My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 lines, and crosswalks shall be laid out with a rope. Field layout for curves and <br /> I2 tapers shall use an 800' minimum length rope. The color of the material used <br /> 3 for preliminary spotting shall be white. Longitudinal marking shall be parallel <br /> 4 with the proposed line applied with a paint marker wand or other approved <br /> I 5 method, a minimum of 6 inches in length and wide enough so that a minimum <br /> 6 of two marks can be clearly seen at night under ordinary headlight conditions. <br /> 7 Refreshing of marks prior to striping shall be the responsibility of the Contractor. <br /> I 8 <br /> 9 Personnel performing the field layout and preliminary spotting shall be proficient <br /> 10 in the practice of striping layout, including layout and preliminary spotting of <br /> 11 curves and tapers using a rope and paint wand, proper annotation on the <br /> 12 pavement of starts, stops, and changes in line type for pavement markings, and <br /> 13 an understanding of WSDOT Standard Plans and City Standard Drawings for <br /> 14 pavement markings. <br /> I15 <br /> 16 Survey personnel performing the calculations, notes, and layout data shall be <br /> 17 on site to answer questions regarding the layout notes as the roadway is being <br /> I 18 spotted or shall perform the work. In the event a revision is required by the <br /> 19 Contracting Agency during field layout, either to correct errors in the notes or to <br /> 20 make minor revision noted in the ordinary progress of the work, field layout shall <br /> 21 be performed by the Contractor at the time. <br /> 22 <br /> 23 All field layout and temporary pavement marking shall be completed during the <br /> I 24 same shift as the striping is obliterated by grinding or paving unless otherwise <br /> 25 directed by the Engineer. <br /> 26 Permanent pavement marking shall not begin until the layout is approved by the <br /> 27 Contracting Agency. Such approval shall not relieve the Contractor of <br /> I 28 responsibility for the accuracy of the field markings. <br /> 29 <br /> 30 Payment <br /> I31 <br /> 32 All costs associated with layout of temporary striping shall be included in the <br /> 33 associated bid items for pavement marking and shall be full pay for all labor, <br /> I 34 equipment, materials, and supervision utilized to perform the Work specified for <br /> 35 layout and preliminary spotting of pavement markings, including any <br /> 36 resurveying, checking, correction of errors, replacement of missing or damaged <br /> I 37 markings, and coordination efforts. <br /> 38 <br /> 39 8-22.3(2) Preparation of Roadway Surfaces <br /> I 40 <br /> 41 Section 8-22.3(2) is supplemented with the following: <br /> 42 <br /> i43 (******) <br /> 44 Apply materials to new HMA that is sufficiently cured according to the manufacturer's <br /> I 45 recommendation. Permanent paint marking material applied to new HMA require a <br /> 46 pavement cure period of at least 21 days. Permanent Type D marking material <br /> 47 applied to new HMA require a pavement cure period of at least 10 days. <br /> i48 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO03788 March 2,2023 SP-109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.