My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 1/5/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
BHC Consultants 1/5/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 10:19:55 AM
Creation date
4/13/2023 10:19:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
1/5/2023
Council Approval Date
1/4/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
WFP Air Scour Blower Building Replacement
Public Works WO Number
UP 3813
Tracking Number
0003655
Total Compensation
$183,297.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Facility Blower Building <br /> <br />Scope of Services 6 <br />Deliverables <br />1. Up to five (5) hard copies and one (1) electronic copy (Adobe PDF format) of the BODR, <br />60 percent design, 95 percent design, and Final Construction Bid Documents, stamped <br />and signed. <br />2. One (1) electronic copy (Adobe PDF format) of meeting minutes, as necessary. <br />Task 300 – Bid Assistance <br />Objectives <br />This effort shall assist the City during the bidding process. <br />BHC Services <br />1. Up to three (3) BHC staff members will attend pre-bid meeting. <br />2. Provide technical review and responses to bidder questions. <br />3. Assist the City in preparing addenda. <br />4. Assist the City with verifying bids. <br />City of Everett Responsibilities <br />1. Advertise the project in the DJC and local newspaper(s). <br />2. Post documents on Builder’s Exchange Washington. <br />Assumptions and Meetings <br />1. BHC to attend pre-bid meeting. <br />2. BHC to respond to up to eight (8) bidder questions. <br />3. BHC to help prepare up to two (2) addenda. <br />Deliverables <br />1. Responses to bidder questions, as required . <br />2. Draft addenda, as needed. <br />Task 400 – Engineering Services During Construction <br />Objectives <br />This effort shall assist the City during the construction process. <br />BHC Services <br />1. Review submittals and RFIs. <br />2. Assist the City with change ordersd. <br />City of Everett Responsibilities <br />1. Conduct project kick off meeting. <br />2. Provide the construction administration. <br />3. Provide all coordination with the contractor. <br />4. Prepare change orders. <br />5. City to oversee and provide technical support during startup and testing.
The URL can be used to link to this page
Your browser does not support the video tag.