My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4319 CRESCENT AVE 2023-05-11
>
Address Records
>
CRESCENT AVE
>
4319
>
4319 CRESCENT AVE 2023-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 1:11:36 PM
Creation date
5/8/2023 6:41:52 AM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ilr <br /> ALL TILE . . <br /> Remove tile and mark rafter. Position base over rafter, <br /> adjust arm if necessary and torque hardware to 132 in-lbs <br /> (11 ft-lbs). Use base as guide to drill 1/4" pilot holes, back T queto <br /> 32 in-lbs <br /> fill with roofing manufacturer's approved sealant, then <br /> insert lag bolts and tighten until fully seated. Replace tiles /Rafte o <br /> and notch as necessary to ensure proper fit.Attach rails to <br /> either side of slot using Bonding Hardware and torque to <br /> 250 in-lbs (21-ft-lbs). <br /> Position arm near the center of valley for curved tiles. <br /> Position arm away from seam of joining flat tiles. <br /> T <br /> ➢ Ensure top of hook does not extend above rail. ten Until u aliy seated • _lbs <br /> Standalone All Tile Hook manual available on website. <br /> 0 <br /> e� <br /> K01 M K0111 • • . <br /> Remove tile and mark rafter, use Base Plate to mark two <br /> holes on rafter. Drill two 7/32" pilot holes and back fill <br /> with roofing manufacturers' approved sealant. Use 1/2" e <br /> socket to drive lag into place. Slide hook into place and <br /> adjust to desired position. Drive self-tapping screw using <br /> a#3 Phillips bit to lock hook in place. Clean underlayment <br /> and apply a bead of sealant compatible with roofing <br /> manufacturer, install flashing over mount. Fasten sub- <br /> flashing to deck with one roofing nail in each corner. <br /> Waterproof at underlayment level according to roofing <br /> manufacturers' instructions and the Tile Roofing Industry <br /> Alliance guidelines. Cut clearance notch in the weather <br /> guard of tile as needed or utilize QM Tile Replacement <br /> Flashings. Attach rails to either side of slot using Bonding <br /> Hardware and torque to 250 in-lbs (21-ft-lbs). <br /> Position arm near the center of valley for curved tiles. <br /> Position arm away from seam of joining flat tiles. <br /> Ensure top of hook does not extend above rail. <br /> For additional details refer to the full QM Installation Manual. <br /> o 2022 IRONRIDGE, • • INSTALLATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.