My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6. Be signed by an officer of the Contractor empowered to sign official statements (sole <br /> 2 proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed <br /> 3 by the president or vice president, unless accompanied by written proof of the <br /> 4 authority of the individual signing the bond(s) to bind the corporation (i.e., corporate <br /> 5 resolution, power of attorney, or a letter to such effect signed by the president or vice <br /> 6 president). <br /> 7 <br /> 8 1-03.7.RTF <br /> 9 1-03.7 Judicial Review <br /> 10 (November 30, 2018 APWA GSP) <br /> 11 <br /> 12 Revise this section to read: <br /> 13 <br /> 14 Any decision made by the Contracting Agency regarding the Award and execution of the <br /> 15 Contract or Bid rejection shall be conclusive subject to the scope of judicial review <br /> 16 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br /> 17 Court of the county where the Contracting Agency headquarters is located, provided that <br /> 18 where an action is asserted against a county, RCW 36.01.050 shall control venue and <br /> 19 jurisdiction. <br /> 20 <br /> 21 1-04.2.RTF <br /> 22 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, <br /> 23 Specifications, and Addenda <br /> 24 (December 10, 2020 APWA GSP) <br /> 25 <br /> 26 Revise the second paragraph to read: <br /> 27 <br /> 28 Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> 29 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 30 1. Addenda, <br /> 31 2. Proposal Form, <br /> 32 3. Special Provisions, <br /> 33 4. Contract Plans, <br /> 34 5. Standard Specifications, <br /> 35 6. Contracting Agency's Standard Plans or Details (if any), and <br /> 36 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 37 <br /> 38 1-05.11.RTF <br /> 39 1-05.11 Final Inspection <br /> 40 <br /> 41 Delete this section and replace it with the following: <br /> 42 <br /> 43 1-05.11 Final Inspections and Operational Testing <br /> 44 (October 1, 2005 APWA GSP) <br /> 45 <br /> 46 1-05.11(1) Substantial Completion Date <br /> 47 <br /> 48 When the Contractor considers the work to be substantially complete, the Contractor <br /> 49 shall so notify the Engineer and request the Engineer establish the Substantial <br /> 50 Completion Date. The Contractor's request shall list the specific items of work that <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.