My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 2 Within 20 calendar days after the award date, the successful bidder shall return <br /> 3 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 4 by Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the <br /> I <br /> 5 6 Transfer of Coverage form for the Construction Stormwater General Permit with sections <br /> I, III, and VIII completed when provided. Before execution of the contract by the <br /> 7 Contracting Agency, the successful bidder shall provide any pre-award information the <br /> I 8 Contracting Agency may require under Section 1-02.15. <br /> 9 <br /> 10 Until the Contracting Agency executes a contract, no proposal shall bind the Contracting <br /> Il 1 Agency nor shall any work begin within the project limits or within Contracting Agency- <br /> 12 furnished sites. The Contractor shall bear all risks for any work begun outside such areas <br /> 13 and for any materials ordered before the contract is executed by the Contracting Agency. <br /> 14 <br /> I <br /> 15 If the bidder experiences circumstances beyond their control that prevents return of the <br /> 16 contract documents within the calendar days after the award date stated above, the <br /> 17 Contracting Agency may grant up to a maximum of 20 additional calendar days <br /> I <br /> 18 for return of the documents, provided the Contracting Agency deems the circumstances <br /> 19 warrant it. <br /> 20 <br /> I 21 1-03.4.RTF <br /> 22 1-03.4 Contract Bond <br /> 23 (July 23, 2015 APWA GSP) <br /> I 24 <br /> 25 Delete the first paragraph and replace it with the following: <br /> 26 <br /> I <br /> 27 The successful bidder shall provide executed payment and performance bond(s) for the <br /> 28 full contract amount. The bond may be a combined payment and performance bond; or <br /> 29 be separate payment and performance bonds. In the case of separate payment and <br /> 30 performance bonds, each shall be for the full contract amount. The bond(s) shall: <br /> I31 1. Be on Contracting Agency-furnished form(s); <br /> 32 2. Be signed by an approved surety (or sureties) that: <br /> I <br /> 33 34 a. Is registered with the Washington State Insurance Commissioner, and <br /> b. Appears on the current Authorized Insurance List in the State of Washington <br /> 35 published by the Office of the Insurance Commissioner, <br /> I 36 3. Guarantee that the Contractor will perform and comply with all obligations, duties, <br /> 37 and conditions under the Contract, including but not limited to the duty and obligation <br /> 38 to indemnify, defend, and protect the Contracting Agency against all losses and <br /> I <br /> 39 claims related directly or indirectly from any failure: <br /> 40 a. Of the Contractor (or any of the employees, subcontractors, or lower tier <br /> 41 subcontractors of the Contractor) to faithfully perform and comply with all contract <br /> 42 obligations, conditions, and duties, or <br /> I43 b. Of the Contractor (or the subcontractors or lower tier subcontractors of the <br /> 44 Contractor) to pay all laborers, mechanics, subcontractors, lower tier <br /> 45 subcontractors, material person, or any other person who provides supplies or <br /> I46 provisions for carrying out the work; <br /> 47 4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the <br /> 48 project under titles 50, 51, and 82 RCW; and <br /> I49 5. Be accompanied by a power of attorney for the Surety's officer empowered to sign <br /> 50 the bond; and <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.