1 owner, and, upon vacating the premises, a written release from the property owner of <br /> 2 each property disturbed or otherwise interfered with by reasons of construction pursued <br /> 3 under this contract. The statement shall be signed by the private property owner, or <br /> 4 proper authority acting for the owner of the private property affected, stating that <br /> 5 permission has been granted to use the property and all necessary permits have been <br /> 6 obtained or, in the case of a release, that the restoration of the property has been <br /> 7 satisfactorily accomplished. The statement shall include the parcel number, address, <br /> 8 and date of signature. Written releases must be filed with the Engineer before the <br /> 9 Completion Date will be established. <br /> 10 <br /> 11 1-08.0.RTF <br /> 12 1-08 PROSECUTION AND PROGRESS <br /> 13 <br /> 14 Add the following new section: <br /> 15 <br /> 16 1-08.0 Preliminary Matters <br /> 17 (May 25, 2006 APWA GSP) <br /> 18 <br /> 19 GLF 1-08.0(1).DOCX <br /> 20 Add the following new section: <br /> 21 <br /> 22 1-08.0(1) Preconstruction Conference <br /> 23 (COE based on October 10, 2008 APWA GSP) <br /> 24 <br /> 25 Prior to the Contractor beginning the work, a preconstruction conference will be held <br /> 26 between the Contractor, the Engineer and such other interested parties as may be <br /> 27 invited. The purpose of the preconstruction conference will be: <br /> 28 1. To review the initial progress schedule; <br /> 29 2. To establish a working understanding among the various parties associated or <br /> 30 affected by the work; <br /> 31 3. To establish and review procedures for progress payment, notifications, approvals, <br /> 32 submittals, etc.; <br /> 33 4. To review safety standards and traffic control; and <br /> 34 5. To discuss such other related items as may be pertinent to the work. <br /> 35 <br /> 36 The Contractor shall prepare and submit at the preconstruction conference the following: <br /> 37 1. A breakdown of all lump sum items; <br /> 38 2. A preliminary schedule of working drawing submittals; and <br /> 39 3. A list of material sources for approval if applicable. <br /> 40 <br /> 41 F1-08.0(2).DOCX <br /> 42 Add the following new section: <br /> 43 <br /> 44 1-08.0(2) Hours of Work <br /> 45 (December 8, 2014 APWA GSP) <br /> 46 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 28 <br />