Laserfiche WebLink
1 6. Be signed by an officer of the Contractor empowered to sign official statements (sole <br /> 2 proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed <br /> 3 by the president or vice president, unless accompanied by written proof of the <br /> 4 authority of the individual signing the bond(s) to bind the corporation (i.e., corporate <br /> 5 resolution, power of attorney, or a letter to such effect signed by the president or vice <br /> 6 president). <br /> 7 <br /> 8 1-03.7.RTF <br /> 9 1-03.7 Judicial Review <br /> 10 (November 30, 2018 APWA GSP) <br /> 11 <br /> 12 Revise this section to read: <br /> 13 <br /> 14 Any decision made by the Contracting Agency regarding the Award and execution of the <br /> 15 Contract or Bid rejection shall be conclusive subject to the scope of judicial review <br /> 16 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br /> 17 Court of the county where the Contracting Agency headquarters is located, provided that <br /> 18 where an action is asserted against a county, RCW 36.01.050 shall control venue and <br /> 19 jurisdiction. <br /> 20 <br /> 21 1-04.2.RTF <br /> 22 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 23 Specifications, and Addenda <br /> 24 (December 10, 2020 APWA GSP) <br /> 25 <br /> 26 Revise the second paragraph to read: <br /> 27 <br /> 28 Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> 29 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 30 1. Addenda, <br /> 31 2. Proposal Form, <br /> 32 3. Special Provisions, <br /> 33 4. Contract Plans, <br /> 34 5. Standard Specifications, <br /> 35 6. Contracting Agency's Standard Plans or Details (if any), and <br /> 36 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 37 <br /> 38 1-05.11.RTF <br /> 39 1-05.11 Final Inspection <br /> 40 <br /> 41 Delete this section and replace it with the following: <br /> 42 <br /> 43 1-05.11 Final Inspections and Operational Testing <br /> 44 (October 1, 2005 APWA GSP) <br /> 45 <br /> 46 1-05.11(1) Substantial Completion Date <br /> 47 <br /> 48 When the Contractor considers the work to be substantially complete, the Contractor <br /> 49 shall so notify the Engineer and request the Engineer establish the Substantial <br /> 50 Completion Date. The Contractor's request shall list the specific items of work that <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-12 <br />