My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 1. Considering the work performed on Saturdays, Sundays, and holidays as working <br /> 2 days with regard to the contract time. <br /> 3 2. Considering multiple work shifts as multiple working days with respect to contract <br /> ' 4 time even though the multiple shifts occur in a single 24-hour period. <br /> 5 3. If a 4-10 work schedule is requested and approved the non working day for the <br /> 6 week will be charged as a working day. <br /> 7 4. If Davis Bacon wage rates apply to this Contract, all requirements must be met and <br /> 8 recorded properly on certified payroll <br /> 9 <br /> 10 1-08.1.OptionA.RTF <br /> 11 1-08.1 Subcontracting <br /> 12 (December 19, 2019 APWA GSP, Option A) <br /> I 13 <br /> 14 Prior to any subcontractor or lower tier subcontractor beginning work, the Contractor shall <br /> 15 submit to the Engineer a certification (WSDOT Form 420-004) that a written agreement <br /> ' 16 between the Contractor and the subcontractor or between the subcontractor and any lower <br /> 17 tier subcontractor has been executed. This certification shall also guarantee that these <br /> 18 subcontract agreements include all the documents required by the Special Provision Federal <br /> 19 Agency Inspection. <br /> 20 <br /> 21 A Subcontractor or lower tier Subcontractor will not be permitted to perform any work under <br /> 22 the contract until the following documents have been completed and submitted to the <br /> 23 Engineer: <br /> 24 <br /> 25 1. Request to Sublet Work (WSDOT Form 421-012), and <br /> ' 26 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for Federal-aid <br /> 27 Projects (WSDOT Form 420-004). <br /> 28 <br /> 29 The Contractor shall submit to the Engineer a completed Monthly Retainage Report <br /> 30 (WSDOT Form 272-065) within 15 calendar days after receipt of every monthly progress <br /> 31 payment until every Subcontractor and lower tier Subcontractor's retainage has been <br /> 32 released. <br /> 33 <br /> 34 The ninth paragraph, beginning with "On all projects, ..." is revised to read: <br /> 35 <br /> 36 The Contractor shall certify to the actual amount received from the Contracting Agency <br /> 37 and amounts paid to all firms that were used as Subcontractors, lower tier <br /> 38 subcontractors, manufacturers, regular dealers, or service providers on the Contract. <br /> 39 This includes all Disadvantaged, Minority, Small, Veteran or Women's Business <br /> 40 Enterprise firms. This Certification shall be submitted to the Engineer on a monthly basis <br /> 41 each month between Execution of the Contract and Physical Completion of the Contract <br /> ' 42 43 using the application available at: https://wsdot.diversitycompliance.com. A monthly <br /> report shall be submitted for every month between Execution of the Contract and <br /> 44 Physical Completion regardless of whether payments were made or work occurred. <br /> 45 <br /> 46 1-08.3.GR1 <br /> 47 Progress Schedule <br /> I 48 <br /> 49 COE1-08.3(2)A.RTF <br /> 50 1-08.3(2)A Type A Progress Schedule <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.