My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 GLF 8-20.4.DOCX <br /> 3 8-20.4 Measurement <br /> 4 <br /> 5 Section 8-20.4 is supplemented with the following: <br /> 6 <br /> 7 (******) I <br /> 8 "Vehicle Loop Detectors", for both loop perimeter and home run, shall be measured by <br /> 9 the linear foot of the neat sawcut line in place in the roadway. No additional measurement <br /> 10 will be made for the installation of lead-in conduit and shall be included in the I <br /> 11 measurement <br /> 12 <br /> 13 "Loop Detector Lead-In Cable" shall be measured by the linear foot of the neat line of 1 <br /> 14 conduit between the controller cabinet and loop splice. No additional measurement will <br /> 15 be made for coiled loop detector cable in junction boxes or cabinets. <br /> 16 I 17 "Conduit Pipe 2 In. Diam." shall be measured by the linear foot of the neat line of conduit <br /> 18 between the junction box and the curb line. No additional measurement will be made for <br /> 19 sweeps or elbows in junction boxes or at the curb line. <br /> 20 <br /> 21 GLF 8-20.5.DOCX <br /> 22 8-20.5 Payment <br /> 23 I 24 Section 8-20.5 is supplemented with the following: <br /> 25 <br /> 26 (******) 111 <br /> 27 "Vehicle Loop Detectors," per linear foot. <br /> 28 1 29 The unit contract price shall include saw cutting, cleaning and drying of pavement, <br /> 30 installing loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and <br /> 31 splicing between loop wire and lead-on cable, any work necessary to access a junction <br /> 32 box and testing of the vehicle detectors as defined in Section 8-20.3(14)D. <br /> 33 <br /> 34 No payment shall be made for any loops that are not spliced and fully operational, <br /> 35 including any loop detector lead in cable required to make the loop operational. <br /> 36 <br /> 37 "Loop Detector Lead-In Cable", per linear foot. <br /> 38 <br /> 39 The unit contract price shall be full pay for furnishing and installing each loop detector <br /> 40 lead-In cable in existing conduits between the traffic signal control cabinet and loop splice <br /> 41 point, including all and all other Work necessary terminate loop lead in cable at either end. <br /> 42 <br /> 43 No payment shall be made for any detector lead-in cable that is not spliced and fully <br /> 44 operational, including any testing required to make the loop operational. I <br /> 45 <br /> 46 "Conduit Pipe 2 In. Diam.", per linear foot. <br /> 47 The unit contract price shall be full pay as described in this Section for furnishing and <br /> 48 installing each conduit stub-out where shown in the Plans, including furnishing all conduit, <br /> i <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.