My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1-08.5.OptionA.RTF <br /> I2 1-08.5 Time for Completion <br /> 3 (January 19, 2022 APWA GSP, Option A) <br /> 4 <br /> I 5 Revise the third and fourth paragraphs to read: <br /> 6 <br /> 7 Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> I 8 <br /> 9 Each working day shall be charged to the contract as it occurs, until the contract work is <br /> 10 physically complete. If substantial completion has been granted and all the authorized <br /> Ii 1 working days have been used, charging of working days will cease. Each week the <br /> 12 Engineer will provide the Contractor a statement that shows the number of working days: <br /> 13 (1) charged to the contract the week before; (2) specified for the physical completion of <br /> I <br /> 14 the contract; and (3) remaining for the physical completion of the contract. The <br /> 15 statement will also show the nonworking days and any partial or whole day the Engineer <br /> 16 declares as unworkable The statement will be identified as a Written Determination by <br /> 17 the Engineer. If the Contractor does not agree with the Written Determination of working <br /> I <br /> 18 days, the Contractor shall pursue the protest procedures in accordance with Section 1- <br /> 19 04.5. By failing to follow the procedures of Section 1-04.5, the Contractor shall be <br /> 20 deemed as having accepted the statement as correct. If the Contractor is approved to <br /> I <br /> 21 work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week <br /> 22 in which a 4-10 shift is worked would ordinarily be charged as a working day then the <br /> 23 fifth day of that week will be charged as a working day whether or not the Contractor <br /> I <br /> 24 works on that day. <br /> 25 <br /> 26 Revise the sixth paragraph to read: <br /> I 27 <br /> 28 The Engineer will give the Contractor written notice of the completion date of the contract <br /> 29 after all the Contractor's obligations under the contract have been performed by the <br /> I <br /> 30 Contractor. The following events must occur before the Completion Date can be <br /> 31 established: <br /> 32 1. The physical work on the project must be complete; and <br /> I <br /> 33 2. The Contractor must furnish all documentation required by the contract and required <br /> 34 by law, to allow the Contracting Agency to process final acceptance of the contract. <br /> 35 The following documents must be received by the Project Engineer prior to <br /> I <br /> 36 establishing a completion date: <br /> 37 a. Certified Payrolls (per Section 1-07.9(5)). <br /> 38 b. Material Acceptance Certification Documents <br /> I <br /> 39 c. Monthly Reports of Amounts Credited as DBE Participation, as required by the <br /> 40 Contract Provisions. <br /> 41 d. Final Contract Voucher Certification <br /> I <br /> 42 e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> 43 and all Subcontractors <br /> 44 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> I45 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 46 Notice of Termination by Ecology; and no rejection of the Notice of Termination <br /> 47 by Ecology. This requirement will not apply if the Construction Stormwater <br /> I 48 General Permit is transferred back to the Contracting Agency in accordance with <br /> 49 Section 8-01.3(16). <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> I <br /> WO#3788 March 2,2023 SP-59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.