Laserfiche WebLink
CONDUIT PENETRATION FLASHINGSilr <br /> QM CONDUIT - • COMP SHINGLE <br /> Mark a drill point so that the flashing reaches up to the 3rd Nails under the third <br /> shingle course. Drill your conduit hole next to the rafter course <br /> so you can secure the conduit below the roof surface. <br /> Cut shingle and remove nails as needed to center the <br /> drilled hole and flashing hole.Apply roofing manufacturer's <br /> approved sealant on the underside of the flashing in a <br /> Upside down U and to top of flashing. Under the 3rd <br /> course and through the second course secure flashing <br /> with 2 roofing nails, apply sealant over the nail heads. Cut <br /> EPDM collar to appropriate size.Apply a bead of sealant <br /> compatible with the roofing manufacturer and EPDM <br /> rubber to anywhere the EPDM collar contacts. fter <br /> Be sure to secure conduit to rafters below the roof surface per <br /> local building codes and NEC code requirements. <br /> Cut EPDM collar to appropriate size using the sizing chart in the <br /> installation manual,approved for 1/2"to 1"EMT. <br /> C For additional details refer to the full QM Installation Manual. <br /> ..................................................................._... <br /> QM CONDUIT - • <br /> MEL <br /> Drill your conduit hole next to the rafter so that you can <br /> secure the conduit below the roof surface.Apply roofing <br /> manufacturer approve sealant to the underside of the <br /> sub-flashing in the shape of an upside down U. Clear away <br /> any dust and debris to install sub-flashing. Waterproof at <br /> under laminate level according to roofing manufacturer <br /> instructions and Tile Roofing Institute Guidelines. Under <br /> the top layer of felt, secure the sub-flashing with two <br /> roofing nails. Cut EPDM collar to appropriate size. Apply a <br /> bead of sealant compatible with the roofing manufacturer <br /> and EPDM rubber to anywhere the EPDM collar contacts. <br /> With a diamond blade cut tile to allow conduit to pass <br /> through, replace all tiles. Bend the flashing to follow the <br /> contour of the tiles. Place flashing over the conduit and after <br /> tuck up under the next course of tiles.Apply a bead of <br /> sealant compatible with the roofing manufacturer and <br /> EPDM rubber to anywhere the EPDM collar contacts. <br /> Slide collar onto conduit all the way down to the flashing. <br /> lo Be sure to secure conduit to rafters below the roof surface per <br /> local building codes and NEC code requirements. <br /> Cut EPDM collar to appropriate size using the sizing chart in the <br /> installation manual,approved for 1/2"to 1"EMT. <br /> For additional details refer to the full QM Installation Manual. <br /> ........................................................................ <br /> @ 2022 IRONRIDGE,INC.VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL-17 <br />