My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 An entire lot with a CPF of less than 0.75 will be rejected. <br /> 2 <br /> 3 5-04.3(12) Joints <br /> 4 <br /> 5 5-04.3(12)A HMA Joints <br /> 6 <br /> 7 5-04.3(12)A1 Transverse Joints I <br /> 8 The Contractor shall conduct operations such that the placing of the top or wearing <br /> 9 course is a continuous operation or as close to continuous as possible. Unscheduled <br /> 10 transverse joints will be allowed and the roller may pass over the unprotected end of the I <br /> 11 freshly laid mixture only when the placement of the course must be discontinued for such <br /> 12 a length of time that the mixture will cool below compaction temperature. When the Work <br /> 13 is resumed, the previously compacted mixture shall be cut back to produce a slightly I <br /> 14 beveled edge for the full thickness of the course. <br /> 15 <br /> 16 A temporary wedge of HMA constructed on a 20H:1V shall be constructed where a I <br /> 17 transverse joint as a result of paving or planing is open to traffic. The HMA in the <br /> 18 temporary wedge shall be separated from the permanent HMA by strips of heavy <br /> 19 wrapping paper or other methods approved by the Engineer. The wrapping paper shall <br /> 20 be removed and the joint trimmed to a slightly beveled edge for the full thickness of the <br /> 21 course prior to resumption of paving. <br /> 22 I <br /> 23 The material that is cut away shall be wasted and new mix shall be laid against the cut. <br /> 24 Joint sealant and rollers or tamping irons shall be used to seal the joint. <br /> 25 I <br /> 26 5-04.3(12)A2 Longitudinal Joints <br /> 27 The longitudinal joint in any one course shall be offset from the course immediately I <br /> 28 below by not more than 6 inches nor less than 2 inches. All longitudinal joints <br /> 29 constructed in the wearing course shall be located at a lane line or an edge line of the <br /> 30 Traveled Way. A notched wedge joint shall be constructed along all longitudinal joints in I <br /> 31 the wearing surface of new HMA unless otherwise approved by the Engineer. The <br /> 32 notched wedge joint shall have a vertical edge of not less than the maximum aggregate <br /> 33 size or more than '/z of the compacted lift thickness and then taper down on a slope not <br /> 34 steeper than 4H:1V. The sloped portion of the HMA notched wedge joint shall be I <br /> 35 uniformly compacted. <br /> 36 <br /> 37 5-04.3(12)B Bridge Paving Joint Seals I <br /> 38 <br /> 39 5-04.3(12)B1 HMA Sawcut and Seal <br /> 40 Prior to placing HMA on the bridge deck, establish sawcut alignment points at both ends <br /> 41 of the bridge paving joint seals to be placed at the bridge ends, and at interior joints <br /> 42 within the bridge deck when and where shown in the Plans. Establish the sawcut I <br /> 43 alignment points in a manner that they remain functional for use in aligning the sawcut <br /> 44 after placing the overlay. <br /> 45 I <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.