My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4319 CRESCENT AVE 2023-05-11
>
Address Records
>
CRESCENT AVE
>
4319
>
4319 CRESCENT AVE 2023-05-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2023 1:11:36 PM
Creation date
5/8/2023 6:41:52 AM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOW SLOPE ROOFS ilr <br /> FLAT ROOF ATTACHMENT <br /> . <br /> Flat Roof Attachment can be used with an L-foot for flush <br /> mounting modules on low sloped roofs. Mark locations Flat Roof <br /> for Flat Roof Attachment. Screws should be installed Att;achmen <br /> t t--Fof <br /> symmetrically to each other. If using a membrane flashing, Ha250 in-lbs <br /> remove the silicone washer's protective liner prior to _ <br /> attaching the membrane.Attach L-foot with washers and <br /> 3/8" hardware torqued to 250 in-lbs (21 ft-lbs). Seal <br /> attachment and/or membrane per roofing manufacturer's Membrane Flat Roof <br /> requirements. Flashing Attachment <br /> D Type,size,and quantity of roof screws to be specified by <br /> Structural Engineer.Fastener size not to exceed#15. <br /> D Membrane flashing available for TPO,PVC,and KEE roofs. <br /> Ensure membrane flashing is compatible with existing roofing <br /> material. <br /> D If membrane flashing is not used,only washer on top of L-Foot is <br /> required. <br /> D Standalone Flat Roof Attachment Manual available on website. <br /> QM QBASE MOUNT <br /> Torque to <br /> 174 in-lbs <br /> Locate the desired mount placement over a rafter. Using <br /> the base as a template, mark the two penetration <br /> points. Drill two 7/32" pilot holes, back fill with roofing <br /> manufacturers' approved sealant. Place the grade-8 hex <br /> bolt in the bottom of the base and screw the Post.Attach <br /> L-Foot on Standoff with hardware. Torque to 174 in-Ibs <br /> (14.5 ft-lbs). Attach rail to L-Foot with Bonding Hardware <br /> and torque to 250 in-lbs (21 ft-lbs). ov, K moo�tQ° <br /> The mount can be flashed with available 9", 12" or <br /> 18" aluminum flashings, pitch pocket or curb, or with a <br /> membrane cone flashing. If using a membrane flashing Screws provided by <br /> others.Shown for <br /> utilize the services of a qualified roofer refrence <br /> D For additional details refer to the full QM Installation Manual. <br /> METAL ROOF <br /> • <br /> Locate the desired mount placement over a roofing seam, <br /> make sure block is fully seated on metal seam. Torque <br /> Set Screws to 150 in-Ibs(12.5 ft-lbs) using 3/16" Hex <br /> Drive, alternate driving each bolt till required torque is met. <br /> Slide Hex Bolt into slot and to desired position. Place rail Torque to <br /> attachment bracket over Hex Bolt and secure with Flange 150 in-lbs <br /> Nut, torque Flange Nut to 150 in-Ibs(12.5 ft-lbs) using <br /> 1/2" socket. <br /> D For additional details refer to the full QM Installation Manual. <br /> Certification of Lynx calmp includes bonding to both painted and Slide hardware into <br /> desired position <br /> galvalume metal roofs. <br /> o 2022 IRONRIDGE, • • INSTALLATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.