct Monthly Meetings First Wednesdays Each Month <br /> <br /> <br />Receive City’s 2023 Plant Data January 2024 <br />2nd Draft Annual Report City Review March 2024 <br />2nd Annual Report Submittal March 31, 2024 <br />Repeat Annual Report Activities until <br />end of the initial PSNGP 5-year cycle <br />(2025, 2026 and 2027) December 31, 2027 <br /> <br />Nutrient Reduction Evaluation December 31, 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.