My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4319 CRESCENT AVE 2023-05-11
>
Address Records
>
CRESCENT AVE
>
4319
>
4319 CRESCENT AVE 2023-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 1:11:36 PM
Creation date
5/8/2023 6:41:52 AM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ilr <br /> QM QBASE UNIVERSAL TILE MOUNT <br /> Remove tile and mark rafter. Measure up 6 5/8"from <br /> bottom of tiles and mark horizontally.Align QBase over <br /> rafter center and drill two 7/32" pilot holes, back fill with Torque to <br /> roofing manufacturers' approved sealant. Place grade-8 174 in-lbs <br /> Cap Screw under QBase, lag QBase into rafter location. <br /> Install Sub-flashing, waterproof at underlayment level <br /> according to roofing manufacturers' instructions and the <br /> Tile Roofing Industry Alliance guidelines. Cut tile with <br /> diamond blade to allow post to pass through. Place tile <br /> in position and then install Post. Install 18"x18"flashing, <br /> pre-bent to follow the contour of the tile as required.Apply <br /> sealant where Post and Flashing meet and install EPDM <br /> counter flashing. Attach L-Foot on Standoff with hardware. <br /> Torque to 174 in-lbs (14.5 ft-lbs).Attach rails to L-Foot <br /> using Bonding Hardware and torque to 250 in-lbs (21-ft- <br /> lbs). <br /> D For additional details refer to the full QM Installation Manual. <br /> ........................................................................ <br /> ADDITIONAL • • <br /> QM CLASSIC SHAKE MOUNT"_111 <br /> Locate roof rafters and mark locations on roof, remove <br /> shakes directly above mount if needed to expose felt <br /> paper. Level out installation area and location installation <br /> point, mark. Drill 7/32" pilot hole, back fill with roofing <br /> manufacturers' approved sealant. Prepare Hanger Bolt <br /> with Hex Nut and Sealing washer, insert into QBlock hole <br /> and drive into rafter until fully seated and the QBlock no <br /> longer swivels easily. Insert EPDM washer over hanger <br /> bolt and then install L-Foot in desired orientation and <br /> torque hardware to 132 in-lbs (11 ft-lbs).Attach rail to <br /> L-Foot with Bonding Hardware and torque to 250 in-lbs <br /> (21 ft-lbs). <br /> D For additional details refer to the full QM Installation Manual. <br /> QM QBASE <br /> 0 <br /> The QM QBase can be used to install on multiple roofing o <br /> types with different installation methods. <br /> D For instructions on installing the QBase on Slate refer to the full <br /> QM Insta...l.lat.o...n._Ma.n...ual. <br /> D For instructions on installing the QBase on Shake refer to the full <br /> QM Installation Manual. <br /> C For instructions on installing the QBase on Metal Shingle refer to <br /> the full QM Installation._.M...anu.a..l. <br /> O kY� <br /> FLUSH MOUNT INSTALLATION MANUAL-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.