Laserfiche WebLink
' 1 1. Considering the work performed on Saturdays, Sundays, and holidays as working <br /> 2 days with regard to the contract time. <br /> 3 2. Considering multiple work shifts as multiple working days with respect to contract <br /> ' 4 time even though the multiple shifts occur in a single 24-hour period. <br /> 5 3. If a 4-10 work schedule is requested and approved the non working day for the <br /> 6 week will be charged as a working day. <br /> 7 4. If Davis Bacon wage rates apply to this Contract, all requirements must be met and <br /> 8 recorded properly on certified payroll <br /> 9 <br /> 10 1-08.1.OptionA.RTF <br /> 11 1-08.1 Subcontracting <br /> 12 (December 19, 2019 APWA GSP, Option A) <br /> I 13 <br /> 14 Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor shall <br /> 15 submit to the Engineer a certification (WSDOT Form 420-004) that a written agreement <br /> ' 16 between the Contractor and the subcontractor or between the subcontractor and any lower <br /> 17 tier subcontractor has been executed. This certification shall also guarantee that these <br /> 18 subcontract agreements include all the documents required by the Special Provision Federal <br /> 19 Agency Inspection. <br /> 20 <br /> 21 A Subcontractor or lower tier Subcontractor will not be permitted to perform any work under <br /> 22 the contract until the following documents have been completed and submitted to the <br /> 23 Engineer: <br /> 24 <br /> 25 1. Request to Sublet Work (WSDOT Form 421-012), and <br /> ' 26 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal-aid <br /> 27 Projects (WSDOT Form 420-004). <br /> 28 <br /> 29 The Contractor shall submit to the Engineer a completed Monthly Retainage Report <br /> 30 (WSDOT Form 272-065) within 15 calendar days after receipt of every monthly progress <br /> 31 payment until every Subcontractor and lower tier Subcontractor's retainage has been <br /> 32 released. <br /> 33 <br /> 34 The ninth paragraph, beginning with "On all projects, ..." is revised to read: <br /> 35 <br /> 36 The Contractor shall certify to the actual amount received from the Contracting Agency <br /> 37 and amounts paid to all firms that were used as Subcontractors, lower tier <br /> 38 subcontractors, manufacturers, regular dealers, or service providers on the Contract. <br /> 39 This includes all Disadvantaged, Minority, Small, Veteran or Women's Business <br /> 40 Enterprise firms. This Certification shall be submitted to the Engineer on a monthly basis <br /> 41 each month between Execution of the Contract and Physical Completion of the Contract <br /> ' 42 43 using the application available at: https://wsdot.diversitycompliance.com. A monthly <br /> report shall be submitted for every month between Execution of the Contract and <br /> 44 Physical Completion regardless of whether payments were made or work occurred. <br /> 45 <br /> 46 1-08.3.GR1 <br /> 47 Progress Schedule <br /> I 48 <br /> 49 COE1-08.3(2)A.RTF <br /> 50 1-08.3(2)A Type A Progress Schedule <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-57 <br />