Laserfiche WebLink
I <br /> 1 elbows, bends, and fittings for placing the pipe in accordance with the above provisions, <br /> I2 including all excavation or jacking required, backfilling of any voids around stub out, pits, <br /> 3 or trenches; bedding of the pipe, chipping of pavement, and all other Work necessary for <br /> 4 the construction of the conduit stub-out. <br /> I 5 <br /> 6 "Video Detection System ", lump sum. <br /> 7 <br /> I 8 The lump sum Contract price for"Video Detection System ", shall be full pay for the <br /> 9 construction of the complete video detection system as described above and as shown <br /> 10 in the Plans, and herein specified, including complete installation of owner furnished <br /> II I <br /> materials to provide a fully functioning video detection system at the location described. <br /> 12 The Contract price shall include restoring facilities destroyed or damaged during <br /> 13 construction, salvaging existing materials, and for making all required tests.All additional <br /> 14 materials and labor, not shown in the Plans or called for herein and which are required to <br /> I15 complete the video detection system, shall be included in the lump sum Contract price. <br /> 16 Removal and salvage of existing materials associated with the construction not shown in <br /> 17 the Plans or called for herein and which are required to complete the video detection <br /> I 18 system, shall be included in the lump sum Contract price. <br /> 19 <br /> 20 <br /> I 21 CNH 8-22.DOCX <br /> 22 8-22 PAVEMENT MARKING <br /> 23 <br /> I 24 8-22.2 Materials <br /> 25 <br /> 26 Section 8-22.2 is supplemented with the following: <br /> I 27 <br /> 28 (*****.) <br /> 29 All plastic marking shall be Type D. <br /> I 30 <br /> 31 8-22.3 Construction Requirements <br /> 32 <br /> I 33 Section 8-22.3 is supplemented with the following: <br /> 34 <br /> 35 (******) <br /> I36 Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> 37 Specifications with the following modifications: <br /> 38 <br /> 39 1. All Stop Line shall be 24" wide Type D extruded plastic flat line. Spray Type D is <br /> 40 not allowed. <br /> I 41 2. All Crosswalk Line shall be solid white lines, 24"wide, installed in accordance with <br /> 42 City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic <br /> 43 flat line. Spray Type D is not allowed. <br /> I44 3. All two-way left turn yellow lines and lane lines dividing two opposing directions of <br /> 45 travel shall be Type D plastic flat line. <br /> 46 4. Profiled plastic Type D material, where called for in the Appendices to the Special <br /> 47 Provisions and Plans. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-107 <br />