HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Submit a Type 1 Working Drawing consisting of the sealant manufacturer's application <br /> I <br /> 2 procedure. <br /> 3 <br /> 4 Construct the bridge paving joint seal as specified ion the Plans and in accordance with <br /> I 5 the detail shown in the Standard Plans. Construct the sawcut in accordance with the <br /> 6 detail shown in the Standard Plan. Construct the sawcut in accordance with Section 5- <br /> 7 05.3(8)B and the manufacturer's application procedure. <br /> I8 <br /> 9 5-O4.3(12)B2 Paved Panel Joint Seal <br /> 10 Construct the paved panel joint seal in accordance with the requirements specified in <br /> 11 section 5-04.3(12)B1 and the following requirement: <br /> 12 <br /> 13 1. Clean and seal the existing joint between concrete panels in accordance with <br /> 14 Section 5-01.3(8) and the details shown in the Standard Plans. <br /> 15 <br /> I16 5-04.3(13) Surface Smoothness <br /> 17 The completed surface of all courses shall be of uniform texture, smooth, uniform as to <br /> 18 crown and grade, and free from defects of all kinds. The completed surface of the <br /> I <br /> 19 wearing course shall not vary more than '/8 inch from the lower edge of a 10-foot <br /> 20 straightedge placed on the surface parallel to the centerline. The transverse slope of the <br /> 21 completed surface of the wearing course shall vary not more than 'A inch in 10 feet from <br /> I <br /> 22 the rate of transverse slope shown in the Plans. <br /> 23 <br /> I <br /> 24 When deviations in excess of the above tolerances are found that result from a high <br /> 25 place in the HMA, the pavement surface shall be corrected by one of the <br /> 26 following methods: <br /> 27 I 28 1. Removal of material from high places by grinding with an approved grinding <br /> 29 machine, or <br /> 30 2. Removal and replacement of the wearing course of HMA, or <br /> 31 3. By other method approved by the Engineer. <br /> 32 <br /> I 33 Correction of defects shall be carried out until there are no deviations anywhere greater <br /> 34 than the allowable tolerances. <br /> 35 <br /> 36 Deviations in excess of the above tolerances that result from a low place in the HMA and <br /> 37 deviations resulting from a high place where corrective action, in the opinion of the <br /> 38 Engineer, will not produce satisfactory results will be accepted with a price adjustment. <br /> I 39 The Engineer shall deduct from monies due or that may become due to the Contractor <br /> 40 the sum of$500.00 for each and every section of single traffic lane 100 feet in length in <br /> 41 which any excessive deviations described above are found. <br /> I42 <br /> 43 When utility appurtenances such as manhole covers and valve boxes are located in the <br /> 44 traveled way, the utility appurtenances shall be adjusted to the finished grade prior to <br /> I <br /> 45 paving. This requirement may be waived when requested by the Contractor, at the <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> I <br /> WO#3788 March 2,2023 SP-91 <br />